Tender Notifications-2018
Pre Bid Notifications
Description | No. | Date | Link |
---|---|---|---|
Pre-bid meeting notice 17 MW Markoot HEP | 29.12.2018 | Click here | |
Extension and pre-bid meeting notice Durbuk Shyok HEP | 11.10.2018 | Click here | |
RfP for 25 MW Matchil Kalaroos HEP - Replies to Prebid queries - Corrigendum | JKSPDC/PMDP-2015/P-280/DSHEP/739-43 | 06.11.2018 | Click here |
Prebid meeting RFP for 25 MW Matchil Kalaroos HEP | 23.07.2018 | Click here | |
Replies to pre-bid queries Bonar and Ratan Nag | 18.07.2018 | Click here | |
Replies to pre-bid queries Kalaroos-II | 26.05.2018 | Click here | |
Replies to Bidder Queries - Tamasha, Phagla and Durbuk Shyok | 14.05.2018 | Click here | |
Response to Bidder Queries Machil HEP | 14.03.2018 | Click here | |
Karnah HEP 12 MW - Tender for PMC - Replies to the bidder queries | 30.01.2018 | Click here | |
Works Tenders
Description | NIT NO. | Date | Associated eNIT No | Project | Type of Work | Location of Work | Cost of Work | Time of Completion | Link | |
---|---|---|---|---|---|---|---|---|---|---|
a. Procurement of new Horizontal axis generator/alternator including its supply, installation, testing commissioning and complete in all other aspects for unit 2nd F.O.R MHE Pahalgam ,with specificationMW:1.5/1.650(10% COL), MVA: 1875/2062.5(10%COL), Pole:8 No, Frequency : 50HZ (+/-5%), Voltage:3.3(+/-10%), Current: 328/361A9+/_10%COL), P F: 0.8 , Speed: 750 rpm , Direction of rotation CW viewing from NDE Side. Static excitation System. | GTD/PDC/Tech/16-17 | 27.12.2018 | Pahalgam | Electro-Mechanical | Pahalgam, JK | see document | see document | NIT | ||
Connection anf repairing of current carrying lead with rotor pole of unit II of USHP-II, Kangan | USHP II/GD/Tech/19 | 12.12.2018 | USHP-II | Electrical | Kangan, JK | NIT | ||||
Extension No 2 of NIT for EPC Execution of Durbuk Shyok | JKSPDC/PMDP-2015/P-280/DSHEP/2566-70 | 25.12.2018 | Corporate Office | Civil | see document | see document | see document | Extension Notice | ||
1. Construction of brick walling on back side of the Divisional office building CID PDC Bemina Srinagar. 2. Repairs and Renovation of Inspection Hut at Sonamarg including its maintenance. |
CID/Sgr/918-33 | 26.12.2018 | Xen CID Srinagar | Civil | Srinagar, JK | see document | see document | NIT | ||
1. Restoration of Gauge Post, Cable Post and Channelization of Float Run Area of G and D Site Dibber, Tara, Duddu on Tawi River, Punara, Makrai on Ujh River in District Udhampur and Bani on Sewa River in District Kathua of Head Quarter Sub-Division Jammu. 2. Restoration of Gauge Post, Cable Post, Identification Blocks and Channelization of Float Run Area of Gand D Sites Dharmari on Ans River and Plassu on Plassu Nallah in District Reasi of Sub-Division Matlote. 3. Restoration of Gauge Post, Cable Post and Channelization in between Float Run at G and D Site Darungli in District Poonch of Sub-Division Surankote. 4. Restoration / Channelization of G and D Site Ujhan on Darhali Nallah by way of Removal of deposited material in the Float Run area in District Rajouri of Sub-Division Rajouri | CID/JKSPDC/1224-30 | 26.12.2018 | CI&D | Jammu, JK | see document | see document | Notice | |||
Engineering, procurement and construction (EPC) package for the work “Restoration of damaged slope protection works D/S Outfall- II”at BHEP Chanderkote, District Ramban, Jammu (J&K State). | e-NIT No 12 of 2018-19 | 2018_SPDC_67578_1 | BHEP | Civil | Chanderkote, JK | Rs.1363.00 lac | 325 Days | NIT | ||
Supply and installation/fixing of barbed wire around penstock of USHP-Ist Kangan, on angle Iron posts grouted in cement concrete blocks | NIT No: GDS/ 05 | 19.12.2018 | USHP-I | Civil | Sumbhal, JK | see document | 30 days | NIT | ||
a. Procurement of new Horizontal axis generator/alternator including its supply, installation, testing commissioning and complete in all other aspects for unit 2nd F.O.R MHE Pahalgam ,with specification MW:1.5/1.650(10% COL), MVA: 1875/2062.5(10%COL), Pole:8 No, Frequency : 50HZ (+/-5%), Voltage:3.3(+/-10%), Current: 328/361A9+/_10%COL), P F: 0.8 , Speed: 750 rpm , Direction of rotation CW viewing from NDE Side. b. Complete repairing/replacement of damaged stator and rotor windings of unit 2nd of the said horizontal axis generator F.O.R MHEP Pahalgam with specifications as under MW:1.5/1.650(10% COL), MVA: 1875/2062.5(10%COL), Pole:8 No, Frequency : 50HZ (+/-5%), Voltage:3.3(+/-10%), Current: 328/361A9+/_10%COL), P F: 0.8 , Speed: 750 rpm , Direction of rotation CW viewing from NDE Side. | GTD/PDC/Tech/780-81 | 17.12.2018 | Pahalgam | Electro-Mechanical | Pahalgam, JK | see document | see document | NIT | ||
