Tender Notifications-2019
Pre Bid Notifications
Description | No. | Date | Link |
---|---|---|---|
Opening of bids for PMDP projects Ans-II, Phagla and Tamasha on 14th December at Jammu | 10.12.2019 | Notice | |
Replies to Pre-bid queries for Ans-II | 28.11.2019 | Replies | |
Replies to Pre-bid queries for Phagla HEP | 28.11.2019 | Replies | |
Replies to Pre-bid queries for Tamasha HEP | 28.11.2019 | Replies | |
EPC Bid opening for PMDP Ans-II, Tamasha and Phagla HEPs on 10th October | 01.10.2019 | Notice | |
EPC Bid opening for PMDP Ans-II, Tamasha and Phagla HEPs on 28th September | 24.09.2019 | Notice | |
Bid opening notice - Ans-II, Phagla and Tamasha | 05.09.2019 | Notice | |
Replies to bidder queries - Phagla | 01.09.2019 | Replies to Bidder Queries | |
Replies to bidder queries - Ans | 26.07.2019 | Replies to Bidder Queries | |
Prebid Meeting of Tamasha HEP on 20th July 2019 | 17.07.2019 | Prebid meeting notice for Tamasha HEP | |
Prebid Meeting of Ans and Phagla | 03.07.2019 | Ans and Phagla Prebid meeting notice | |
Replies to addl queries - durbuk shyok hep | 11.05.2019 | Durbok Shyok Replies to Queries | |
Replies to pre-bid queries for Ans-II, Phagla and Tamasha | 27.04.2019 |
Ans-II Phagla Tamasha |
|
Pre-bid meeting proceedings for Green Building Jammu | 15.04.2019 | Click here | |
Corrigendum 1 - Replies to bidder queries for 19 MW Durbok Shyok issued on 20-03-2018 | 09.03.2019 | Click here | |
Prebid meeting schedule for Ans-II, Phagla and Tamasha HEP on 27th March 2019 | 25.03.2019 | Click here | |
Replies to Pre-bid queries for Durbuk-Shyok 19 MW | 20.03.2019 | Click here | |
Final Pre-bid queries 17 MW Markoot HEP | 20.03.2019 | Click here | |
Replies to Pre-bid queries 17 MW Markoot HEP | 09.01.2019 | Click here | |
Pre-bid meeting notice 17 MW Markoot HEP | 29.12.2018 | Click here | |
Works Tenders
Description | NIT NO. | Date | Associated eNIT No | Project | Type of Work | Location of Work | Cost of Work | Time of Completion | Link | |
---|---|---|---|---|---|---|---|---|---|---|
1. Repairs , Renovation to Gypsy Huts to be utilized as Night Quarters for drivers in compound of Divisional office Bemina Srinagar. 2. Flooring of Chief Engineer’s office |
01 of 2019-20 | 31.12.2019 | 2019 _SPDC_89470_1 2019 _SPDC_89470_2 |
CID | Civil | Bemina, JK | see document | see document | NIT | |
1. Provision for gang coolie/helper/canal patroller through contractor, repair and black topping / tiling of approach road to CHEP-II and repair to water supply and bathroom 2. Removal of slips/checking of slips by laying of crates and masonry wall along the right bank of water conductor from RD 1560M to 5018 M of CHEP-III in between RD 2200-2600, 3500-4000 (vulnerable portion) 3. Stabilization of sliding area downhill side of W/C by providing check wall between RD 59000 -60000 of W/C of CHEP-I 4. Restoration/construction of R wall opp. Peer baba of CHEP-I |
E-NIT No: 24 of 2019-20 | 26.12.2019 |
1. 2019_SPDC_72288_1 2. 2019_SPDC_72288_2 3. 2019_SPDC_72288_3 4. 2019_SPDC_72288_4 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Notice | |
Extension of NIT EE/CID/PDC/SPR/06 of 2019 | EE/CID/PDC/SPR/788-96 | 30.12.2019 | XEN CID Sopore | Civil | Sopore, JK | Extension Corrigendum | ||||
Procurement of Survey Items (GPS, Measuring Tapes and Digital Planimeter etc.) | EE/CID/PDC/SPR/ 09 OF 2019 | 28.12.2019 | XEN CID Sopore | Civil | Sopore, JK | 1.15 lacs | 90 days | NIT | ||
Supply of Sunshade size 13’ x 7’ incl Hardware i.e Arms, Gear Box, Handle Ball Clamps, Frame etc at JKSPDC Guest House Janipur, Jammu | ESSDJ/609-12 | 26.12.2019 | Estates | Civil works | Jammu, JK | NIT | ||||
Renovations and Modernisation of 9 MW (3X3 MW) SEWA Hydel Project Stage - III inclusive of Design, Engineering, Reverse Engineering, supply, erection, Testing & Commissioning of various equipments and material, including civil works and other allied works at Hutt Mashka, Teh. Basholi, Distt. Kathua, JK. | e-NIT 02 OF 2019-20 | 23.12.2019 | Sewa HEP – III | Civil | Hut Mashka, Basohli, JK | Rs. 1447.335 lacs | 18 Months | Extension Notice | ||
Supply of Mahindra Scorpio vehicle | USHP II/GD/Tech/877 | 24.12.2019 | USHP-II | Kangan, JK | NIO | |||||
Supply of laptops, desktops, xerox machines and printers | USHP II/GD/Tech/875 | 24.12.2019 | USHP-II | Electrical | Kangan, JK | NIO | ||||
Supply of DT Cone | USHP II/GD/Tech/879 | 24.12.2019 | USHP-II | Electrical | Kangan, JK | NIO | ||||
Supply, installation, commissioning and testing of oil circulation pump motor | USHP II/GD/Tech/867 | 24.12.2019 | USHP-II | Electrical | Kangan, JK | NIO | ||||
Supply, installation, commissioning and testing of high pressure stator cooler inlet valves | USHP II/GD/Tech/871 | 24.12.2019 | USHP-II | Electrical | Kangan, JK | NIO | ||||
Supply of desktop and printer | USHP II/GD/Tech/876 | 24.12.2019 | USHP-II | Electrical | Kangan, JK | NIO | ||||
Supply of 2 volt exide chloride battery | USHP II/GD/Tech/874 | 24.12.2019 | USHP-II | Electrical | Kangan, JK | NIO | ||||
Supply of MCCB controls of different auxillaries | USHP II/GD/Tech/873 | 24.12.2019 | USHP-II | Electrical | Kangan, JK | NIO | ||||
Supply, installation, commissioning and testing of Current and PT Tranformers. | USHP II/GD/Tech/872 | 24.12.2019 | USHP-II | Electrical | Kangan, JK | NIO | ||||
Supply, installation, commissioning and testing of VLR battery bank. | USHP II/GD/Tech/870 | 24.12.2019 | USHP-II | Electrical | Kangan, JK | NIO | ||||
Rebabating of LGB Pads | USHP II/GD/Tech/865 | 24.12.2019 | USHP-II | Electrical | Kangan, JK | NIO | ||||
Supply, installation, testing and commissioning of new 220 volt, 1000Ah Digital battery charger | USHP II/GD/Tech/869 | 24.12.2019 | USHP-II | Electrical | Kangan, JK | NIO | ||||
Automation of 05 no. dewatering pump sets and 6 nos. oil leakage motors of governor and MIV, including providing and fitting of water level/oil level sensors, alarm and trip circuits. | USHP II/GD/Tech/866 | 24.12.2019 | USHP-II | Electrical | Kangan, JK | NIO | ||||
Providing and fixing chain link fencing around JKPDC Land at Pazalpora Bandipora. | EE/CID/PDC/SPR/08 OF 2019 | 23.12.2019 | 2019_SPDC_89097_1 | XEN CID Sopore | Civil | Sopore, JK | 5.0 lacs | 90 days | NIT | |
Supply of Electrical work material i.e. Re-wiring of main building at JKSPDC Guest House Janipur, Jammu | ESSDJ/596-99 | 21.12.2019 | Estates | Electrical works | Jammu, JK | NIT | ||||
Engagement of Chartered Account for ERP Accounting Support for FY 2019-20 and 2020-21 | eNIT No 5 | 19.12.2019 | See jktenders.nic.in | Service | Jammu, JK | see document | see document | NIT
Gist of NIT |
||
1. Chain Link Fencing of Power House Land at Kallar Mohra, Teh.-Mendhar District- Poonch 2. Chain Link Fencing of Surge Shaft Land at Bhatadurian, Teh. -Mendhar District- Poonch |
eNIT No 2 | 17.12.2019 | See jktenders.nic.in | Civil Works | Jammu, JK | 64.34 lacs | see document | NIT | ||
1. Renovation/up gradation of approach road to power house of CHEP-III including black topping and construction of drain/R wall (with paver) (5th call) 2. Renovation of inspection road along spill channel of CHEP-III (with paver and manually) (5th call) 3. Restoration/blacktopping of road in Chenani Hydel Project colony Udhampur (with paver) (5h call) |
E-NIT No: 23 of 2019-20 | 14.12.2019 |
1. 2019_SPDC_88282_1 2. 2019_SPDC_88282_2 3. 2019_SPDC_88282_3 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Notice | |
Plugging of leakages in RCC Pressure Duct CHEP-III by way of pressure grouting /micro concreting so as to plug the remaining leakages as well as strengthening of pressure Duct including laying of wet mixed macadam from B/R to surge shaft and chain link fencing for safeguarding PDC land (Shut down work). | E-NIT No: 22 of 2019-20 | 14.12.2019 | 2019_SPDC_88281_1 | XEN CCD UDHM | Civil | Udhampur, JK | 33.00 Lacs | 30 working days | Notice | |
Consultancy services for framing of BID document for 930 MW Kirthai-II | JKPDCL/P-214/K-2/2397-2403 | 16.12.2019 | See jktenders.nic.in | Service | Jammu, JK | see document | see document | NIT | ||
RMU Works of CHEP-II | GEN/PDC/U/1537 | 13.12.2019 | Gen Division Udhampur | RMU Works | Udhampur | NIT | ||||
Corrigendum Notice of e-NIT 02 OF 2019-20 | CE/Gen/J/1898-1903 | 12.12.2019 | Sewa HEP – III | Civil | Hut Mashka, Basohli, JK | Rs. 1447.335 lacs | 18 Months | Corrigendum | ||
Cancellation of consultancy services for framing of BID document for 930 MW Kirthai-II | JKPDCL/P-214/K-2/2/32-38 | 09.12.2019 | 2017_SPDC_38934_1 | Service | Jammu, JK | see document | see document | Cancellation Notice | ||
Several works like landscapping, fixing of CGI sheets, installation of gauge | EE/CID/PDC/SPR/06 of 2019 | 07.12.2019 | XEN CID Sopore | Civil | Sopore, JK | NIT | ||||
Repair and Renovation of Divisional Office, Sopore | EE/CID/PDC/SPR/05 of 2019 | 07.12.2019 | XEN CID Sopore | Civil | Sopore, JK | NIT | ||||
Repair/Replacement of Unserviceable lights in various Adits of Power House BHEP-II including Right Bank Tunnel, vehicle Access Door and bottom to Pressure Shaft Etc. | e-NIT 04 of 2019-20 | 06.12.2019 | BHEP | Mechanical | Chanderkote, JK | 180 days | NIT | |||
Corrigendum of Tamasha and Phagla HEP PMDP | JKSPDC/PMDP/P-280/1978-82 | 06.12.2019 | see jktenders.gov.in | Service | Jammu, JK | see document | see document | Corrigendum NIT | ||
1. Fencing of water conductor at Suwna near high school including construction of padestial bridge over WC 2. Construction of bathroom in stores including water supply facilities (Power house CHEP-I) 3. Floor tiling in left over portion in 4 hall (Power house CHEP-I) 4. Construction of Bathroom at power house and switch yard (Power house CHEP-I) 5. Repair and blacktopping of approach road (Power house CHEP-I) 6. Repair of shift staff quarters at Forebay of CHEP-I |
E-NIT No: 21 of 2019-20 | 30.11.2019 |
1. 2019_SPDC_87160_1 2. 2019_SPDC_87160_2 3. 2019_SPDC_87164_1 4. 2019_SPDC_87160_3 5. 2019_SPDC_87160_5 6. 2019_SPDC_87160_6 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Notice | |
1. Clearance of road causeway, restoration of water conductor, cross drainage, inspection road, escape and spill channel CHEP-II 2. Strengthening of water conductor, inspection road, cross drainage RD (-) 700 m to 1560 M CHEP-III 3. Repair /Renovation of Crates near outfall at the confluence point of spill channel with River Tawi (Shut down work) |
