PROJECT DETAILS
HOME
Upper Sindh I
1.
Year of commissioning
1973-74
2.
Installed capacity
2x 1.30MW = 22.6MW
3.
Present derated capacity
14MW
4.
Head
149 M
5.
Length of water Conductor
11 KM
6.
Design discharge capacity
425 cusecs
.