1. Restoration of Gauge Post, Cable Post and Channelization of Float Run Area of G and D Site Dibber, Tara, Duddu on Tawi River, Punara, Makrai on Ujh River in District Udhampur and Bani on Sewa River in District Kathua of Head Quarter Sub-Division Jammu. 2. Restoration of Gauge Post, Cable Post, Identification Blocks and Channelization of Float Run Area of G and D Sites Dharmari on Ans River and Plassu on Plassu Nallah in District Reasi of Sub-Division Matlote. 3. Restoration of Gauge Post, Cable Post and Channelization in between Float Run at G and D Site Darungli in District Poonch of Sub-Division Surankote. 4. Restoration / Channelization of G and D Site Ujhan on Darhali Nallah by way of Removal of deposited material in the Float Run area in District Rajouri of Sub-Division Rajouri | E-NIT NO. 01 OF 2018 | 13.12.2018 | CI&D | Jammu, JK | see document | see document | Notice | |||
i. Repairing and maintenance of water cooling system of 3 No. machines at CHEP-I. ii. Inspection of 3 No. runners with allied works and Replacement of 1 No. bush of spherical valve for M/c-V at CHEP-I iii. Repair to 3no. hydro mechanical canal gates and Realignment to 2no. hydro mechanical escape gates of CHEP-I. iv. Bus bar, Breaker with allied associated works at CHEP-I. |
GEN/PDC/U/RMU/e- NIT-36 to eNIT-39 | 17.10.2018 | i. 2018_SPDC_67499_1 ii. 2018_SPDC_67501_1 iii. 2018_SPDC_67503_1 iv. 2018_SPDC_67508_1 |
XEN GEN UDHM | O and M Works | Udhampur, JK | NIT | |||
Supply, erection, testing and commissioning of thurst roller bearings SKF-29244 at CHEP-II | GEN/PDC/U/RMU/e- NIT-35 | 17.10.2018 | 2018_SPDC_67424_1 | XEN GEN UDHM | O and M Works | Udhampur, JK | NIT | |||
1. Plugging of leakages in Balancing Reservoir of CHEP-IIIrd by way of (I) Injection grouting (2) High grade polymer based plastering (3) Joint treatment with polysulphide/PU sealant and finally sealed with polysulphide hyperlon tape fixed with epoxy (4) RCC in mix 1:1:2 grade cement concrete mixed with water proofing mixture @ 1 kg per 50 kg of cement and including cost of admixture to accelerate/ retard setting of concrete, improve workability without impairing strength and durability of concrete. | E-NIT 12 of 2018-19 | 14.12.2018 | 2018_SPDC_67284_1 | XEN CMD UDHAMPUR | Civil | see document | 31.82 Lacs | 30 days | NIT | |
Preparation of DPR including assisting the client in obtaining clearances besides preparation of tender and all activities till signing a contract with contractor for 17 MW Markoot HEP Gurez | JKSPDC/2008 | 11.12.2018 | see jktenders.gov.in | Corporate Office | Civil | see document | see document | see document | Extension Notice | |
Matchil Kalaroos-I HEP - Extension Notice No: 2 | JKSPDC/PMDP-2015/P-280/MHEP/1979-85 | 10.12.2018 | Corporate Office | Civil | see document | see document | see document | Extension Notice | ||
a. Procurement of new generator/alternator including its supply, installation, testing commissioning and complete in all other aspects for unit 2nd F.O.R MHE Pahalgam with specification in the document b. Complete repairing/replacement of damaged stator and rotor windings of unit 2nd of the said generator F.O.R MHEP Pahalgam with specifications with specification in the document |
GTD/PDC/Tech/ 752-54 | 08.12.2018 | Pahalgam | Electro-Mechanical | Pahalgam, JK | see document | see document | NIT | ||
All risk protection and Maintenance contract of HVAC System (including services, consumables, T and P (items and spares) installed in power house of 3x150 MW Baglihar hydroelectric project stage-I at Chanderkote, district Ramban, Jammu and Kashmir for 24 months. | e-NIT No 21 of 2018-19 | 04-12-2018 | 2018_spdc_66645_1 | BHEP | Electro-Mechanical | Chanderkote, JK | Rs. 113.1 lac | 730 Days | NIT | |
Repair and Maintenance contract of all fire detection ,fire alarm, control ,protection and fire fighting system (including services and spares) of 3x150 MW Baglihar hydroelectric project stage-I at Chanderkote, district Ramban, Jammu and Kashmir for 24 months. | e-NIT No 22 of 2018-19 | 04-12-2018 | 2018_spdc_66644_1 | BHEP | Electro-Mechanical | Chanderkote, JK | Rs. 72.01 lac | 730 Days | NIT | |
All risk protection and Maintenance contract of OMEGA elevators (02 no’s) (including services, consumables, T and P (items and spares) installed in power house of 3x150 MW Baglihar hydroelectric project stage-II at Chanderkote, district Ramban, Jammu and Kashmir for 24 months. | e-NIT No 24 of 2018-19 | 04-12-2018 | 2018_spdc_66643_1 | BHEP | Electro-Mechanical | Chanderkote, JK | Rs. 19.387 lac | 730 Days | NIT | |