E-NIT No: 20 of 2019-20 | 28.11.2019 |
2019_SPDC_86982_1 2019_SPDC_86982_2 2019_SPDC_86982_3 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Notice | |
Different works of CHEP-I, II and III | GEN/PDC/U/1484-90 | 03.12.2019 | 2019_SPDC_87347_1 | Gen Division Udhampur | Several Works | Udhampur | NIT | |||
Corrigendum of Ans HEP PMDP | JKSPDC/PMDP/P-280/1874-78 | 03.12.2019 | see jktenders.gov.in | Service | Jammu, JK | see document | see document | Corrigendum NIT | ||
Extension Notice of Ans, Phagla and Tamasha HEP | JKSPDC/PMDP-2015/P-280/PHEP(3)/1757-61 | 02.12.2019 | see jktenders.gov.in | Service | Jammu, JK | see document | see document | Extension of NIT | ||
1. Renovation/up gradation of approach road to power house of CHEP-III including black topping and construction of drain/R wall (with paver) (4th call) 2. Renovation of inspection road along spill channel of CHEP-III (with paver and manually) (4th call) 3. Restoration/blacktopping of road in Chenani Hydel Project colony Udhampur (with paver) (4th call) |
E-NIT No: 19 of 2019-20 | 23.11.2019 |
2019_SPDC_86789_1 2019_SPDC_86789_2 2019_SPDC_86789_3 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Notice | |
1. Repair and painting of complete power house building complex panel hall, control room and security room including repairs false ceiling (Power house CHEP-I) Ist time 2. Construction of spur including revetment on left bank of River Tawi near RD 8600’ CHEP-Ist (5th time) 3. Restoration of service road by way of removal of slips/boulders at various RD’s and surface RD 1200-11000 of W/c RD 25000-75000 of S/R including protection at spots by way of walling (3rd time) 4. Surface dressing / filling of ruts of service road from RD 0’ to 11000’ of water conductor and RD 39500’ to RD 75000’ of S/R at places including providing, laying metal on RD 11000’ to 71000’ (Unmetalled portion) CHEP-I Udhampur (4th time) |
E-NIT No: 18 of 2019-20 | 23.11.2019 |
2019_SPDC_86676_1 2019_SPDC_86676_2 2019_SPDC_86676_3 2019_SPDC_86680_1 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Notice | |
1. Stabilization of sliding area downhill side of W/C by providing check wall between RD 59000 -60000 of W/C of CHEP-I 2. Restoration/construction of R wall opp. Peer baba of CHEP-I 3. Silt clearance from water conductor, Forebay and spill channel (shutdown work) |
E-NIT No: 17 of 2019-20 | 23.11.2019 |
2019_SPDC_86565_1 2019_SPDC_86565_2 2019_SPDC_86565_3 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Notice | |
1. Protection of W/C by providing B.A wire crates at RD 56500' on downhill side of W/C at CHEP-I 2. Provision for gang coolie/helper/canal patroller through contractor, repair and black topping / tiling of approach road to CHEP-II and repair to water supply and bathroom 3. Removal of slips/checking of slips by laying of crates and masonry wall along the right bank of water conductor from RD 1560M to 5018 M of CHEP-III in between RD 2200-2600 and 3500-4000 (vulnerable portion) |
E-NIT No: 16 of 2019-20 | 23.11.2019 |
1. 2019_SPDC_86561_1 2. 2019_SPDC_86561_2 3. 2019_SPDC_86561_3 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Notice | |
Plugging of leakages in RCC Pressure Duct CHEP-III by way of pressure grouting /micro concreting so as to plug the remaining leakages as well as strengthening of pressure Duct including laying of wet mixed macadam from B/R to surge shaft and chain link fencing for safeguarding PDC land (Shut down work). | E-NIT No: 15 of 2019-20 | 23.11.2019 | 2019_SPDC_86560_1 | XEN CCD UDHM | Civil | Udhampur, JK | 33.00 Lacs | 30 days | Notice | |
Cancellation of eNIT 04 | MID/PDC/556-65 | 26.11.2019 | MID Kashmir | Civil | Bermina, Srinagar JK | Cancellation Notice | ||||
1. Chain Link Fencing of Power House Land at Kallar Mohra, Teh.-Mendhar District- Poonch 2. Chain Link Fencing of Surge Shaft Land at Bhatadurian, Teh. -Mendhar District- Poonch |
E-NIT No.: 01-of 2019-20 | 29.11.2019 | see jktenders.gov.in | Parnai Hydel Project Draba Surankote | Civil | Mendhar District Poonch, JK | 64.34 Lacs | 4 months | NIT | |
1. Channelization of Seepage Water and Rimming of water pipes including Painting of Pipes in Power House BHEP-II 2. Treatment/Filling of Cavities in transformer Hall and rendering 3. Painting of Rock Bolts and Rib structures in Transformer Hall Machine Hall and allied work in Power House BHEP-II 4. Installation of three No Gates (one each at vehicle access door, bottom to pressure short and abandoned tunnel at MAT) Power House Stage-II |
Fresh e-NIT 03 of 2019-20 | 28.11.2019 | BHEP | Mechanical | Chanderkote, JK | One day | NIT | |||
Cancellation of EE/CID/PDC/SPR/ 04 of 2019 | EE/CID/PDC/SPR/643-51 | 28.10.2019 | XEN CID Sopore | Civil | Sopore, JK | Cancellation Notice | ||||
Renovations and Modernisation of 9 MW (3X3 MW) SEWA Hydel Project Stage - III inclusive of Design, Engineering, Reverse Engineering, supply, erection, Testing and Commissioning of various equipments and material, including civil works and other allied works at Hutt Mashka, Teh. Basholi, Distt. Kathua, Jammu and Kashmir, India. | e-NIT 02 OF 2019-20 | 23.11.2019 | Sewa HEP – III | Civil | Hut Mashka, Basohli, JK | Rs. 1447.335 lacs | 18 Months | NIT | ||
Notice inviting offer for several Electromechanical components like invertor, turbine rubber, etc | GTD/PDC/Tech/629-31 | 18.11.2019 | Pahalgam | Electro-Mechanical(Supply) | Pahalgam, JK | NIO | ||||
Notice inviting offer for several Electromechanical components like Generator Coupling, etc | GTD/PDC/Tech/626-28 | 18.11.2019 | Pahalgam | Electro-Mechanical(Supply) | Pahalgam, JK | NIO | ||||
Notice inviting offer for several Electromechanical components like Master Trip relay, rectifiers, MCCBs, etc | GTD/PDC/Tech/623-25 | 18.11.2019 | Pahalgam | Electro-Mechanical(Supply) | Pahalgam, JK | NIO | ||||
Fabrication of entrance gate of Margund store and Bemina store of MID PDC | MID/PDC/522-29 | 18.11.2019 | MID Kashmir | Civil | Bermina, Srinagar JK | 0.86 lac | 21 days | NIT | ||
Cancellation of e-NIT 01 of 2019 dated 23.10.2019 | CE/Gen/J/1613-18 | 16.11.2019 | Sewa HEP – III | Civil | Hut Mashka, Basohli, JK | Rs. 1583.83 lacs | 18 Months | Cancellation Notice | ||
Construction of Green Building for Corporate Office, Jammu and Rail head, Jammu | ESSDJ/542-61 | 09.11.2019 | Estates | Civil | Jammu, JK | NIT | ||||
Construction of Green Building for Corporate Office, Jammu and Rail head, Jammu | ESSDJ/542-61 | 09.11.2019 | Estates | Civil | Jammu, JK | NIT | ||||
Cancellation e-NIT No 2 of 2019-20 | ESSDJ/553-59 | 08.11.2019 | 2019_SPDC_76882_1 | Estates | Civil | Jammu, JK | Cancellation Notice | |||
Notice regarding change of venue of Pre Bid meeting for e-NIT 01 OF 2019-20 | e-NIT 01 OF 2019-20 | 23.10.2019 | Sewa HEP – III | Civil | Hut Mashka, Basohli, JK | Rs. 1583.83 lacs | 18 Months | Notice | ||
1. Construction of approach Road to Guest House Gawari Bhaderwah by way of earthwork, walling, side drain and mettaling 2. Plugging of leakages in Water Conductor of Power House Bhaderwah by way of lining 3. Removal of silt/mulba from Forebay of HEP Bhaderwah and its repair works Sartingal. 4. Providing under pinning/RCC apron/filling raising of divide wall at Head Works Power House Bhaderwah. 5. Restoration of damaged Tailrace Channel Of HEP Bhaderwah. 6. Repairs/construction of damaged outfall channel of Bhaderwah HEP below Chamba Road for protection of private land 7. Construction of RCC WC in between RD 600 to 650 Mtrs and RD 1100 to RD 1150 Mtrs of Power House Bhaderwah replacing the old one. 8. Providing jacketing by construction of RCC WC in between RD 800 to 1000Mtrs of Power House Bhaderwah. |
eNIT 02 of 2019 | 04.11.2019 | Bhaderwah | Civil | Bhaderwah | NIT | ||||
Extension of Last date of submission of bids for Debt Funding of 12 MW Karnah | JKSPDC/F/7720-28 | 05.11.2019 | Corporate Office | Finance | Extension Notice | |||||
Providing, laying, fitting, testing and commissioning of 3.5 core 185 sq.mm cable from Dam Control Room to operating panel at EL.736 m along with allied components for existing control panel of dewatering pump no. 3 installed at Dam gallery of BHEP | E-NIT No. MECH/BHEP/07 of 2019 | 23.10.2019 | 2019_spdc_84763_1 | BHEP | Mechanical | Chanderkote, JK | Rs. 648270 | 45 days | NIT | |
Overhauling of 02 no’s 130 HP submersible dewatering pump installed in dam galleries of BHEP as detailed in SBD scope of work | E-NIT No. MECH/BHEP/08 of 2019 | 23.10.2019 | 2019_spdc_84765_1 | BHEP | Mechanical | Chanderkote, JK | Rs. 18.06 Lac | 90 days | NIT | |
Repair/Renovation of existing delivery pipeline of dewatering system including painting, replacement of cast iron NRV’s /Gate valves etc at Dam Galleries. | E-NIT No. MECH/BHEP/06 of 2019 | 23.10.2019 | 2019_spdc_84757_1 | BHEP | Electro-Mechanical | Chanderkote, JK | Rs. 6.80 lacs | 90 days | NIT | |
Procurement of Bore well robotic under water video inspection camera with 150m cable and camera head submersible up to 35 bar. | E-NIT No. MECH/BHEP/05 of 2019 | 23.10.2019 | 2019_spdc_84740_1 | BHEP | Electro-Mechanical | Chanderkote, JK | Rs. 808064 | 45 days | NIT | |
EPC for three PMDP projects Ans-II, Tamasha and Phagla | see documents | 24.10.2019 | Corporate Office | Services | JK | see document | see document | NITs | ||
Epoxy painting and drainage work. | E-NIT No: 02 of 2019 | 16.10.2019 | BHEP | Services | Chanderkote, JK | see document | see document | NIT | ||
Construction of ITI building (Two Floors) Phase I at Dharmari, District Reasi. | 03 of 2019 | 23.10.2019 | 2019_SPDC_84419 | CID | Civil | Dharmari | Rs 97.45 Lacs | 365 Days | NIT | |
Renovations and Modernisation of 9 MW (3X3 MW) SEWA Hydel Project Stage - III inclusive of Design, Engineering, Reverse Engineering, supply, erection, Testing and Commissioning of various equipments and material, including civil works and other allied works at Hutt Mashka, Teh. Basholi, Distt. Kathua, Jammu and Kashmir, India. | e-NIT 01 OF 2019-20 | 23.10.2019 | Sewa HEP – III | Civil | Hut Mashka, Basohli, JK | Rs. 1583.83 lacs | 18 Months | NIT | ||
Several Civil Works | ENIT 14 of 2019-20 | 22.10.2019 | XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Notice | ||