All risk protection amd Maintenance contract of OTIS elevators (02 no’s) (including services, consumables, T and P (items and spares) installed in power house of 3x150 MW Baglihar hydroelectric project stage-I at Chanderkote, district Ramban, Jammu and Kashmir for 24 months. | e-NIT No 23 of 2018-19 | 04-12-2018 | 2018_spdc_66640_1 | BHEP | Electro-Mechanical | Chanderkote, JK | Rs. 19.23 lac | 730 Days | NIT | |
Carrying out overhauling of the EOC 60 HP pump assembly including replacement of damaged parts of unit III of USHP-II, Kangan | USHP II/GD/Tech/697 | 01.12.2018 | USHP-II | Electrical | Kangan, JK | NIT | ||||
General overhauling of 11 KV vacuum circuit breakers of 3.15 MVA receiving station of USHP-II, Kangan | USHP II/GD/Tech/698 | 01.12.2018 | USHP-II | Electrical | Kangan, JK | NIT | ||||
Repair/Restoration of store complex including providing and fixing of Door Shutters at PDC Complex Sopore | EE/CID/PDC/SPR/03 OF 2018 | 03.12.2018 | 2018_SPDC_66558_1 | Sopore | Mechanical/Civil | Sopore, JK | 448700 | 120 days | NIT | |
Electrica/Electromechanical works at Pahalgam - AVR | GTD/PDC/Tech/736-37 | 29.11.2018 | Pahalgam | Mechanical/Civil | Pahalgam, JK | see document | see document | NIT | ||
1. Construction of Path (staircase) from Powerhouse residential hut to Forbay of MHEP Pahalgam. 2. Fabrication/ Providing and fixing of MS stair case from bottom to top of Forbay gates of MHEP Pahalgam. |
No:03 of 2018 | 27.11.2018 | 2018_SPDC_66167_1 2018_SPDC_66193_1 |
Pahalgam | Mechanical/Civil | Pahalgam, JK | see document | see document | NIT | |
Corrigendum to NIT 11 of 2018-19 | CMD/e-NIT/124/1824-30 | 28.11.2018 | XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Corrigendum | ||
Corrigendum to NIT 10 of 2018-19 | CMD/e-NIT/124/1814-20 | 28.11.2018 | XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Corrigendum | ||
Supply of 5hp electric motors for Power House USHP-II | USHP II/GD/Tech/650 | 22.11.2018 | USHP-II | Electrical | Kangan, JK | NIT | ||||
Supply, manufacture, fabrication, installation, testing and commissioning of bulk head 0f unit II at MIV Power House USHP-II | USHP II/GD/Tech/668 | 22.11.2018 | USHP-II | Mechanical | Kangan, JK | NIT | ||||
Supply of hydraulic rollers for Power House USHP-II | USHP II/GD/Tech/651 | 19.11.2018 | USHP-II | Mechanical | Kangan, JK | NIT | ||||
Illumination by way of installation of LEDs in store of USHP-II | USHP II/GD/Tech/653 | 19.11.2018 | USHP-II | Electrical | Kangan, JK | NIT | ||||
Fabrication of Main gate at divisional office store at USHP II Kangan | USHP II/GD/Tech/652 | 19.11.2018 | 2018_SPDC_65422_1 | USHP-II | Mechanical | Kangan, JK | 10.32 lacs | NIT | ||
Procurement of 01 No. 75HP VT Pump for 3X35 MW LJHP. | GD/LJHP/06 of 2017 | 06.11.2018 | 2017_SPDC_47266_1 | LJHP | Mechanical | LJHP, JK | NIT | |||
Extension of NIT for EPC Execution of Durbuk Shyok | JKSPDC/PMDP-2015/P-280/DSHEP/1294-98 | 22.11.2018 | Corporate Office | Civil | see document | see document | see document | Extension Notice | ||
1. Restoration/Black topping of road in Chennai Hydel Project colony Udhampur (with paver) 2. Renovation of inspection road along spill channel of CHEP-IIIrd with paver 3. Renovation / up gradation of approach road to Power House including construction of drain and R Wall CHEP-IIIrd 4. Repair/Renovation of Executive Engineer quarter (2 no.) for official residence of Executive Engineer CMD PDC Udhampur and Executive Engineer Gen Div. PDC Udhampur 5. Providing protection to outfall of tail race channel CHEP-II (shutdown works) |
E-NIT No: 11 of 2018-19 | 17.11.2018 | 1. 2018_SPDC_65540_1 2. 2018_SPDC_65540_2 3. 2018_SPDC_65540_3 4. 2018_SPDC_65540_4 5. 2018_SPDC_65540_5 |
Xen CMD Udhampur | Civil | Udhampur JK | see document | see document | NIT | |
1. Channelization of River Tawi for smooth flow of water into supply channel for power generation CHEP-III (Part-I) 2. Construction of septic tanks and soakage pits at Guest house and sub-division office, Chenani. 3. Removal of slips /Checking of slips by laying of crates and masonry wall along the right bank of water conductor from RD 1560m to 5018m of CHEP-III 4. Construction of damaged panels of tail race channel CHEP-III at Udhampur. 5. Training of hill slopes downstream of Dibber Store of CHEP-III at Udhampur. 6. Renovation Of Existing Drain Down Stream Of Dibber Store CHEP-IIIrd Udhampur 7. Furnishing of Bath Room of shift duty Quarter at B/R CHEP-III. 8. Restoration of damages to Spill Channel of BR including jungle and weed clearance along spill channel CHEP -III |
E-NIT No: 10 of 2018-19 | 17.11.2018 | 1. 2018_SPDC_65522_1 2. 2018_SPDC_65522_2 3. 2018_SPDC_65522_3 4. 2018_SPDC_65522_4 5. 2018_SPDC_65522_5 6. 2018_SPDC_65522_6 7. 2018_SPDC_65522_7 8. 2018_SPDC_65522_8 |
Xen CMD Udhampur | Civil | Udhampur JK | see document | see document | NIT | |
Budgetary offer | GDS/ 924-25 | 15.11.2018 | USHP-I | Electrical | Sumbal,Kangan JK | Offer | ||||
SITC of online vibration monitoring system for one unit | USHP II/GD/Tech/15 of 2018 | 12.11.2018 | 2018_SPDC_65422_1 | USHP-II | Electrical | Kangan, JK | 10.32 lacs | NIT | ||
Concreting of 132 kv switchyard | USHP II/GD/Tech/14 of 2018 | 12.11.2018 | 2018_SPDC_65421_1 | USHP-II | Civil | Kangan, JK | 16.78 Lac | NIT | ||
1. Repair to Dam surface from downstream side of Dam body El 730 to 843 BHEP Chanderkote by way of removing vegetation and shrinkomp treatment to dam surface. 2. Epoxy painting of steel liner of MRG gates, splitters and ledges of Dam body BHEP Chanderkote. | eNIT 11 of 2018-19 | 2018_SPDC_65294 | BHEP | Civil | Chanderkote, JK | 1. Rs-21.97 lacs 2. Rs-15.99 lacs |
60 days each | NIT | ||
Repair works at Stage I, BHEP Chanderkote | eNIT 10 of 2018-19 | 2018_SPDC_65294 | BHEP | Chanderkote, JK | 503.00 Lacs | 130 days | NIT | |||
Extension to Quotation No.7 | ESSD/Sgr/ 334-38 | 12.11.2018 | Estates | Civil | Srinagar, JK | Extension | ||||
Extension to Quotation No.1,2,3,4,5,6 | ESSD/Sgr/ 329- 33 | 12.11.2018 | Estates | Civil | Srinagar, JK | Extension | ||||
Rate for various Consumables | NIT No: GDS/ 03 of 2018-19 | 08.11.2018 | USHP-I | Supplies | Sumbhal/Ganderbal, JK | see document | see document | Notice | ||
Rate for various Spares | NIT No: GDS/ 04 of 2018-19 | 08.11.2018 | USHP-I | Supplies | Sumbhal/Ganderbal, JK | see document | see document | Notice | ||
Completion of automation of all three units of Power House USHP-II | USHP II/GD/Tech/609 | 29.10.2018 | USHP-II | Electrical | Kangan, JK | NIO | ||||
(i) Restoration of Subsidence zone of water conductor LJHP (section 1st) (ii) Restoration of Subsidence zone of water conductor LJHP(section 2nd) |
E-Tender NIT No:- CMD/LJHP/ 02 of 2018-19 | 06.11.2018 | LJHP | Civil | LJHP, JK | NIT | ||||
Repair/Restoration of store complex including providing and fixing of Door Shutters at PDC Complex Sopore | 02 OF 2018 and 06/11/2018 | 06.11.2018 | 2018_SPDC_64833_1 | XEN CID Sopore | Sopore, JK | NIT | ||||
Extension notice - I of e-NIT No 06 of 2018-19. | CMD/BHEP/716-23 | 06.11.2018 | BHEP | Chanderkote, JK | Extension | |||||
Extension notice - I of e-NIT No 07 of 2018-19. | CMD/BHEP/724-31 | 06.11.2018 | BHEP | Chanderkote, JK | Extension | |||||
Extension notice - II of e-NIT No 05 of 2018-19. | CMD/BHEP/732-39 | 06.11.2018 | BHEP | Chanderkote, JK | Extension | |||||
Supply of office furniture for Corporate Office | ESSD/Sgr/309-12 | 05.11.2018 | Estates | Civil | Srinagar, JK | Quotations | ||||
Several Supplies, Electrical and Mechanical works at Corporate Office, Srinagar and Guest House, Srinagar. | see zip file | -5.11.2018 | Estates | Civil | Srinagar, JK | Quotations | ||||
Corrigendum to eNIT 08 - CMD Udhampur | CMD/e-NlT/124/1600-1605 | 01.11.2018 | Civil | JK | corrigendum | |||||
eNIT03 of 2018 Complete Digitization, Indexing, Micro filming, Protection and Preservation of Records of JKSPDC Corporate Office dumped at Pampore Store. | ESSD/Sgr/273-279 | 29.10.2018 | see jktenders.gov.in | Estates | Civil | Srinagar, JK | NIT | |||
eNIT02 of 2018 Several civil works | ESSD/Sgr/266-72 | 29.10.2018 | see jktenders.gov.in | Estates | Civil | Srinagar, JK | NIT | |||
Design ,manufacture, Assembly, Testing, Supply, delivery, including installation ,testing and commissioning, trial run and adjustments as necessary for such an Outdoor oil immersed forced cooled, 3-phase ,50Hz, copper double wound 6000KVA(6MVA) Servo controlled Mannual, Automatic Voltage Regulator Transformer( 11KV/KV11) with panels and provision for bypass panel for use on system Voltage of 11 KV for synchronizing generator units with grid supply which varies from (5-11)KV at 3x1.5 MW MHEP Pahalgam. Providing, installation, testing and commissioning of , 150mꝪ����/hr discharge capacity pump,8”dia , 15hp Electric motor, 11mHead and 20m TDH pump, including 40mtr delivery pipe, C/R panel, and other necessary items for its complete operation at tailpool side of 3x1.5MW MHEP Pahalgam . |
GTD/PDC/Tech/ 660-62 | 29.10.2018 | Pahalgam | Pahalgam, JK | NIT | |||||
Extension notice -