Several Civil Works | ENIT 13 of 2019-20 | 20.10.2019 | XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Notice | ||
1. Protection of W/C by providing B.A wire crates at RD 56500' on downhill side of W/C at CHEP-I 2. Provision for gang coolie/helper/canal patroller through contractor, repair and black topping / tiling of approach road to CHEP-II and repair to water supply and bathroom 3. Removal of slips/checking of slips by laying of crates and masonry wall along the right bank of water conductor from RD 1560M to 5018 M of CHEP-III in between RD 2200-2600 and 3500-4000 (vulnerable portion) | ENIT 12 of 2019-20 | 15.10.2019 |
1. 2019_SPDC_83828_4 2. 2019_SPDC_83828_2 3. 2019_SPDC_83828_3 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Notice | |
1. Stabilization of sliding area downhill side of W/C by providing check wall between RD 59000 -60000 of W/C of CHEP-I 2. Restoration/construction of R wall opp. Peer baba of CHEP-I 3. Silt clearance from water conductor, Forebay and spill channel (shutdown work) |
ENIT 11 of 2019-20 | 15.10.2019 |
1. 2019_SPDC_83809_1 2. 2019_SPDC_83809_2 3. 2019_SPDC_83809_3 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Notice | |
Several Works of WC by way of RCC | ENIT 10 of 2019-20 | 14.10.2019 | See document | XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Notice | |
Repair/Renovation of Divisional Office Building JKSPDC Sopore | EE/CID/PDC/SPR/ 03 | 21.10.2019 | see jktenders.gov.in | XEN CID Sopore | Civil | Sopore, JK | 10 lacs | 90 days | NIT | |
Cancellation of NIT 01 dated 18.10.2019 | CID/DJ/PDC/829-35 | 20.10.2019 | CID | Civil | Cancellation Notice | |||||
Cancellation of Bids for EPC Execution of 23 MW Ans-II, 14.1 MW Phagla and 12 MW Tamasha HEPs | JKSPDC/PMDP/P-280/15785-91 | 19.10.2019 | see jktenders.gov.in | Corporate Office | Srinagar, JK | Cancellation | ||||
SUPPLY OF SURVEY EQUIPMENT | NO. 01 | 18.10.2019 | CID | Civil | AT VARIOUS GD SITES LOCATED IN HQ JAMMU, RAJOURI, SURANKOTE and MATLOTE SUB-DIVISIONS | Notice | ||||
Epoxy painting and drainage work. | E-NIT No: 02 of 2019 | 16.10.2019 | BHEP | Services | Chanderkote, JK | see document | see document | NIT | ||
Several Civil works | E-NIT No: 01 of 2019 | 16.10.2019 | BHEP | Services | Chanderkote, JK | see document | see document | NIT | ||
1. Supply of Skilled Labour and Unskilled Labour for Observation of Gauge and Discharge Data for GD Sites under the jurisdiction of HQ Jammu Sub Division of CID Division Jammu. 2. Supply of Skilled Labour and Unskilled Labour for Observation of Gauge and Discharge Data for GD Sites under the jurisdiction of Rajouri Sub Division of CID Division Jammu. 3. Supply of Skilled Labour and Unskilled Labour for Observation of Guage and Discharge Data for GD Sites under the jurisdiction of Surankote Sub Division of CID Division Jammu. 4. Supply of Skilled Labour and Unskilled Labour for Observation of Guage and Discharge Data for GD Sites under the jurisdiction of Matlote Sub Division of CID Division Jammu. |
02 of 15-10-2019 | 15.10.2019 | 1. 2019_SPDC_83725 2. 2019_SPDC_83737 3. 2019_SPDC_83739 4. 2019_SPDC_83741 |
CID | Civil | See document | See document | see document | Notice | |
Supply of materials: 1. Bed Back Panel made of Ply Board and Sunmica with modular Panel light and cusion rest in best quality cloth incl. both side table (size 1’-6” x 1’-6” x 3’-6”) 2. Vanity complete made of waterproof Ply Board and Sunmica with granite Top excl. Accessories |
ESSDJ/496-99 | 15.10.2019 | Estates | Civil | Jammu, JK | Notice | ||||
Extension of NIT No. MID/PDC/02 dated 19.09.2019 | MID/PDC/400-410 | 10.10.2019 | MID Kashmir | Civil | Kangan, JK | Corrigendum Notice | ||||
Corrigendum to EPC Phagla | JKSPDC/PMDP/P-280/15236-40 | 10.10.2019 | see jktenders.gov.in | Corporate Office | Srinagar, JK | Corrigendum Notice | ||||
Supply of several construction material |
ESSDJ/481-84 | 05.10.2019 | Estates | Civil | Jammu, JK | Notice | ||||
Extension of bid opening for Ans-II, Phagla and Tamasha | JKSPDC/PMDP-2015/P-280/15093-97 | 04.10.2019 | see jktenders.gov.in | Corporate Office | Srinagar, JK | Extension of NIT | ||||
Cancellation of eNIT 05 | CMD/eNIT/2016-19 | 29.09.2019 | See document | XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Cancellation Notice | |
Further Extension of bid opening for Ans-II, Phagla and Tamasha | JKSPDC/PMDP-2015/P-280/14850-57 | 26.09.2019 | see jktenders.gov.in | Corporate Office | Srinagar, JK | Extension of NIT | ||||
1. Repair/ Renovation of AB Block quarters of Chenani HEP Colony Udhampur 2. Repair of road, power house building and other associated works as per DPR 3. Fencing of water conductor at Suwna near high school including construction of Pedestal Bridge over Water Conductor. |
E-NIT No: 09 of 2019-20 | 17.09.2019 |
1. 2019_SPDC_81918_1 2. 2019_SPDC_81918_2 3. 2019_SPDC_81918_3 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | NIT | |
1. Restoration/construction of washed away portion of road including stabilization of Slope for protection of covered portion of aqueduct and road CHEP -III (by way of Crate revetment in River Tawi) 2. Construction of spur including revetment on left bank of River Tawi near RD 8600’ CHEP-Ist 3. Restoration of service road by way of removal of slips/boulders at various RD’s and surface RD 1200-11000 of W/c RD 25000-75000 of S/R including protection at spots by way of walling 4. Surface dressing / filling of ruts of service road from RD 0’ to 11000’ of water conductor and RD 39500’ to RD 75000’ of S/R at places including providing, laying metal on RD 11000’ to 71000’ (Unmetalled portion) CHEP-I Udhampur |
E-NIT No: 08 of 2019-20 | 17.09.2019 |
1. 2019_SPDC_81882_1 2. 2019_SPDC_81882_2 3. 2019_SPDC_81882_3 4. 2019_SPDC_81896_1 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | NIT | |
Fabrication of entrance gate of Margund store and Bemina Store of MID PDC | MID/PDC/367-78 | 19.09.2019 | MID Kashmir | Civil | Kangan, JK | Notice | ||||
Supply of Civil work material i.e. 1. Tile 600 x 300 mm (Kajaria, Raks, Somany) 2. Wooden Paneling 3. Wooden Flooring 4. Reducer Profile 5. Thremacol Foam |
ESSDJ/457-460 | 21.09.2019 | Estates | Civil | Jammu, JK | Notice | ||||
Renovation/ modernization (of Hydro- Mechanical Works) of various gates i.e., head regulatory gate and head regulatory stop-log gate at headwork, de-silting gates and 1200 mm dia. sluice valves of de-silting chamber, pen stock gates at forebay, draft tube gate and tail race gate with their allied works at Sewa-III HEP, Mashka, Basholi, District Kathua, JK | e-NIT 07 OF 2019-20 | 12.09.2019 | Sewa HEP – III | Civil | Hut Mashka, Basohli, JK | Rs.22 lacs | 45 working Days | NIT | ||
Chartered Accountant for the Assignment of TAX AUDIT of JKSPDC | eTender No. 04 | 12.09.2019 | see jktenders.gov.in | Corporate Office | Consultancy | Srinagar, JK | NIT | |||
Cancellation of Tender for Internal Audit | PDC/Fin/7326 | 12.09.2019 | see jktenders.gov.in | Corporate Office | Consultancy | Srinagar, JK | Cancellation Notice | |||
Extension of bid opening for Ans-II, Phagla and Tamasha | JKSPDC/Camp-Leh/1-7 | 07.09.2019 | see jktenders.gov.in | Corporate Office | Srinagar, JK | Extension of NIT | ||||
Different works of CHEP-I, II and III | GEN/PDC/U/913-18 and GEN/PDC/U/919-24 | 03.09.2019 | 2019_SPDC_81091_1 2019_SPDC_81097_1 2019_SPDC_81098_1 2019_SPDC_81100_1 2019_SPDC_81101_1 2019_SPDC_81103_1 2019_SPDC_81106_1 2019_SPDC_81145_1 2019_SPDC_81128_1 2019_SPDC_81131_1 |
Gen Division Udhampur | Several Works | Udhampur and Bhaderwah , JK | NIT | |||
Construction of ITI building (Two Floors) Phase I at Dharmari, District Reasi. | 28.08.2019 | CID | Civil | Dharmari, Reasi, JK | Rs 97.45 Lacs | 365 Days | Notice | |||
Internal Audit of JKSPDC for 3 years 2017-18,2018-19,2019-20 | eTender Notice 02 of 2019 | 02.09.2019 | see jktenders.gov.in | Corporate Office | Consultancy | Srinagar, JK | NIT | |||
Corrigendum - to ENIT 05 | CMD/NIT/823-829 | 31.08.2019 | XEN CCD UDHM | Civil | Udhampur, JK | Corrigendum | ||||
Supply of Plumbing work material i.e. 1. Jaquar Curve Neo Shower Panel White Matt 1500 x 230mm (Cat No. – JPL-WHT-TMCURVENEO) 2. Single Lever Basin Mixer without Popup Waste System with 450mm Long Braided Hoses (Cat. No. – CNF-CHR-69011B) 3. Angular Stop Cock with Wall Flange (Cat. No. SIG-CHR-41053) 4. Toilet Roll Holder with Flap (Cat. No. QUA-CHR-61753) 5. Corner Glass Self (With Bracket) (Cat. No. CAN-CHR-1173) 6. Hand Shower (Health Faucet) with 8mm Dia 1.2 meter Long Flexible Tube and Wall Hook (ALD-CHR-573) 7. Towel Rack 600mm Long with Lower Hangers, Stainless Steel (AKP-CHR-35781PS) 8. Versa Horizontal 40L- Manual 2KW Dimension 400 x 700 (VRM-WHT-H040) |
ESSDJ/437-440 | 30.08.2019 | Estates | Civil | Jammu, JK | Notice | ||||
Different works of CHEP-I, III and Bhaderwah HEP | GEN/PDC/U/862-67 | 21.08.2019 | 2019_SPDC_80648_1 2019_SPDC_80664_1 2019_SPDC_80659_1 2019_SPDC_80653_1 |
Gen Division Udhampur | Several Works | Udhampur and Bhaderwah , JK | NIT | |||
Corrigendum - to ENIT 05 | CMD/NIT/677-82 | 19.08.2019 | XEN CCD UDHM | Civil | Udhampur, JK | Corrigendum | ||||
Different works of CHEP-I | E-NIT No: 05 of 2019-20 | 29.07.2019 | see document | Gen Division Udhampur | Several Works | Udhampur, JK | NIT | |||
Notice inviting E-Tenders (E-NIT) for Consultancy services for the assignment of Re-organisation of JK Power Development Department (JKPDD) and JK State Power Development Corporation Limited(JKSPDCL) in compliance to the Jammu and Kashmir Reorganisation ACT,2019 | E-NIT no. 01 - 23.08.2019 | 23.08.2019 | Corporate Office | Consultancy | Srinagar, JK | NIT | ||||
Notice inviting quotation for printing and compilation of DPR - Ujh MHEP | Quotation No 01 of 2019 | 19.08.2019 | Ujh MHEP | Supplies and printing | Kathua | Notice | ||||
Corrigendum to NIT 06 of 2019 | see document | see document | Sewa HEP – III | Civil | Hut Mashka, Basohli, JK | Corrigendum | ||||
Corrigendum to NIT 03 of 2019 | see document | see document | Sewa HEP – III | Civil | Hut Mashka, Basohli, JK | Corrigendum | ||||
Corrigendum to NIT 02 of 2019 | see document | see document | Sewa HEP – III | Civil | Hut Mashka, Basohli, JK | Corrigendum | ||||
Corrigendum to NIT 01 of 2019 | see document | see document | Sewa HEP – III | Civil | Hut Mashka, Basohli, JK | Corrigendum | ||||