1. Maintenance works to be executed in all offices and residential quarters at PDC Colony and JE blocks I and II of BHEP Chanderkote. 2. Maintenance works to be executed in residential quarters and allied works at Base Camp BHEP and Project Roads of BHEP Chanderkote. 3. Maintenance works to be executed in Power House Stage I, its adits and of Security related infrastructure of BHEP, Chanderkote. 4. Maintenance works to be executed at dam site including galleries and Dharmund and Baglihar Colonies of BHEP Chanderkote. |
CMD/BHEP/647-54 | 29.10.2018 | BHEP | Chanderkote, JK | Extension | |||||
Extension Notice No. 01 of Quotation No. GD/LJHP/1746-50 Dt:-16-10-2018 | GD/LJHP/1790-93 | 27.10.2018 | LJHP | Gantamulla, JK | Extension | |||||
Retender of eNIT 07 - CMD Udhampur | CMD/e-NIT/124/1588-92 | 26.10.2018 | Civil | JK | NIT | |||||
Flood damage repair for Karnah HEP | ECDK/261-64 | 22.10.2018 | Civil | JK | Dasti Quotation | |||||
Corrigendum eRfP of 25 MW Matchil-Kalaroos HEP. | JKSPDC/PMDP-2015/P-280/MHEP/7721-26 | 25.10.2018 | see jktenders.gov.in | Matchil Kalaroos HEP | Civil | JK | Corrigendum | |||
1. Repair to dam surface from downstream side of dam body EL 730 to 843 BHEP Chanderkote by way of removing vegetation and shrinkomp treatment to dam surface. 2. Epoxy painting of steel liner of MRG gates, splitters and ledges of dam body BHEP Chanderkote. |
NIT No.09 of 2018-19 | BHEP | Civil | Chanderkote, JK | see document | see document | NIT | |||
1. Installation of steel gates on openings of MRGs in power pack gallery/ entrances and painting on steel railings dam BHEP Chanderkote. 2. Fabrication of boat for plying across Chenab at karmail BHEP Chanderkote. 3. Laying of water pipeline on dam top and repair/ replacement of aluminum works in doors and windows alongside elevator in dam galleries. 4. Rimming and replacement of vertical drainage pipes in dam galleries BHEP Chanderkote. |
NIT No.08 of 2018-19 | BHEP | Civil | Chanderkote, JK | see document | see document | NIT | |||
a Design ,manufacture, Assembly, Testing, ,Supply, delivery, including installation ,testing and commissioning, trial run and adjustments as necessary for such an Outdoor oil immersed forced cooled, 3-phase ,50Hz, copper double wound 6000KVA(6MVA) Servo controlled Mannual, Automatic Voltage Regulator Transformer( HT/HT) with panels and provision for bypass panel for use on system Voltage of IIKV for synchronizing supply between generator and grid supply which varies from 5KV to 12 KV at 3x1.5 MW MHEP Pahalgam. b. Providing, installation, testing and commissioning of 8”dia, 15hp, 150 cum/hr discharge capacity,11mHead and 20m TDH pump, including 40mtr delivery pipe, panel, and other necessary items for its complete operation at tailpool side of 3x1.5MW MHEP Pahalgam. |
GTD/PDC/Tech/ 650-52 | 20.10.2018 | Pahalgam | Electro-Mechanical | Pahalgam, JK | NIT | ||||
Corrigendum to NIT 07 and 08 | CMD/e-NIT/1542-44 | 19.10.2018 | CHEP | Civil | Udhampur, JK | Corrigendum | ||||
1. Stabilization of sliding area downhill side of water conductor by providing check walls between RD 57500-59000 of water conductor of CHEP-I 2. Clearance /Restoration of Super passage at RD 1770 mt and 4350 mt of CHEP-III PDC Udhampur 3. Clearance of road causeway, strengthening of water conductor including berms, inspection road, escapes and spill channel of CHEP-II 4. Clearance of mulba from supply channel (O and M works at Diversion bund) CHEP-III 5. Channelization of River Tawi for smooth flow of water into supply channel for power generation CHEP-III (Part-I) 6. Channelization of River Tawi for smooth flow of water into supply channel for power generation CHEP-III (Repair to water conductor by way of plain cement concrete and plaster to plug the leakages RD 0 to 380 and 0 to 1560 M) (Shut down work) Part-II 7. General up keeping of inspection road, cross drainage structure of water conductor by way of laying WBM and wall from RD 1560 to 5018mts 8. Clearance of drains(Catch water and surface drains), choked culverts at places from RD 0’ to 11000’ of water conductor CHEP-Ist Tandhar Chenani 9. Surface dressing/ filling of ruts of service road from RD 0’ to 11000’ and RD 39500’ to RD 75000’ of service road(At spots) CHEP-Ist 10. Restoration of service road by way of removal of slips/ boulders at various RD’S from RD 25000’-75000’ of S/R CHEP-I 11. Construction of septic tanks and soakage pits at Guest house and sub-division office, Chenani. 12. Protection of guest house by way of construction of R/wall CHEP-Ist |