Corrigendum - to ENIT 05 | CMD/NIT/677-82 | 19.08.2019 | XEN CCD UDHM | Civil | Udhampur, JK | Corrigendum | ||||
Different works of CHEP-II and III | GEN/PDC/U/758-63 | 03.08.2019 | 2019_SPDC_80191_1 2019_SPDC_80193_1 2019_SPDC_80195_1 2019_SPDC_80199_1 2019_SPDC_80203_1 |
Gen Division Udhampur | Several Works | Udhampur, JK | NIT | |||
Different works of CHEP-I, II, III | GEN/PDC/U/741-46 | 02.08.2019 | 2019_SPDC_80081_1 2019_SPDC_80087_1 2019_SPDC_80091_1 2019_SPDC_80092_1 2019_SPDC_80095_1 2019_SPDC_80097_1 2019_SPDC_80098_1 |
Gen Division Udhampur | Several Works | Udhampur, JK | NIT | |||
Providing and fitting electrical items urgently required for wangath headworks, BR burnbugh and RD 3700 | USHP II/GD/Tech/462-63 | 27.07.2019 | USHP-II | Electrical | Kangan, JK | NIT | ||||
Providing and fitting electrical items urgently required for Sumbal Head works | USHP II/GD/Tech/464-65 | 27.07.2019 | USHP-II | Electrical | Kangan, JK | NIT | ||||
Automation of dewatering panels and direct online starter panel of leakage motors | USHP II/GD/Tech/466-67 | 27.07.2019 | USHP-II | Electrical | Kangan, JK | NIT | ||||
SITC of 4.3 KVA, 380 volt 750 LPM oil circulation motors | USHP II/GD/Tech/478-69 | 27.07.2019 | USHP-II | Electrical | Kangan, JK | NIT | ||||
Corrigendum - Restoration of Unit-I of USHP-I Sumbal HEP by way of repair / re-insulation of damaged stator winding bars | SEG/II/PDC/Tech/03 of 2019-20 | 31.07.2019 | USHP-I | Civil | Sumbhal, JK | 35.00 Lacs | 25 days | Corrigendum | ||
Restoration of Unit-I of USHP-I Sumbal HEP by way of repair / re-insulation of damaged stator winding bars | SEG/II/PDC/Tech/03 of 2019-20 | 30.07.2019 | USHP-I | Civil | Sumbhal, JK | 35.00 Lacs | 25 days | NIT | ||
Coorigendum - Surface dressing / filling of ruts of service road from RD 0’ to 11000’ of water conductor and RD 39500’ to RD 75000’ of S/R at places including providing, laying metal on RD 11000’ to 71000’ (Unmetalled portion) CHEP-I Udhampur | CMD/NIT/555-61 | 29.07.2019 | 2019_SPDC_79277_1 | XEN CCD UDHM | Civil | Udhampur, JK | 12.00 lacs | 60 days | Corrigendum | |
eNIT 07 - Collection of Dislodged Material/Wooden Flume of Mohura Power Canal. | GD/LJHP/1032-37 | 29.07.2019 | 2019_SPDC_79786_1 | Mohura Power House | Electromechanical | Mohra, JK | 1.00 Lacs | 30 days | NIT | |
eNIT 06 - Printing of Log Sheets, Gate Passes, Visitors Book, Requisition Form etc for LJHP | GD/LJHP/1012-31 | 29.07.2019 | 2019_SPDC_79780_1 | LJHP | Electromechanical | Gantamulla, JK | 2.00 Lacs | 30 days | NIT | |
eNIT 05 - Procurement of Safety equipments and materials for operational staff of 3x35 MW LJHP | GD/LJHP/992-1011 | 29.07.2019 | 2019_SPDC_79779_1 | LJHP | Electromechanical | Gantamulla, JK | 7.00 Lacs | 30 days | NIT | |
eNIT 04 - Supply of Essential Spares for 3x35MW LJHP | GD/LJHP/972-91 | 29.07.2019 | 2019_SPDC_79778_1 | LJHP | Electromechanical | Gantamulla, JK | 20.00 Lacs | 30 days | NIT | |
Replacement of Drainage/ Dewatering pumps at Sewa-III HEP, Hutt Mashka, Basohli, Distt. Kathua | NIT 06 OF 2019-20 | 26.07.2019 | Sewa HEP – III | Civil | Srinagar/Jammu | 5 lacs | 15 working days | Notice | ||
Repair of switchyard fencing and gates at Sewa-III HEP, Hutt Mashka, Basohli, Distt. Kathua | NIT 05 OF 2019-20 | 26.07.2019 | Sewa HEP – III | Civil | Srinagar/Jammu | 2 lacs | 15 working days | Notice | ||
Maintenance of drainage system of Power House and Switchyard at Sewa-III HEP, Hutt Mashka, Basohli, Distt. Kathua. | NIT 04 OF 2019-20 | 26.07.2019 | Sewa HEP – III | Civil | Srinagar/Jammu | 1.5 lacs | 15 working days | Notice | ||
Branch cutting of Power House and Switchyard at Sewa-III HEP, Hutt Mashka, Basohli, Distt. Kathua | NIT 03 OF 2019-20 | 26.07.2019 | Sewa HEP – III | Civil | Srinagar/Jammu | 2 lacs | 15 working days | Notice | ||
Maintenance of steel stair outside the Power house at Sewa-III HEP, Hutt Mashka, Basohli, Distt. Kathua. | NIT 02 OF 2019-20 | 26.07.2019 | Sewa HEP – III | Civil | Srinagar/Jammu | 1 lacs | 15 working days | Notice | ||
Fabrication/ Manufacturing and erection of steel stair for EOT crane at Sewa-III HEP, Hutt Mashka, Basohli, Distt. Kathua | NIT 01 OF 2019-20 | 26.07.2019 | Sewa HEP – III | Civil | Srinagar/Jammu | 2 lacs | 15 working days | Notice | ||
Fabrication/ Manufacturing and erection of steel stair for EOT crane at Sewa-III HEP, Hutt Mashka, Basohli, Distt. Kathua | NIT 01 OF 2019-20 | 26.07.2019 | Sewa HEP – III | Civil | Srinagar/Jammu | Notice | ||||
Corrigendum to EPC for PMDP - Ans, Phagla and Tamasha | JKSPDC/PMDP/P-280/11523-11527 | 25.07.2019 | EPC Execution | Civil | Srinagar/Jammu | Corrigendum Notice | ||||
Supply, Installation, Testing and Commissioning of 132KV Current transformers and 11KV CT-PT units along with Cabling etc at USHP-Ist, Sumbal, Kangan | GDS/01 | 24.07.2019 | USHP-I | Electrical | Karnah, JK | see document | 30 days | NIT | ||
Extension Notice No. 01 of Supply, Installation, Testing and Commissioning of 03 No. oil pump assemblies for disc valve section of all the three units of 3x35MW LJHP power house along with replacement of all the flange type valves of disc valves of disc valve section of different sizes (1inch, 2inch, 0.5inch) for LJHP. | GD/LJHP/937-41 | 23.07.2019 | 2019_SPDC_77878_1 | LJHP | Electrical | Gantamulla, JK | Extension Corrigendum | |||
Supply of 03 No. 14MVA, 11/132KV Single Phase Power Transformers for 3X35 MW LJHP | GD/LJHP/932-36 | 23.07.2019 | 2019_SPDC_77865_1 | LJHP | Electrical | Gantamulla, JK | Extension Corrigendum | |||
Surface dressing / filling of ruts of service road from RD 0’ to 11000’ of water conductor and RD 39500’ to RD 75000’ of S/R at places including providing, laying metal on RD 11000’ to 71000’ (Unmetalled portion) CHEP-I Udhampur | E-NIT No: 04 of 2019-20 | 22.07.2019 | 2019_SPDC_79277_1 | XEN CCD UDHM | Civil | Udhampur, JK | 12.00 lacs | 60 days | NIT | |
a. Design , Reverse Engineering ,Manufacture Supply ,installation, testing and commissioning of 1.5MW Francis Horizontal Synchronous generator ,Exciter, Exciter panel along with other accessories for unit II at MHEP Pahalgam (complete job) b. Procurement of instrument/control cables of sizes for complete reinstallation of unit II at MHEP Pahalgam. |
GTD/ 03 of 2019-20 | 15.07.2019 | 2019_SPDC_ 78836_1 | Pahalgam | Electro-Mechanical(Supply) | Pahalgam, JK | 1.06 lacs | 300 days | NIT | |
Extension of Timelines for EPC Contract of Execution of 23 MW Ans-II, 14.1 MW Phagla and 12 MW Tamasha HEPs | 19.07.2019 | EPC Execution | Civil | Srinagar/Jammu | Extension Notice - Tamasha Extension Notice - Ans Extension Notice - Phagla |
|||||
1. Restoration/construction of washed away portion of road including stabilization of Slope for protection of covered portion of aqueduct and road CHEP -III (by way of Crate revetment in River Tawi) 2. Construction of spur including revetment on left bank of River Tawi near RD 8600’ CHEP-Ist |
eNIT 02 of 2019 | 17.07.2019 |
1. 2019_SPDC_78912_1 2. 2019_SPDC_78912_2 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | NIT | |
1. Demolition and reconstruction of 2 Nos staircase hall of A block at CHEP colony Udhampur which stands declared unsafe (1 stair hall in phase – 1) 2. Repair/ Renovation of AB Block quarters of Chenani HEP Colony Udhampur |
eNIT 03 of 2019 | 18.07.2019 |
1. 2019_SPDC_78976_1 2. 2019_SPDC_78976_2 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | NIT | |
Budgetary Offer | GDS/ 377-78 | 20.07.2019 | USHP-I | Electrical | Karnah, JK | see document | 20 days | NIT | ||
SITC of 220 V battery bank of USHP-11 Kangan | USHP II/GD/Tech/423 | 20.07.2019 | USHP-II | Electric | Kangan, JK | NIT | ||||
SITC of 220V, 1000 AH charger of USHP-11 Kangan | USHP II/GD/Tech/423 | 20.07.2019 | USHP-II | Electric | Kangan, JK | NIT | ||||
SITC of 220V, 1000 AH charger of USHP-11 Kangan | USHP II/GD/Tech/423 | 15.07.2019 | USHP-II | Electric | Kangan, JK | NIT | ||||
Repair/Renovation of Divisional Office Building JKSPDC Sopore | 01 of 2019 | 19.07.2019 | 2019_SPDC_79041_1 | XEN CID Sopore | Civil | Sopore, JK | 10 lacs | 120 days | NIT | |
Cancellation E-NIT No: 01 of 2019-20 | CMD/e-NIT/423-28 | 17.07.2019 |
1. 2019_SPDC_78758_1 2. 2019_SPDC_78758_2 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Cancellation of NIT | |
Fabrication of Mild Steel Platform for 60 HP dewatering Pump and spare dewatering Pump. Replacement of damaged oil pipe lines of Governor OPU of Unit-II |
GD/LJHP/881-84 | 17.07.2019 | LJHP | Electromechanical | Gantamulla, JK | Notice | ||||
Corrigendum in BOQ format for Ans, Phagla and Tamasha HEP | JKSPDC/PMDP/P-280/11268-72 | 18.07.2019 | RFP for EPC Execution | Civil | Srinagar/Jammu | Corrigendum | ||||
1. Restoration/construction of washed away portion of road including stabilization of Slope for protection of covered portion of aqueduct and road CHEP -III (by way of Crate revetment in River Tawi) 2. Construction of spur including revetment on left bank of River Tawi near RD 8600’ CHEP-Ist |
E-NIT No: 01 of 2019-20 | 15.07.2019 |
1. 2019_SPDC_78758_1 2. 2019_SPDC_78758_2 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | NIT | |
Hiring of Residential building/Guest House/Superior Rooms of Hotel for utilization as Guest House | NIT NO: 02 0f 2019-20 | 16.07.2019 | Estates Sub division | Srinagar, JK | Notice | |||||
Corrigendum - Supply, Installation, Testing and Commissioning of 03 No. oil pump assemblies for disc valve section of all the three units of 3x35MW LJHP power house along with replacement of all the flange type valves of disc valves of disc valve section of different sizes (1inch, 2inch, 0.5inch) for LJHP. | Corrigendum of e-NIT No. 01 of 2019-20 | 2019_SPDC_77865_1 | LJHP | Electrical | Gantamulla, JK | Corrigendum Notice | ||||
Procurement of supplies of perishable items on emergent basis | USHP II/GD/03 of 2019 | 03.07.2019 | USHP-II | Electric | Kangan, JK | NIT | ||||
Repair and Maintenance of Power House BHEP-II and Allied works-Supply of Man Power | PHD/BHEP/154-56 | 06.07.2019 | BHEP | Services | Chanderkote, JK | Extension NIT | ||||
Implementation of INDAS at JKSPDC | e-NIT No 3 of 2019 | 10.07.2019 | Service | Accounting | Srinagar/Jammu | GIST | ||||
Supply of Civil work material i.e.
1. Steel of all sorts (TMT Steel) 2. Shuttering |
ESSDJ/305-307 | 09.07.2019 | Estates | Civil | Jammu, JK | Notice | ||||
Supply of Civil work material i.e. 1. Kota Stone with 20mm to 25mm thickness | ESSDJ/302-304 | 09.07.2019 | Estates | Civil | Jammu, JK | Notice | ||||
Supply of Civil work material i.e. 1. Cement 2. Brick 3. Sand (coarse) 4. Sand (fine) 5. Aggregate (20mm) 6. Aggregate (40mm) | ESSDJ/299-301 | 09.07.2019 | Estates | Civil | Jammu, JK | Notice | ||||
Complete Capital Overhauling of 35 MW Unit-III of USHP-11 Kangan | USHP II/GD/Tech/4 | 03.07.2019 | 2019_SPDC_78167_1 | USHP-II | Electro-mechanical | Kangan, JK | 289 lacs | 120 days | NIT | |
Engagement of cooks for JKSPDC Guest Houses | ESSDJ/271-276 | 03.07.2019 | Estates | Civil | Jammu, JK | Notice | ||||
Cancellation of several tenders - See document | GD/LJHP/658-62 | 24.06.2019 | 2019_SPDC_71379_1 2018_SPDC_52103_1 2019_SPDC_69385_1 2019_SPDC_69081_1 2019_SPDC_69082_1 2019_SPDC_69084_1 2019_SPDC_69085_1 2019_SPDC_69086_1 2019_SPDC_69386_1 2019_SPDC_69388_1 2019_SPDC_70332_1 2019_SPDC_69089_1 |
LJHP | Electromechanical | Gantamulla, JK | Cancellation notice | |||
1. Routine maintenance and Replacement of Damaged Oil and Water seals of Unit-I of MHP Karnah. 2. Routine maintenance and Replacement of Damaged Oil and Water seals of Unit-II of MHP Karnah. 3. Routine Repair and maintenance of Electrical Equipment’s at MHP Karnah. 4. Repair of Gantry and Replacement of damaged Cable Kits of Power Cables. 5. Routine maintenance of Power House Equipment’s and Turbine Assemblies of MHP Karnah. 6. Routine replacement and repair of MIV Seal of Unit-I of MHP Karnah. |
NIT No. 02 | 02.07.2019 | Karnah | Electro-Mechanical | Karnah, JK | see document | see document | NIT | ||
Annulment of Bid Process of EPC contract for the construction of 93 MW New Ganderbal HEP (NGHEP) | Order no: JKSPDC/47 of 2019 | 02.07.2019 | NGHEP | EPC NGHEP | Srinagar | Notice | ||||
Several supply and works at Karnah | ECDK/100-106 | 02.07.2019 | Karnah | Electro-Mechanical | Karnah, JK | see document | see document | NIT | ||
Extension of tender for All Risk Mega insurance BHEP | JKSPDC/FINANCE/10674-90 | 03.07.2019 | Srinagar | Insurance BHEP | Srinagar | Extension Notice | ||||
Invitation of offers for Fire Extinguisher Refilling | GDG/326-27 | 01.07.2019 | Ganderbal | Supply | Ganderbal, JK | NIO | ||||
Invitation of offers for Supply | GDG/330-31 | 01.07.2019 | Ganderbal | Supply | Ganderbal, JK | NIO | ||||
Supply, Installation, Testing and Commissioning of 03 No. oil pump assemblies for disc valve section of all the three units of 3x35MW LJHP power house along with replacement of all the flange type valves of disc valves of disc valve section of different sizes (1inch, 2inch, 0.5inch) for LJHP. | GD/LJHP/02 of 2019-20 | 29.06.2019 | 2019_SPDC_77878_1 | LJHP | Electromechanical | Gantamulla, JK | 20.747 Lacs | 60 days | Gist of NIT | |
Supply of 03 No. 14MVA, 11/132KV Single Phase Power Transformers for 3X35 MW LJHP | GD/LJHP/01 of 2019-20 | 29.06.2019 | 2019_SPDC_77865_1 | LJHP | Electrical | Gantamulla, JK | 392.31 Lacs | 120 days | Gist of NIT | |
Extension of NIT 01 | MID/PDC/194-204 | 26.06.2019 | MID Kashmir | Civil | Kangan, JK | Extension Notice | ||||
Corrigendum to NIT - Design , Reverse Engineering ,Manufacture Supply ,installation, testing and commissioning of 1.5MW Francis Horizontal Synchronous generator ,Exciter, Exciter panel along with other accessories for unit II at MHEP Pahalgam and including supply of control cables. | GTD/PDC/Tech/ 316-22 | 29.06.2019 | Pahalgam | Electro-Mechanical(Supply) | Pahalgam, JK | 10 Months | Corrigendum | |||
1.Speed Sensor.(Proximity sensor 12-24vDC with cable connector) 2. Magnetic Pickup probe. (Magnetic Speed Sensor 1A00-76/160 ) 3. Temperature sensor.(T State Grish 0-60°C,10 Amps ,240V AC) 4. Water cooler. As per site sample 5. Oil filters of HS pump. as per site sample |
GTD/PDC/Tech/ 316-19 of 2018-19 | 29.06.2019 | Pahalgam | Electro-Mechanical(Supply) | Pahalgam, JK | 10 days | NIT | |||
Submission of budgetary offers | GDG/328-29 | 01.07.2019 | Ganderbal | Electromechanical | Ganderbal, JK | NIO | ||||
Quotation for Furniture and other items - Special Subdivision Estates | ESSD/Sgr/107-11 | 26.06.2019 | Srinagar | Supplies | Srinagar | Quotation | ||||
Extension of Tender - Installation of CCTV Cameras inside and outside Power House at Ganderbal. | GDG/313-20 | 29.06.2019 | 2019_SPDC_76506_1 | Ganderbal | Electric | Ganderbal, JK | 2.15 Lac | 30 days | Extension NIT | |
Different works of CHEP-I, II, III and Bhaderwah HEP | GEN/PDC/U/515-19 | 26.06.2019 | Gen Division Udhampur | Several Works | Udhampur, JK | NIT | ||||
Repair and Maintenance of Power House BHEP-II and Allied works-Supply of Man Power | NIT 02 of 2019-20 | 21.06.2019 | BHEP | Civil | Chanderkote, JK | NIT | ||||
EPC execution of Phagla HEP - Gist of the NIT | JKSPDC/PMDP-2015/P-280/Phagla/EPC/ | 18.06.2019 | Poonch | Consultancy and EPC | JK | EPC Gist | ||||
EPC Ans-II - 23 MW HEP | JKSPDC/PMDP-2015/P-280/Ans-II/EPC/ | 18.06.2019 | Reasi | Consultancy and EPC | JK | EPC Gist | ||||
Cancellation of tender - Construction of Green Building at Jammu | ESSDJ/193-200 ESSDJ/116-19 |
15.06.2019 | Estates | Civil | Jammu, JK | Cancellation Notice | ||||
Design , Reverse Engineering ,Manufacture Supply ,installation, testing and commissioning of 1.5MW Francis Horizontal Synchronous generator ,Exciter, Exciter panel along with other accessories for unit II at MHEP Pahalgam and including supply of control cables. | GTD/PDC/Tech/ 197-203 | 14.06.2019 | 2019_SPDC_75296_1 | Electro-Mechanical | Pahalgam, JK | Extension Notice | ||||
General Overhauling of Unit 3rd(1.5 MW) MHEP Pahalgam as per the scope of work detailed in bid document | No: GTD/PDC/Tech/ 190-6 | 14.06.2019 | 2019_SPDC_74899_1 | Electro-Mechanical | Pahalgam, JK | Extension Notice | ||||
Fabrication of CGI Steel Shed | MID/PDC/141-47 | 11.06.2019 | MID Kashmir | Civil | Kangan, JK | NIT | ||||
Submission of Budgetary Offers | GDG/241-42 | 14.06.2019 | Ganderbal | Ganderbal, JK | NIO | |||||
Corrigendum to RfP for EPC Execution of 25 MW Matchil Kalaroos | JKSPDC/PMDP-2015/P-280/MKHEP/9725-32 | 13.06.2019 | Matchil/Kalroos | Consultancy | JK | Corrigendum | ||||
Installation of CCTV Cameras Inside and Outside Power House | GDG/01 of 2019-20 | 12.06.2019 | 2019_SPDC_76506_1 | Ganderbal | Electric | Ganderbal, JK | 2.15 Lac | 30 days | NIT | |
Vibration measurement and dynamic balancing of 35 MW unit II at USHP II Kangan | USHP II/GD/Tech/282-283 | 11.06.2019 | USHP-II | Electro-mechanical | Kangan, JK | NIT | ||||
Toping of 08 no Power transformers 132/11KV 32MVA and 03 no. auxiliary transformers along with supply of transformer Oil and its filtration thereof | GTD/PDC/Tech/165-68 | 01.06.2019 | Gas Turbine | Electro mechanical works | Pampore, Kashmir | 20 Days | NIT | |||
Extension of timelines for EPC contract Matchil | JKSPDC/PMDP-2015/P-280/MHEP/828-32 | 07.06.2019 | 2018_SPDC_61328_1 | Matchil | Consultancy | JK | Extension Corrigendum | |||
Cancellation Notice of e-NIT No. 16 of 2018-19 dated: 02.03.2019 | GD/LJHP/363-68 | 23.05.2019 | 2019_SPDC_72165_1 | LJHP | Electro-Mechanical | Gantamulla, JK | Cancellation Notice | |||
Face Uplifting of the Office of Generation Circle-II, JKSPDC Bemina | SEG/II/PDC/Tech/01 of 2018-19 | 30.05.2019 | Bemina | Civil | Srinagar, JK | 3.25 Lacs | 1 month | NIT | ||
Dismantling of Damaged submersible 12.5hp motor and refitting back after getting rewinded including replacement of damaged gaskets and nuts and bolts to provide drinking water facilities for the whole complex at Gas Turbine Division Phase-II Pampore | GTD/PDC/Tech/ 161-64 | 01.06.2019 | 2019_SPDC_75734_1 | Gas Turbine | Electro mechanical works | Pampore, Kashmir | 20 Days | NIT | ||
Providing of security manpower services of different categories for security of 900MW BHEP. | e-NIT No 02 of 2019-20 | 30.05.2019 | 2019_SPDC_75734_1 | BHEP | Civil works | Chanderkote, JK | Rs. 38.46 lac | 365 Days | NIT | |
Overhauling of 700 mt3/hr cooling motor pumps of unit II of USHP II Kangan | USHP II/GD/Tech/245 | 29.05.2019 | USHP-II | Electro-mechanical | Kangan, JK | NIO | ||||
Corrigendum to NITs 02, 14 and 15 of 2019 | GEN/PDC/U/323 and 324 | 29.05.2019 | Gen Division Udhampur | Several Works | Udhampur, JK | Corrigendum | ||||
1. Design, Reverse Engineering, Manufacture, Supply, Installation, Testing and Commissioning of 1.5MW Francis Horizontal Synchronous Generator, Exciter and Exciter Panel along with other accessories for nit II at MHEP Pahalgam complete job 2. Supply of cables |
GTD/02 of 2019 | 25.05.2019 | 2019_SPDC_75296_ 1 | Electrical | Pahalgam, JK | 1.06 lacs | 180 days | NIT | ||
Supply of spares | GTD/PDC/Tech/ 111-112 | 25.05.2019 | Electro mechanical | Pahalgam, JK | OM Works | |||||
a. Design ,manufacture, Assembly ,Supply, including installation ,testing and commissioning, trial run and adjustments as necessary for such an Outdoor oil immersed force cooled, 6MVA 3phase,50Hz, Manual cum Automatic Voltage Regulator/Transformer (11KV/11KV) with panels and provision for bypass panel for use on system Voltage of IIKV for synchronizing supply between generator and grid supply which varies from 5KV to 12 KV at 3x1.5 MW MHEP Pahalgam. b. Providing and installation of 15HP, 3-phase ,415V ,1470 rpm,150 m/ph capacity, 8”dia pipe,20m TDP, 11m head ,2 stage impeller, dewatering pump including suction/delivery pipes 60mtr and panel to be installed at the tail pool side of Powerhouse. c. Providing water level sensors in the forebay of canal to monitor the water level for safe and smooth operation of the machines. d. General overhauling of 75 KVA Dg set. |
GTD/PDC/Tech/109-110 | 25.05.2019 | Electro mechanical | Pahalgam, JK | Capital Works | |||||
Rewinding/replacement/repairing of shaft, impeller bearings of 3 no oil circulation motors | USHP II/GD/Tech/129-30 | 02.05.2019 | USHP-II | Electro-mechanical | Kangan, JK | NIO | ||||
Restoration of damage 11 KV line of Bhaderwah HEP | GEN/PDC/U/301-05 | 27.05.2019 | 2019_SPDC_75263_1 | Bhaderwah HEP | O and M Works | Udhampur, JK | NIT | |||
Different works of CHEP-I, II, III and Bhaderwah HEP | GEN/PDC/U/287-91 | 25.05.2019 | CHEP-I, II, III and Bhaderwah HEP | RMU Works | Udhampur, JK | NIT | ||||
Submission of Budgetary Offers | GDG/165-66 | 25.05.2019 | Ganderbal | Electric | Ganderbal, JK | NIO | ||||
Budgetary Offers for several works | GD/LJHP/339-40 | 23.05.2019 | LJHP | Electro-Mechanical | Gantamulla, JK | NIO | ||||
Corrigendum 2 to NIT for EPC Execution of 19 MW Durbok Shyok | JKSPDC/PMDP-2015/P-280/DS/349-53 | 17.05.2019 | see jktenders.gov.in | Durbok Shyok | Consultancy | JK | Corrigendum | |||
Cancellation of Tender No:- GTD/PDC/Tech/07 of 2018-19 Dated : 31-01-2019 | GTD/PDC/Tech/ 87-88 | 16.05.2019 | 2019_SPDC_74899_1 | Electro mechanical | Pahalgam, JK | Cancellation | ||||
Capital overhauling of unit III along with allied works and essential store supplies at USHP II Kangan | USHP II/GD/Tech/161 | 11.05.2019 | USHP-II | Electro-mechanical | Kangan, JK | NIO | ||||