E-NIT 09 of 2018-19 | 20.10.2018 | 1. 2018_SPDC_63714_1 2. 2018_SPDC_63714_2 3. 2018_SPDC_63714_3 4. 2018_SPDC_63714_4 5. 2018_SPDC_63714_5 6. 2018_SPDC_63714_6 7. 2018_SPDC_63714_7 8. 2018_SPDC_63714_8 9. 2018_SPDC_63714_9 10. 2018_SPDC_63714_10 11. 2018_SPDC_63714_11 12. 2018_SPDC_63714_12 | CHEP | Civil | Udhampur, JK | see document | see document | NIT | |
1. Improvement of open water conductor by way of jacketing by M 25 RD 7100’ – 37000’ (At spots) shut down work of CHEP-I Chenani Udhampur RD 10557 m to RD 10629 m 2. Improvement of open water conductor by way of jacketing by M 25 RD 7100’ – 37000’ (At spots) shut down work of CHEP-I Chenani Udhampur RD 10875 m to RD 11019 m |
E-NIT 08 of 2018-19 | 17.10.2018 | 1. 2018_SPDC_63545_1 2. 2018_SPDC_63545_2 |
CHEP | Civil | Udhampur, JK | see document | see document | NIT | |
EPC Execution of 19MW Durbuk Shyok HEP in District Leh - Gist of the NIT. | JKSPDC/ PMDP-2015/P-280/DSHEP/7319-28 | 17.10.2018 | see jktenders.gov.in | Durbuk Shyok HEP | Civil | Leh, JK | NIT | |||
Strengthening of water conductor, inspection road and cross drainage structure RD (-) 700 to 1560 m CHEP -III | E-NIT 07 of 2018-19 | 17.10.2018 | 2018_SPDC_63543_1 | CHEP | Civil | Udhampur, JK | Rs 2.00 Lacs | 15 days | NIT | |
Supply of 100 Quintals of Fire Wood. | Quotation No. GD/LJHP/1746-50 | 16.07.2018 | LJHP | Gantamulla, JK | NIT | |||||
Repair of current carrying lead at Power House USHP-II | USHP II/GD/Tech/446 | 06.10.2018 | USHP-II | Electrical | Kangan, JK | NIT | ||||
Repairs of 250KVA/400A D.G Set 3 phase for Aux9iliary supply Service in LJHP | GD/LJHP/1725-28 | 13.07.2018 | LJHP | Electric | Gantamulla, JK | 0.42 lacs | 07 days | NIT | ||
1. Tile and Other Finishing Works Of A and C Blocks of Chenab Vihar Colony Of BHEP, Chanderkote. 2. Tile and Other Finishing Works of Block B of Chenab Vihar Colony Of BHEP, Chanderkote. 3. Tile and other miscellaneous Works of Block D at Chenab Vihar Colony of BHEP Chanderkote. 4. Construction of boundary wall around security camp at base camp including construction of two number watch towers and three number guard rooms at various locations of BHEP Chanderkote. 5. Barbed wire fencing to Project Land at places Part I at BHEP Chanderkote. |
NIT No.07 of 2018-19 | 16.10.2018 | BHEP | Civil | Chanderkote, JK | see document | see document | NIT | ||
1. Construction of View point and development of attached lawn at dam top (right bank) BHEP Chanderkote for Rs. 31.16 lacs 2. Construction of green strip near cladding wall, electric fitting to existing parks , tiling and concreting at intake of dam top BHEP Chanderkote for Rs. 26.59 lacs 3. Laying of kerb and grating on drains in adits of dam galleries BHEP Chanderkote for Rs. 13.10 lacs 4. Construction of retaining wall at left bank and in front of Nashri byepass tunnel dam BHEP Chanderkote for Rs. 17.71 lacs 5. Construction of site office at Dam top BHEP Chanderkote for Rs. 20.18 lacs 6. Construction of Quarter for watch and ward purpose at puldoda BHEP Chanderkote for Rs. 10.47 lacs 7. Barbed wire fencing of acquired land at Puldoda BHEP Chanderkote for Rs. 10.16 lacs |
NIT No.06 of 2018-19 | 16.10.2018 | BHEP | Civil | Chanderkote, JK | see document | see document | NIT | ||
Protection against shooting stones near TRT-II RD 2500 to portal of right bank tunnel and approach road to CR Audit BHEP-II Chanderkote | NIT No.12 of 2018-19 | 15.10.2018 | BHEP | Civil | Chanderkote, JK | 42.00 lacs | 120 days | NIT | ||
O and M works of CHEP-I | GEN/PDC/U/2810-14 | 15.10.2018 | 2018_SPDC_63447_1 | XEN GEN UDHM | Electro-mechanical works | Udhampur, JK | NIT | |||
Different Capital and O amd M works of CHEP-I and Bhaderwah HEP | GEN/PDC/U/2750-54 | 09.10.2018 | 2018_SPDC_63247_1 2018_SPDC_63257_1 |
XEN GEN UDHM | Electro-mechanical works | Udhampur, JK | NIT | |||
1. Maintenance works to be executed in all offices and residential quarters at PDC Colony and JE blocks I and II of BHEP Chanderkote. 2. Maintenance works to be executed in residential quarters and allied works at Base Camp BHEP and Project Roads of BHEP Chanderkote. 3. Maintenance works to be executed in Power House Stage I, its adits and of Security related infrastructure of BHEP, Chanderkote. 4. Maintenance works to be executed at dam site including galleries and Dharmund and Baglihar Colonies of BHEP Chanderkote. |
NIT No. 05 of 2018-19 | BHEP | Civil | Chanderkote, JK | EOI | |||||