Submission of Budgetary Offers | GDG/151-53 | 22.05.2019 | Ganderbal | Electric | Ganderbal, JK | NIO | ||||
General Overhauling of Unit 3rd (1.5 MW) MHEP Pahalgam as per the scope of work detailed in bid document. | GTD/PDC/Tech/ 93-103 | 20.05.2019 | 2019_SPDC_74899_1 | Electric | Pahalgam, JK | 39.987 lacs | 60 days | NIT | ||
Several NIQs | ESSDJ/113-15 ESSDJ/116-19 |
17.05.2019 | Estates | Civil | Jammu, JK | NIQ | ||||
Extension of EPC tender for 19 MW Durbok Shyok HEP | JKSPDC/PMDP-2015/P-280/DSHEP/226-31 | 14.05.2019 | see jktenders.gov.in | Durbok Shyok | Consultancy | JK | Extension | |||
Cancellation of EPC tender for 23 MW ANS-II, 12 MW Tamasha and 14.1 MW Phagla | JKSPDC/Tech/PMDP-2015/232-37 | 14.05.2019 | see jktenders.gov.in | PMDP Projects | Consultancy | JK | Cancellation | |||
1. Up-Keeping and Maintenance of Power House BHEP-II disposal of Garbage-Supply of Man Power 2. Repair, Maintenance of Power House BHEP-II and Allied works-Supply of Man Power |
NIT 01 of 2019-20 | 14.05.2019 | BHEP | Civil works | Chanderkote, JK | see document | see document | NIT | ||
Extension of Tender notice for Conducting of computer test for shortlisted candidates for the post of Junior Assistants | eTender No 2 of 19 | 06.05.2019 | see jktenders.gov.in | Service | Jammu, JK | see document | see document | Extension of NIT | ||
1. a. Repair of bidirectional valve of OPU with replacement of NG6 Size proportional valve suitable for Governor operation, 1 no (Parker make) b. Sandwich type throttle valve NG6 1 no ( Parker make) c. Pressure relief valve NG6 1 no( Parker make) 2. Updating of Auto Digital Governor ( Heinemann AGROS DGP_01-G, Complete job) |
GTD/PDC/Tech/62-64 | 27.04.2019 | Electro-Mechanical | Pahalgam, JK | 5 days | NIT | ||||
Implementation of INDAS | eTender Notice no 2 of 2019 | 26.04.2019 | Consultancy | Jammu, JK | see document | see document | Gist | |||
Extension Corrigendum DPR and clearances - Markoot 17 MW HEP - Gurez | JKSPDC/Tech/P-164/S&I/777-782 | 25.04.2019 | Consultancy and DPR | Jammu, JK | see document | see document | Extension | |||
Fabrication of temporary GI sheds for newly procured 7.5 KVA DG sets at Satruna and installation of new DG set at Barnbugh by way of modification of existing GI shed | USHP II/GD/Tech/72-75 | 24.04.2019 | USHP-II | Mechanical | Kangan, JK | NIO | ||||
Lubrication/Minor maintenance of gates and gearings at various locations of power canal. | USHP II/GD/tech/76-77 | 24.04.2019 | USHP-II | Mechanical | Kangan, JK | NIO | ||||
Extension Notice No. 03 of E-NIT No. 16 of 2018-19 dated: 02.03.2019 | GD/LJHP/16 of 2018-19 | 02.03.2019 | 2019_SPDC_72165_1 | LJHP | Electro-Mechanical | Gantamulla, JK | 100.00 Lacs | 120 day73 | Extension | |
Extension Corrigendum 05 - EPC Matchil Kalaroos | JKSPDC/PMDP-2015/P-280/MHEP/547-51 | 20.04.2019 | EPC | Jammu, JK | see document | see document | Extension | |||
Extension Corrigendum 05 - EPC 19 MW Durbok Shyok | JKSPDC/PMDP-2015/P-280/DSHEP-02/528-33 | 20.04.2019 | EPC | Jammu, JK | see document | see document | Extension | |||
Tender notice for Conducting of computer test for shortlisted candidates for the post of Junior Assistants | eTender No 2 of 19 | 16.04.2019 | see jktenders.gov.in | EPC | Jammu, JK | see document | see document | Gist of NIT | ||
Corrigendum to e NIT 14 of 2018-19 | BHEP | Civil works | Chanderkote, JK | see document | see document | Corrigendum notice | ||||
Extension Notice No. 02 of E-NIT No. 16 of 2018-19 dated: 02.03.2019 | GD/LJHP/16 of 2018-19 | 02.03.2019 | 2019_SPDC_72165_1 | LJHP | Electro-Mechanical | Gantamulla, JK | 100.00 Lacs | 120 day73 | Extension | |
Extension Corrigendum - EPC 19 MW Durbok Shyok | JKSPDC/PMDP-2015/P-280/DSHEP-02/06-11 | 01.04.2019 | EPC | Jammu, JK | see document | see document | Extension | |||
Cancellation of eNIT 29 | MECH/BHEP/2367-74 | 30.03.2019 | BHEP | Civil works | Chanderkote, JK | Rs. 101.18 Lac | 4 months | Cancellation notice | ||
Modernization/Renova-tion of one no. passenger cum goods elevator installed at Dam site for the Access to the Dam galleries at Dam of Baghlihar hydroelectric project at Chanderkote, District Ramban, Jammu and Kashmir. | e-NIT No. 29 of 2018-19 | 30.03.2019 | BHEP | Civil works | Chanderkote, JK | Rs. 101.18 Lac | 4 months | NIT | ||
Extension Supply of 14MVA, 11/132KV Power Transformer for 3X35 MW LJHP and supervision during installation/testing /commissioning of Power transformer | GD/LJHP/16 of 2018-19 | 02.03.2019 | 2019_SPDC_72165_1 | LJHP | Electro-Mechanical | Gantamulla, JK | 100.00 Lacs | 120 day73 | Extension | |
Corrigendum for e-nit no: 11 | GTD/PDC/Tech/1271-77 | 20.03.2019 | 2019_ SPDC_ 71520_3 | Electro-Mechanical | Pahalgam, JK | 49.00 | 50 days | Corrigendum | ||
Cancellation of eNIT 12 | GD/LJHP/3375-79 | 23.03.2019 | 2019_SPDC_70506_1 | LJHP | Electrical/Electromechnical | Gantamulla, JK | Cancellation | |||
Extension Corrigendum - Chartered Accountant Firm for implementation of INDAS | JKSPDC/FIN/SA/5983 | 20.03.2019 | Finance Consultancy | Jammu, JK | see document | see document | Extension | |||
Rebabiting of LGB Pads | Ushp II/GD/Tech/963-64 | 05.03.2019 | USHP-II | Electrical | Kangan, JK | NIO | ||||
Cleaning of stator bars | Ushp II/GD/Tech/963-64 | 05.03.2019 | USHP-II | Electrical | Kangan, JK | NIO | ||||
Overhauling of 60 hp induction motor and pump | USHP II/GD/Tech/953-55 | 02.03.2019 | USHP-II | Electrical | Kangan, JK | NIO | ||||
Corrigendum - Markoot HEP 17 MW | JKSPDC/P-164/S&I/5885-86 | 16.03.2019 | Markoot | Gurez, JK | see document | see document | Corrigendum | |||
Extension of tender - Matchil-Kalaroos (25 MW) | JKSPDC/PMDP-2015/P-280/MHEP/5872-76 | 15.03.2019 | Matchil/Kalroos | E-RfP | JK | RFQ | ||||
e-RFQ for Tamasha Hydroelectric Power Project of 12 MW | JKSPDC/PMDP-2015/P-280/Tamasha/5552-65 | 07.03.2019 | Tamasha HEP | EPC | JK | RFQ | ||||
e-RFQ for Phagla Hydroelectric Power Project of 14.1 MW | JKSPDC/PMDP-2015/P-280/Phagla/5566-79 | 07.03.2019 | Phagla HEP | EPC | JK | RFQ | ||||
e-RFQ and RFP for EPC of 23 MW Ans-II | JKSPDC/PMDP-2015/P-280/Ans-II/EPC/5373-84 | 02.03.2019 | Ans II | EPC | JK | RFQ | ||||
1. Construction of 04 number residential Quarters (two floors, two NOS each floor) for shift staff of grid station at BHEP, Chanderkote. 2. Providing and placing of 10000 Ltr. Capacity Polyethylene water storage tank for A-Block at Chenab Vihar Colony, BHEP on existing Platform. |
e-NIT No.16 of 2018-19 | BHEP | Civil works | Chanderkote, JK | see document | see document | NIT | |||
Supply, Installation, Commissioning of Electronic Total Station and Radar based Hydropower Plant Safety, Disaster Management System including Operation and Maintenance works at BHEP Chanderkote, District Ramban, Jammu (JK State) | e-NIT No.15 of 2018-19 | BHEP | Civil works | Chanderkote, JK | 1479 Lacs | 2006 days | NIT | |||
1. Renovation Of Existing Drain Down Stream Of Dibber Store CHEP-IIIrd Udhampur | E-NIT No: 16 of 2018-19 | 08.03.2019 | 1. 2019_SPDC_72462_1 | XEN CCD UDHM | Civil | Udhampur, JK | 2.50 lacs | 30 days | NIT | |
1. Renovation of inspection road along spill channel of CHEP-IIIrd with paver 2. Restoration/Black topping of road in Chennai Hydel Project colony Udhampur (with paver) 3. Renovation / up gradation of approach road to Power House including black toping and construction of drain and R Wall CHEP-IIIrd 4. Providing protection to outfall of tail race channel CHEP-II (shutdown works) |
E-NIT No: 15 of 2018-19 | 06.03.2019 |
1. 2019_SPDC_72288_1 2. 2019_SPDC_72288_2 3. 2019_SPDC_72288_3 4. 2019_SPDC_72288_4 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | NIT | |
Supply of 14MVA, 11/132KV Power Transformer for 3X35 MW LJHP and supervision during installation/ testing /commissioning of Power transformer | GD/LJHP/16 of 2019 | 02.03.2019 | 2019_SPDC_72165_1 | LJHP | Electromechanical | Gantamulla, JK | 100.00 lacs | 120 days | NIT | |
Cancellation Notice of E-NIT No. 01 of 2018-19 dated: 21-07-2018 | E-NIT GD/LJHP/01 of 2018-19 | 01.03.2019 | 2018_SPDC_58202_1 | LJHP | Electrical | Gantamulla, JK | Cancellation Notice | |||
Removal of bulk head over penstock at forebay gate site | AEE/MSD/256 | 16.02.2019 | USHP-II | Mechanical | Kangan, JK | NIO | ||||
Extension: Supply installation testing and commissioning of new battery Bank 02.Volt. each (110 Nos.) cells (OPZS) along with its complete accessories (VRLA) for 3x35 MW LJHP) | GD/LJHP/07 of 2018-19 | 01.03.2019 | 2019_SPDC_69477_1 | LJHP | Electrical | Gantamulla, JK | Extension | |||
Extension: Replacement of defective indicators, push buttons, ammeter, voltmeter, wattmeter, energy meter, relays and other controlling and measuring instruments of standard make and along with this replacement of control cables (19 core, 10 core, 7 core armored cable of 2.5sq mm) of 3x35 MW LJHP. | GD/LJHP/06 of 2018-19 | 01.03.2019 | 2019_SPDC_69474_1 | LJHP | Electro Mechanical | Gantamulla, JK | Extension | |||
Painting / emulsion in Power House Stage-ll including minor repair works BHEP Chanderkote | e-NIT No.13 of 2018-19 | BHEP | Civil works | Chanderkote, JK | NIT | |||||
Extension Changing of old/present Lube oil of unit-I with fresh one alongwith cleaning of oil of oil bath and inspection break pads of 3x35MW LJHP De-slugging of transformers with replacement of fresh transformer oil for one complete bay (03No transformers) of 3x35MW LJHP SITC of New fully automatic synchronous cope for 3x35MW LJHP |
E-NIT No. 09 of 2018 and E-NIT No. 11 of 2018 | 26.02.2019 | 2019_SPDC_70325_2 2019_SPDC_70327_1 2019_SPDC_70330_1 |
LJHP | Electro Mechanical | Gantamulla, JK | NIT | |||
Extension EPC Execution of Durbuk Shyok HEP | JKSPDC/PMDP-2015/P-280/DSHEP-02/5139-54 | 25.02.2019 | Drubuk Shyok HEP | Civil | JK | Extension | ||||
Repair works at Stage-I BHEP Chanderkote | e-NIT No.14 of 2018-19 | BHEP | Civil works | Chanderkote, JK | Rs 503.00 lacs | 130 days | NIT | |||
Corrigendum for e- nit no: 09 of 2018-19 Pahalgam | GTD/PDC/Tech/ 09 of 2018-19 | 05.02.2019 | 2019_ SPDC_ 70649_3 | Electro-Mechanical | Pahalgam, JK | see document | see document | Corrigendum | ||
Complete refurbishment of 1.5 MW Francis Horizontal Axis Generator at 3x1.5MW MHEP Pahalgam (Which comprises of Complete replacement of Stator/Rotor windings and its Installation, testing and Commissioning. F.O.R MHEP Pahalgam | GTD/PDC/Tech/ 11 of 2018-19 | 02.02.2019 | 2019_ SPDC_ 71520_1 | Electro-Mechanical | Pahalgam, JK | 49.00 lacs | 50 days | NIT | ||
Supply installation testing and commissioning of 12V /180 AMhr/25 Plate Battery for DG Set operation F.O.R MHEP Pahalgam | GTD/PDC/TECH/1033-37 | 19.02.2019 | Electrical (Supply of material) | Pahalgam, JK | see document | 20 days for each work | NIT | |||
Corrigendum to e-NIT No. 09 of 2018-19 | GTD/PDC/Tech/113-19 | 14.02.2019 | see document | Pahalgam, JK | see document | see document | Corrigendum | |||
Corrigendum to Procurement of new horizontal axis generator/alternator including its supply, installation, testing commissioning and complete in all other aspects F.O.R MHEP Pahalgam with specification | GTD/PDC/Tech/ 007 | 30.01.2019 | 2019_SPDC_70194__1 | Pahalgam | Electro-Mechanical | Pahalgam, JK | see document | see document | Corrigendum | |
Procurement of 01 No. 75 HP VT Pump for 3X35 MW LJHP | GD/LJHP/15 of 2018-19 | 18.02.2019 | 2019_SPDC_71379_1 | LJHP | Electro Mechanical | Gantamulla, JK | 14.50 Lacs | 60 Days | NIT | |
Procurement of 03 Nos. 75HP motors to be kept standby for dewatering station of power house | GD/LJHP/14 of 2018-19 | 18.02.2019 | 2019_SPDC_71375_1 | LJHP | Electro Mechanical | Gantamulla, JK | 12.00 Lacs | 90 Days | NIT | |
Supply, installation, testing and commissioning of 75 HP vertical Turbine Pumps Complete in all respect alongwith motors (02 Nos.) | GD/LJHP/13 of 2018-19 | 18.02.2019 | LJHP | Electro Mechanical | Gantamulla, JK | 27.00 Lacs | 60 Days | NIT | ||
Repair of slip ring induction motor and lateral traversing mechanism of draft tube | AEE/MSD/250-51 | 18.02.2019 | USHP-II | Mechanical | Kangan, JK | NIO | ||||
Rewinding, repairing of shaft, replacement of impeller of oil circulation motors of11 kv/132 kv 15 MVA transformers of USHP-II. | GSD-I/Tend/175-178 | 13.02.2019 | 2019_SPDC_69614_1 | USHP-II | Electrical | Kangan, JK | NIT | |||
Extension notice for NIT 07 | GD/LJHP/07 of 2018-19 | 16.02.2019 | 2019_SPDC_69477_1 | LJHP | Electric | Gantamulla, JK | see document | see document | Extension | |
Extension notice for Several Electrical and Electromechanical works at LJHP | GD/LJHP/06 of 2018-19 | 14.01.2019 | ID for Item No.04 -2019_SPDC_69387_1 ID for Item No.06 -2019_SPDC_69389_1 ID for Item No.07 -2019_SPDC_69474_1 |
LJHP | Electric/Electromechanical | Gantamulla, JK | see document | see document | Extension | |
Notice inviting E- NIT for RM Works upto September 2019 | NIT- 01 of 02/2019 | 16.02.2019 | Iqbal MHP Kargil | Electromechanical/ Electrical Works | Kargil, JK | NIT | ||||
Notice inviting E- NIT for RM Works | NIT- 04 of 02/2019 | 16.02.2019 | 2019_SPDC_71221_1 | Sanjak MHP Chiktan | Electromechanical/ Electrical Works | Kargil, JK | Rs 9,76,650 | 180 days | NIT | |
Notice inviting E- NIT for RM Works | NIT- 03 of 02/2019 | 16.02.2019 | 2019_SPDC_71220_1 | Haftal MHP Zanskar | Electromechanical/ Electrical Works | Kargil, JK | Rs 8,89,300 | 180 days | NIT | |
Notice inviting E- NIT for RM Works | NIT- 02 of 02/2019 | 16.02.2019 | 2019_SPDC_71219_1 | Marpochoo MHP Drass | Electromechanical/ Electrical Works | Kargil, JK | Rs 11,18,500 | 180 days | NIT | |
Repair and Maintenance Works | NIT- 01 of 02/2019 | 16.02.2019 | 2019_SPDC_71196_1 | Iqbal | Electromechanical/ Electrical Works | Kargil, JK | Rs 23,09,600 | 180 days | NIT | |
Several Cancellation Corrigendum | GD/LJHP/03 of 2018-19, Item No.03 Dtd:10/01/2019 GD/LJHP/03 of 2018-19, Item No.07 Dtd:10/01/2019 GD/LJHP/06 of 2018-19, Item No.01 Dtd:14/01/2019 GD/LJHP/08 of 2018-19, Dtd:14/01/2019 |
06.02.2019 | 2019_SPDC_69083_1 2019_SPDC_69087_1 2019_SPDC_69382_1 2019_SPDC_69478_1 |
LJHP | Gantamulla, JK | see document | see document |
Cancellation Cancellation Cancellation Cancellation |
||
Renovation and sanitary repairs of Divisional Office Ganderbal Staff Bath Rooms | Short Term GDG 02 of 2018-19 | 10.01.2019 | 2019_SPDC_69031_1 | Ganderbal | Civil | Ganderbal, JK | 3.04 Lacs | 30 Days | NIT | |
Corrigendum CMD/LJHP/03 of 2018-19 | CMD/LJHP/1037-49 | 06.02.2019 | LJHP | Gantamulla, JK | see document | see document | Corrigendum | |||
Supply installation testing and commissioning of new battery Bank 02.Volt. each (110 Nos.) cells (OPZS) along with its complete accessories (VRLA) for 3x35 MW LJHP) | GD/LJHP/07 of 2018-19 | 14.02.2019 | 2019_SPDC_69477_1 | LJHP | Electrical | Gantamulla, JK | 15.00 Lacs | 60 Days | Extension | |
Extension of e-NIT 06 of 2018-19 | GD/LJHP/2729-34 | 04.02.2019 | ID for Item No.04 -2019_SPDC_69387_1 ID for Item No.06 -2019_SPDC_69389_1 ID for Item No.07 -2019_SPDC_69474_1 |
LJHP | Electrical/Electromechnical | Gantamulla, JK | see document | see document | Extension | |
Extension notice - supply of essential Spares for 3x35 MW LJHP | GD/LJHP/12 of 2018-19 | 02.02.2019 | 2019_SPDC_70506_1 | LJHP | Electrical/Electromechnical | Gantamulla, JK | 46.40 Lacs | 30 days | NIT | |
Extension notice - supply of essential Spares for 3x35 MW LJHP | GD/LJHP/03 of 2018-19 | 31.01.2019 | 2019_SPDC_69088_1 | LJHP | Gantamulla, JK | see document | see document | Extension | ||
Deweeding of switch yard / barrage/ outer powerhouse | GD/LJHP/10 of 2018-19 | 31.01.2019 | 2019_SPDC_70347_1 | LJHP | Printing | Gantamulla, JK | 5.23 lacs | 30 Days | NIT | |
Supply, Installation, Testing and commissioning of new fully Automatic Synchronous cope for 3x35 MW LJHP Power House. Replacement of Seals i,e Shaft seals (03 Nos) Servo Motor Seals (06 Seals) of3x35MWLJHP Power House. Construction of Guard Hut/ Sanitary Post at Main Gate of 3X35MW Power House Procurement of 02 No. additional motors of capacity of 15HP and 10HP as stand by for operation of Barrage Gates for 3X35MW Power House. as per sample Complete replacement of 14” sluice valves of De-silting pipe of fore bay of 3x35MW LJHP Power House. Replacement of damaged Globe Valve 8" of Generator Cooling water Pipes pertaining of Unit I, II, III (03.Nos) Construction/repairs of bathrooms at Division Office building of Generation Division LJHP and SE Generation Wing Baramulla. |
GD/LJHP/11 of 2018-19 | 31.01.2019 | 2019_SPDC_70330_1 2019_SPDC_70331_1 2019_SPDC_70332_1 2019_SPDC_70333_1 2019_SPDC_70334_1 2019_SPDC_70335_1 2019_SPDC_70336_1 |
LJHP | Electrical/Electromechnical/Civil | Gantamulla, JK | see document | 45 days | NIT | |
Changing of old/present lube oil of Unit-Ist with fresh one along with cleaning of oil of oil bath and inspecting of brake pads simultaneously, of 3x35 MW LJHP Power House. De-Slugging of Transformers with replacement of fresh Transformer Oil for one complete bay (3 No. Transformers) of 3x35 MW LJHP Power House. |
GD/LJHP/09 of 2018-19 | 30.01.2019 | 2019_SPDC_70325_1 2019_SPDC_70327_1 |
LJHP | Electrical | Gantamulla, JK | see document | see document | NIT | |
Extension to NIT GDG/02 of 2018-19 | GDG/1365-71 | 31.01.2019 | 2019_SPDC_69031_1 | Ganderbal | Civil | Ganderbal, JK | Extension | |||
Clearing jungle grass, brush wood trees and sapling including uprooting of rank vegetation from 132KV Switch Yard Area of GT Units 1 and 2 ,Divisional Store yard of Gas Turbine Phase II Pam[pore | e- NIT No: GTD/ 08 of 2018-19 | 30.01.2019 | Pahalgam | Civil | Pahalgam, JK | see document | 10 days | NIT | ||
a) Design, Reverse Engineer, Manufacture Supply, installation, testing and commissioning of 1.5MW Francis Horizontal Synchronous generator, Exciter, Exciter panel along with other accessories for unit II at MHEP Pahalgam. b) Procurement of instrument/control cables of sizes for complete reinstallation of unit II at MHEP Pahalgam. |
e- NIT No: GTD/ 07 of 2018-19 | 30.01.2019 | 2019_SPDC_70194 _1 | Pahalgam | Electro-Mechanical | Pahalgam, JK | see document | see document | NIT | |
Corrigendum of e-NIT No.-03 Item No.01 e-NIT No:-08 e-NIT No.06 Item NO.01. |
GD/LJHP/2639-46 | 28.01.2019 | 2019_SPDC_69038_1 2019_SPDC_69478_1 2019_SPDC_69382_1 |
Electromechanical | Civil | Gantamulla, JK | see document | see document | Corrigendum | |
(i) Restoration of water supply to power House by way of repairmen of submersible pumps on right side of the Chahla bridge and Ushkara Colony (ii) Clearance of Snow from project road on LJHP Gantamulla (iii) Installation of caution boards at different spots of LJHP Gantamulla (iv) Restoration of water supply to Power House by way of repairmen of submersible pumps on left side of Chahla bridge. |
NIT No:- CMD/LJHP/ 03 of 2018-19 | 28.01.2019 | 2019_SPDC_69475_1 | LJHP | Civil | Gantamulla, JK | see document | see document | NIT | |
Extension notice Repair works at Stage I, BHEP Chanderkote | eNIT No. 13 | 2018_SPDC_68476 | BHEP | Civil works | Chanderkote, JK | Extension Notice | ||||
Cancellation Notice of E-NIT No. 06 item No 08 Dated 14.01.2019 | GD/LJHP/2575-81 | 23.01.2019 | 2019_SPDC_69475_1 | LJHP | Civil | Gantamulla, JK | Corrigendum | |||
Corrigendum for e-NIT No. 40 - Different Panel works of CHEP-III | GEN/PDC/U/3519-21 | 23.01.2019 | 2018_SPDC_68256_1 | CHEP-III | RMU Works | Udhampur, JK | Corrigendum | |||
1. Restoration of damages to Spill Channel of BR including jungle weed clearance along spill channel CHEP –III 2. Renovation Of Existing Drain Down Stream Of Dibber Store CHEP-IIIrd Udhampur 3. Clearance /Restoration of Super passage at RD 1770 mt / 4350 mt of CHEP-III PDC Udhampur |
E-NIT 14 of 2018-19 | 23.01.2019 |
1. 2019_SPDC_69837_1 2. 2019_SPDC_69837_2 3. 2019_SPDC_69837_3 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | NIT | |
1. Renovation of inspection road along spill channel of CHEP-IIIrd with paver 2. Restoration/Black topping of road in Chennai Hydel Project colony Udhampur (with paver) 3. Renovation / up gradation of approach road to Power House including black toping and construction of drain and R Wall CHEP-IIIrd 4. Providing protection to outfall of tail race channel CHEP-II (shutdown works) |
E-NIT 13 of 2018-19 | 23.01.2019 | 1. 2019_SPDC_69831_1 2. 2019_SPDC_69831_2 3. 2019_SPDC_69831_3 4. 2019_SPDC_69831_4 | XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | NIT | |
Corrigendum/Extension to NIT GDG/02 of 2018-19 | GDG/1365-71 | 23.01.2019 | 2019_SPDC_69031_1 | Ganderbal | Civil | Ganderbal, JK | Extension | |||
Several works - see document | GTD/PDC/Tech/ 04 | 16.01.2019 | see document | Pahalgam | Electro-Mechanical/Civil/Office accessories | Pahalgam, JK | see document | see document | NIT | |
a) De-slugging of 3 No old Power Transformers of Unit I,II and III including painting of transformers and replacement of oil at MHEP Pahalgam. b) Supply, installation, testing and commissioning of new battery bank along with battery charger for MHEP Pahalgam. c) Repair/reconditioning of Sub Division Office hut by way of providing woodwork and necessary bath room/kitchen facilities complete all, at MHEP Pahalgam. |
GTD/PDC/Tech/ 06 | 17.01.2019 | see document | Pahalgam | Electro-Mechanical/Civil/Office accessories | Pahalgam, JK | see document | see document | NIT | |
a) Energy saving illumination, strengthening of existing LT line from Power house to Headwork’s along the canal, Providing pole mounted energy saving LED lights at forebay/Headwork’s along canal and back of powerhouse for safety of power house b) Providing/supplying of locker, computer (laptop), printer, chairs for sub divisional office. c) Repair/restoration/motorization of 15 Ton hoist crane inside the power house with replacement of worn out parts and allied works. d) Repair of Power House bath rooms including provision for drinkingwater filters in power house and Sub-Divisional office at MHEP Pahalgam. e) Providing and fixing of movable gangway at Syphon of power house canal under OM Works at MHEP Pahalgam f) Supply of Generator Coupling 160mm inner dia as per Sample g) Supply of Generator bearing 160mm inner dia as per sample h) Supply of Mechanical Spares for Power House MHEP Pahalgam I) Supply of Electrical Spares for MHEP Pahalgam. |
GTD/PDC/Tech/ 05 | 17.01.2019 | see document | Pahalgam | Electro-Mechanical/Civil/Office accessories | Pahalgam, JK | see document | see document | NIT | |