Supply of 01 No. PLCC Interface panel (interface to LDC) including programming, cables and accessories at BHEP-II, Chanderkote District Ramban and Erection of 01 No. PLCC Interface panel (interface to LDC) including programming, cables and accessories at BHEP-II. Erection of 3 No.s PLCC Communication panels at Wanpoh Grid, District Anantnag, Kashmir and Kishanpur Grid, Manwal District Udhampur, Jammu. | NIT No. 01 of 2018-19 | 09/09/2018 | BHEP | Electrical | Chanderkote, JK | 30 days | EOI | |||
Protection of water conductor from RD 2395 M to RD 2480 M by way of filling of cavity beneath water conductor and construction of retaining Toe-Wall and laying of crates in sliding zone of Sewa-III HEP | e-nit No: 11 0f 2018 | 11.10.2018 | SEWA-III | Civil | Mashka Basohli, JK | Rs. 365.87 Lakh | 120 days | NIT | ||
1. Restoration of damaged/cracked R.C.C lining at places of water conductor between RD 33 to RD 383, RD 453 to RD 1593 and RD 1700 to RD 1800 of Sewa HEP stage-III Mashka (Basholi). 2. Restoration of damaged/cracked Rubble stone masonry parapets at places of water conductor RD 33 to RD 383, RD 453 to RD 1593 of Sewa HEP stage-III Mashka (Basholi). |
e-nit No: 12 0f 2018 | 11.10.2018 | SEWA-III | Civil | Mashka Basohli, JK | Rs. 102.64 Lakh | 60 days | NIT | ||
1. Restoration of damaged/washed off crates(River Protection Works) beyond D/s side of weir Axis of Diversion Structure at RD 87.5 Metres by way of stone filling and repair/construction of cut off R /wall 2. Restoration of Glacis and RCC Floor on D/s and U/s including sill beams at Head Works Site of SHEP-III |
e-nit No: 10 0f 2018 | 11.10.2018 | SEWA-III | Civil | Mashka Basohli, JK | Rs. 471.04 Lakh | 120 days | NIT | ||
Quotation Notice 9 - Servicing of water purifiers | ESSD/522-25 | 11.10.2018 | Estates | Civil | Satwari, Jammu, JK | Quotation | ||||
Quotation Notice 8 - Cleaning of tanks at Satwari, Janipur and Bhathindi | ESSD/512-15 | 11.10.2018 | Estates | Civil | Satwari, Jammu, JK | Quotation | ||||
Short term tender for different works of CHEP-I and II | NIT 27 to 30 | 31.08.2018 | 2018_SPDC_63069_1 2018_SPDC_63071_1 2018_SPDC_63072_1 2018_SPDC_63073_1 |
XEN GEN UDHM | Electro-mechanical works | Udhampur, JK | NIT | |||
Corrigendum for NIT 6 | JKSPDCL/FIN/DC-AMC/606-08 | 06.10.2018 | Corporate Office | IT | Jammu, JK | Corrigendum | ||||
Supply of 14MVA, 11/132KV Power Transformer for 3X35 MW LJHP and supervision during installation/testing /commissioning of Power transformer | GD/LJHP/01 of 2018-19 | 21.07.2018 | 2018_SPDC_58202_1 | LJHP | Electromechanical | Gantamulla, JK | Extension Notice | |||
Extension notice - Repairing/replacement of unit III generator coupling of (inner) dia 160mm by way of dismantling of coupling along with gearbox, its shaft from runner, replacement of damaged coupling, reinstallation of gearbox, runner and realignment / recommissioning ,(complete job) | GTD/PDC/Tech/ 534-35 | 19.09.2018 | MHEP, Pahalgam | Mechanical works | Pahalgam, JK | Extension Notice | ||||
Renovation of 6” dia sluice valve by way of replacement of 6” dia sluice valve and repairing/relaying of sluice valve pipe at forebay of MHEP Pahalgam. | GTD/PDC/Tech/02 of 2018 | 20.09.2018 | 2018_SPDC_ 62446_1 | MHEP, Pahalgam | Mechanical works | Pahalgam, JK | 6.9780 lacs | 45 Days | NIT | |
Different Electro-mechanical works | GEN/PDC/U/2602-06 | 26.09.2018 | Xen CCD Udhm | Civil | Udhampur, JK | NIT | ||||
Corrigendum to NIT 03 and 04 | USHP-II/CMD/990-1014 and 1015-1039 | 24.09.2018 | USHP-II | Civil | Kangan, JK | Corrigendum Notices | ||||
1. Painting of GIS floor with anti dust paint/epoxy paint (epoxy flooring) Complete job. 2. Drilling of drainage holes in various Adits of Power House Stage-II BHEP Chanderkote. Complete Job. |
NIT No.11 of 2018-19 | 19/09/2018 | BHEP | Civil | Chanderkote, JK | 8.00 Lacs | 60 days | NIT | ||
Cancellation of Tender NIT 07 dated 01.09.2018 | GTD/PDC/Tech/526-36 | 17.09.2018 | MHEP, Pahalgam | Mechanical works | Pahalgam, JK | Cancellation Notice | ||||
Extension Corrigendum of tender - Chief Geologist Building | ESSD/Sgr/201-08 | 18.09.2018 | Estates | Civil | Bemina, Srinagar, JK | Extension Notice | ||||
Corrigendum to NIT 02 and 04 | USHP-II/CMD/875-906 and 907-39 | 13.09.2018 | USHP-II | Civil | Kangan, JK | Corrigendum Notice | ||||
Engineering, procurement and construction (EPC) package for the work “Restoration of damaged slope protection works D/S Outfall- II”at BHEP Chanderkote, District Ramban, Jammu (JK State) | 04 of 2018-19 | 2018_SPDC_62023 | BHEP | Civil | Chanderkote, JK | 1363.00 Lacs | 325 days | NIT | ||