Replacement of shaft sleeve of unit II and unit III at USHP II Kangan | USHP II/GD/Tech/24 | 18.01.2019 | 2019_SPDC_69614_1 | USHP-II | Mechanical | Kangan, JK | 7.8 lacs | 30 days | NIT | |
Overhauling of PRV of unit II at USHP II Kangan | USHP II/GD/Tech/23 | 18.01.2019 | 2019_SPDC_69609_1 | USHP-II | Mechanical | Kangan, JK | 9.00 lacs | 30 days | NIT | |
Supply, manufacture, fabrication and installation of Bulkhead at the back end of MIV of unit II at USHP II Kangan | USHP II/GD/Tech/22 | 18.01.2019 | 2019_SPDC_69590_1 | USHP-II | Mechanical | Kangan, JK | 10.45 lacs | 30 days | NIT | |
Overhauling of 11 KV vacuum circuit breakers of 3.15 MVA receiving station USHP II Kangan | USHP II/GD/Tech/20 | 18.01.2019 | 2019_SPDC_69605_1 | USHP-II | Electrical | Kangan, JK | 3.07 lacs | 15 days | NIT | |
Wear and Corrosion protection of spiral casing, stay vanes and stay rings of unit-II at USHP II Kangan. | USHP II/GD/Tech/20 | 18.01.2019 | 2019_SPDC_69575_1 | USHP-II | Mechanical | Kangan, JK | 46.60 lacs | 45 days | NIT | |
Repairing / Renovation of office building of Chief Engineer Office as per Scope of work | NIT No: GDS/ 14 | 21.01.2019 | USHP-I | Civil | Karnah, JK | see document | 20 days | NIT | ||
1. Design, Engineering, Supply, Installation, Testing and Commissioning of Digital Excitation System, Numerical Protective Relay and Control, and Micro Processor based Digital Governor System for Unit-I & Unit-II of MHP Karnah including dismantling of existing equipment. | e-NIT No. ECDK/476-82 | 19.01.2019 | 2019_SPDC_69761_1 | Karnah | Electro-Mechanical | Karnah, JK | see document | 120 days | NIT | |
1. Complete Overhauling of Unit-II including supply, installation, testing and commissioning of replaceable parts of unit-II along with supply of spares like washers, bushes and seals and other spears as per requirement complete Job. 2. Motorization of Gates and Gearings at Head works, Fore bay, and Tailrace Pool including repair and renovation of tailrace pool Gates |
e-NIT No. ECDK/469-75 | 19.01.2019 |
1. 2019_SPDC_69024_1 2. 2019_SPDC_69025_1 |
Karnah | Electro-Mechanical | Karnah, JK | see document | 45 days | NIT | |
Face Uplifting of the Office of Generation Circle-II, JKSPDC Bemina | SEG/II/PDC/Tech/02 of 2018-19 | 21.01.2019 | Bemina | Civil | Srinagar, JK | 3.25 Lacs | NIT | |||
Corrigendum to E-NIT No. 05 of 2018-19 | GD/LJHP/08 | 10.01.2019 | 2019_SPDC_69089_1 | LJHP | Civil | Gantamulla, JK | Corrigendum | |||
Renovation and modernization of existing 11KV switch yard of USHP-I, Sumbal as per Scope of Work | GDS/ 13 of 2018-19 | 18.01.2019 | USHP-I | Electrical | Sumbhal, JK | see document | 30 days | NIT | ||
Renovation, Modernization, Stabilization and Repairing of L.T System of power House USHP-I Sumbal as per Scope of Work | GDS/ 12 of 2018-19 | 18.01.2019 | USHP-I | Electrical | Sumbhal, JK | see document | 30 days | NIT | ||
Procurement of 01 No. 75 HP VT Pump for 3X35 MW LJHP. | GD/LJHP/08 | 14.01.2019 | 2019_SPDC_69478_1 | LJHP | Electromechanical | Gantamulla, JK | 14.50 lacs | 60 days | NIT | |
Supply installation testing and commissioning of new battery bank 02 volt. Each (110nos) cells (OPZS) alongwith its complete accessories (VRLA) for 3x35MW LJHP. | GD/LJHP/07 | 14.01.2019 | 2019_SPDC_69477_1 | LJHP | Electromechanical | Gantamulla, JK | 15.00 lacs | 60 days | NIT | |
Procurement of 03 Nos. 75HP motors to be kept standby for dewatering station of power house Providing and fixing of Monorail Crane 5 Ton capacity LJHP Store. Providing of motorized gantry for outside dewatering Station for 3x35MW LJHP Complete Installation of LGB, UGB, Thrust and TGB pads of unit-I on H.S system for 3x35MW LJHP Providing of Gang way/Foot bridge along hoist bridge of HR Gates from riverside for hassle free and safe movement of operational staff during maintenance. Up-Gradiation Of The Existing CCTV Surveillance System With New High Resolution, Motorized IP Base Cameras In The Power House (As Per CEA IB Recommendation) For 3x35MW LJHP Replacement of defective indicators, push buttons, ammeter, voltmeter, wattmeter, energy meter, relays and other controlling and measuring instruments of standard make and along with this replacement of control cables (19 core, 10 core, 7 core armored cable of 2.5sq mm) of 3x35 MW LJHP. Supply and installation of new 300KVA (11KV/11KV)AVR for remaining two units i.e, Unit-II and Unit-III of 3x35MW LJHP |
GD/LJHP/06 | 14.01.2019 |
2019_SPDC_69382_1 2019_SPDC_69385_1 2019_SPDC_69386_1 2019_SPDC_69387_1 2019_SPDC_69388_1 2019_SPDC_69389_1 2019_SPDC_69474_1 2019_SPDC_69475_1 |
LJHP | Civil | Gantamulla, JK | see document | see document | NIT | |
Installation of CCTV Cameras inside and outside Power House at Ganderbal. | GDG 03 of 2018-19 | 15.01.2019 | Ganderbal | Electrical | Ganderbal, JK | 2.15 Lacs | 30 Days | NIT | ||
Supply of Deep Freezer 565 Litre | eNIT No. 1 | BHEP | Supply | Chanderkote, JK | NIT | |||||
Supply of LED Full HD TV 40 inch (100 cm) | eNIT No. 2 | BHEP | Supply | Chanderkote, JK | NIT | |||||
Repairing of Divisional office, Guest house and Executive Engineer Quarter as per scope work at USHP-I, Sumbal | GDS/ 11 of 2018-19 | 15.01.2019 | USHP-I | Supply | Sumbhal, JK | see document | 20 days | NIT | ||
Rate contract for various consumables | GDS/ 10 of 2018-19 | 09.01.2019 | USHP-I | Supply | Sumbhal, JK | see document | NIT | |||
Rate contract for various Spares | GDS/ 09 of 2018-19 | 09.01.2019 | USHP-I | Supply | Sumbhal, JK | see document | NIT | |||
Printing of Log Sheets, Gate Pases visitors Book, Requisition forms etc for LJHP Powerhouse | GD/LJHP/04 | 10.01.2019 | LJHP | Civil | Gantamulla, JK | 0.97 Lacs | 30 days | Page 1 NIT
| Page 2 NIT | |
Construction of Sub Divisional Office Stores at LJHP Power House | GD/LJHP/05 of 2018-19 | 10.01.2019 | 2019_SPDC_69089_1 | LJHP | Civil | Gantamulla, JK | 17.55 lacs | 60 days | NIT | |
Complete Reconditioning of 04 No Spillway Gates of 3X35 MW LJHP. Providing of Gang Way along 10.No Gates and Segregation of Barrage from Bridge side for hassle free movement of staff during maintenance and operation of gates. Supply, installation, testing and commissioning of 75 HP vertical Turbine Pumps Complete in all respect alongwith motors (02 Nos.) Replacement of complete delivery pipe line of inside dewatering. Complete replacement of oil pipe line (seamless) of Governor OPU along with allied parts/accessories (valves for) all the three units. Replacement of all shut-off valves and cooling pipes (Seamless) by new ones in alternator section of Unit-I and Unit-III Supply, Installation, Testing and Commissioning of Transformer oil online dryout system at LJHP power house. Supply of Essential Spares. |
GD/LJHP/03 of 2018-19 | 10.01.2019 |
2019_SPDC_69081_1 2019_SPDC_69082_1 2019_SPDC_69083_1 2019_SPDC_69084_1 2019_SPDC_69085_1 2019_SPDC_69086_1 2019_SPDC_69087_1 2019_SPDC_69088_1 |
LJHP | Electromechanical | Gantamulla, JK | see document | see document | NIT | |
1. Repair/renovation of JE Quarter at Pingala Haridal of MHP Karnah. 2. Supply, Installation, testing and commissioning of 63KVA 3-ɸ LT Servo Stabilizer with a constant output of 440 Volts from a range of 180-440V variable inputs for Power House including 10KVA 1-ɸ LT Servo Stabilizer with a variable input of 90-230V. | eNIT No. 4 | 09.01.2019 | 1. 2019_SPDC_69024_1 2. 2019_SPDC_69025_1 |
Karnah | Electro-Mechanical | Karnah, JK | see document | 45 days | NIT | |
1. Supply of Thrust and Guide Bearings. 2. Supply of Mechanical Spares for Power House. 3. Supply of Electrical Spares for Power House. 4. Supply of Stationery and Power House log books etc. 5. Supply of Safety Equipment’s. 6. Reclamation, Repair and Rewinding of damaged Electric motors of different capacities of Governor. 7. Re-bibitting (white Metaling) of Pedestal Bearings, bearing pads of driving end and non-driving end bearing including installation and testing. 8. Supply and Installation of Water Purifiers along with overhead Water Tanks and lifting pumps and other necessary fittings at Divisional Office and Power House of MHP Karnah. |
eNIT No. 1 | 09.01.2019 | 1. 2019_SPDC_69015_1 2. 2019_SPDC_69017_1 3. 2019_SPDC_69018_1 4. 2019_SPDC_69019_1 5. 2019_SPDC_69020_1 6. 2019_SPDC_69021_1 7. 2019_SPDC_69022_1 8. 2019_SPDC_69023_1 |
Karnah | Electro-Mechanical | Karnah, JK | see document | see document | NIT | |
Deweeding / Cutting of bushes of Store Yard, power house periphery, yard of divisional office/Store/workshop. | Short Term GDG 01 of 2018-19 | 10.01.2019 | Ganderbal | Electromechanical | Ganderbal, JK | 2.08 Lacs | 15 Days | NIT | ||
Cancellation of NIT No. 04 of 2018-19, dt: 28.12.2018 | 10.01.2019 | CID | Civil | Bemina, JK | see document | see document | Cancellation notice | |||
Cancellation of NIT No. 03 of 2018-19, dt: 26.12.2018 | 10.01.2019 | CID | Civil | Bemina, JK | see document | see document | Cancellation notice | |||
1. Construction of brick walling on back side of the Divisional office building CID PDC Bemina Srinagar.
2. Repairs and Renovation of Inspection Hut at Sonamarg including its maintenance. |
NIT 04 of 2019 | 10.01.2019 | CID | Civil | Bemina, JK | see document | see document | NIT | ||
Supply, installation, testing and commissioning of digital pressure meters(04 NO.) with 4-20mA output signal (pressure range 0-25bar) along with 10No signal splitters (SCADA Compatible) including cabling | NIT No: GDS/ 08 of 2018-19 | 07.01.2019 | USHP-I | Electrical | Sumbhal, JK | see document | 30 days | NIT | ||
Supply, Installation, Testing and Commissioning of UltraSonic Bird Repellant devices for USHP-I, Sumbal | NIT No: GDS/ 07 of 2018-19 | 07.01.2019 | USHP-I | Electrical | Sumbhal, JK | see document | 15 days | NIT | ||
Permanent Shifting of 11 KV forebay / 11KV colony feeder which were passing through premises of Govt Secondary School Sumbal bala and Stabilization / Improvement of LT network inside and outside of Power house and improvement of 250 KVA substation at residential colony for smooth power supply | NIT No: GDS/ 06 of 2018-19 | 07.01.2019 | USHP-I | Electrical | Sumbhal, JK | see document | 30 days | NIT | ||
Face Uplifting of the Office of Generation Circle-II, JKSPDC Bemina. | SEG/II/PDC/Tech/760-63 of 2018-19 | 03.01.2019 | Bemina | Civil | Srinagar, JK | NIT | ||||
Supply of Office Furniture (Godrej Make) - Dasti Quotation | SEG/II/PDC/Tech/760-63 of 2018-19 | 30.01.2019 | USHP-I Sumbal | Supplies | Srinagar, JK | 3.67 Lacs | Dasti Quotation | |||
Repair works at Stage I, BHEP Chanderkot | eNIT No. 13 | 2018_SPDC_68476_1 | BHEP | Civil works | Chanderkote, JK | 503.00 Lacs | 130 days | NIT | ||
Supply, Installation, Testing and Commissioning of Multi Stage High Pressure Reciprocating/ Rotary Screw Air Compressor (42.18 Kg/Cm2) with Water cooler, after cooler a Moisture Separator along with 20 HP Motor, Starter and Wiring and other Mechanical components (complete unit). | NIT No. ECDK/420-25 | 31.12.2018 | Karnah | Electro-Mechanical | Karnah, JK | 25 days | NIT
Tender Doc |
|||
Different Panel works of CHEP-III | GEN/PDC/U/RMU/e- NIT-340 | 31.12.2018 | 2018_SPDC_68256_1 | CHEP-III | RMU Works | Udhampur, JK | NIT |