Extension notice - Supply, Installation, Testing, Calibration and Commissioning of TSD’s for TGB, LGB, UGB and Thrust Bearings and Hot Air Coolers for all three units (Complete Job) of 3x35 MW LJHP Baramulla | GD/LJHP/1538-42 | 18.09.2018 | 2018_SPDC_58201_1 | LJHP | Electromechanical | Gantamulla, JK | 16.98 lacs | 60 days | Gist | |
Comprehensive Annual Maintenance of Data Center Jammu | eTender Notice No: 06 | 18.09.2018 | Corporate Office | IT | Jammu, JK | see document | see document | Gist | ||
Corrigendum of tender - Chief Geologist Building | ESSD/Sgr/292-296 | 18.09.2018 | Estates | Civil | Bemina, Srinagar, JK | Corrigendum Notice | ||||
CONSTRUCTION OF CATCH WATER DRAIN | 04/CMD-WORKS OF 2018-19 | 13.09.2018 | 2018_SPDC_61704_1 | USHP-II | Civil | Kangan, JK | 10.18 Lacs | 30 Days | Notice | |
Supply , installation , Testing and Commissioning of open well submersible pump and G.I pipe line for dewatering of seepage water from Dam sump (EL. 714.00m) to tunnel outlet ( EL. 744.0m) of Baglihar Hydro Electric Project chanderkote | e-NIT No 19 of 2017-18 | 14.09.2018 | 2018_SPDC_61870_1 | BHEP | Electro-Mechanical | Chanderkote, JK | Rs. 42.30139 lac | 90 days | NIT | |
Overhauling of 130 HP submersible dewatering pump installed in dam galleries of BHEP | e-NIT No 18 of 2017-18 | 14.09.2018 | 2018_SPDC_61869_1 | BHEP | Electro-Mechanical | Chanderkote, JK | Rs. 12.626 lac | 60 days | NIT | |
(i) Restoration of damages to Downstream of super passage of Hankulnar Nallah of LJHP Gantamulla (section 1st) (ii) Restoration of damages to Downstream/upstream of super passage of Hankulnar Nallah of LJHP Gantamulla (section 2nd ) (iii) Clearance of shingle/boulders/ silt from super passage of Brimjinar Nallah near RD 1190 of LJHP Gantamulla (iv) Berm /Slip clearance from RD-26000 to RD-27200 of Canal inspection road on RHS of water conductor of LJHP. (v) Repair/ Renovation of Bathroom/Kitchen and other sanitary installations at Barrage and Divisional Office of LJHP Gantamulla. (vi) Repair/ Renovation of Bathroom/Kitchen and other sanitary installations of Chowkidar hut at Ushkura Baramulla including clearance of chocked drains. |
CMD/LJHP/ 01 of 2018-19 | 08.09.2018 | LJHP | Civil | Gantamulla, JK | see document | see document | Cancellation Notice | ||
1. Reconstruction of damaged panels near RD 10000 to 12000 of USHP-I Sumbal 2. Reconstruction of damaged panels near RD 21000 to 29000 of USHP-I Sumbal 3. Clearance/ removal of silt etc from Balancing Reservoir (BR-I) at Kullan (Sec-I) 4. Clearance/ removal of silt etc from Balancing Reservoir (BR-I) at Kullan (Sec-II) 5. Concrete protection by way of jacketing to right side of upstream of Head regulator. 6. Raising and jacketing of drain from Main gate to power house etc. 7. Construction of Chain link fencing at Headworks hut 8. Repair / Strengthening of Road upto power house by way of P/L WBM G-II in patches |
CMD/SVP/K/03 of 2018 | 14.09.2018 |
1. 2018_SPDC_61734_1 2. 2018_SPDC_61734_2 3. 2018_SPDC_61734_3 4. 2018_SPDC_61734_4 5. 2018_SPDC_61734_5 6. 2018_SPDC_61734_6 7. 2018_SPDC_61734_7 8. 2018_SPDC_61734_8 |
USHP-I/Ganderbal | Civil | Sumbhal/Ganderbal, JK | see document | see document | Notice | |
01 FACE LIFTING OF XEN’S ROOM 02 BERM CLEARANCE OF CANAL / APPROACH ROAD 03 CLEARANCE OF OVERLOAD OVERCONDUIT 04 CONSTRUCTION OF CATCH WATER DRAIN | 03/CMD-WORKS OF 2018-19 04/CMD-WORKS OF 2018-19 |
13.09.2018 | 2018_SPDC_61687_1 2018_SPDC_61691_1 2018_SPDC_61696_1 2018_SPDC_61704_1 |
USHP-II | Civil | Kangan, JK | NIT 03 NIT 04 |
|||
Installation of CCTV cameras at different locations of Dam for the purpose of operation and flow confirmation through intake, auxillary and spillway gates of BHEP Dam as per scope of work in SBD. | eNIT No.17 of 2018-19 | 10.09.2018 | 2018_SPDC_61366_1 | BHEP | Electrical | Chanderkote, JK | Rs. 5.1146 lac | 45 days | NIT | |
Supply of underwater camera with monitoring units for Dam site of 900MW BHEP as per SBD scope of work. | eNIT No.16 of 2018-19 | 10.09.2018 | 2018_SPDC_61365_1 | BHEP | Electrical | Chanderkote, JK | Rs. 2.12 lac | 30 days | NIT | |
Supply of TP items for BHEP as per SBD scope of work. | eNIT No.15 of 2018-19 | 10.09.2018 | 2018_SPDC_61364_1 | BHEP | Electro-Mechanical | Chanderkote, JK | Rs. 4 lac | 30 days | NIT | |
Supply of safety items for BHEP-II as per SBD scope of work. | eNIT No.12 of 2018-19 | 10.09.2018 | 2018_SPDC_61361_1 | BHEP | Miscellaneous | Chanderkote, JK | Rs. 3 lac | 30 days | NIT | |
Supply of safety items for BHEP-I as per SBD scope of work. | eNIT No.11 of 2018-19 | 10.09.2018 | 2018_SPDC_61360_1 | BHEP | Miscellaneous | Chanderkote, JK | Rs. 2 lac | 30 days | NIT | |
Repair to 65TON EOT crane installed in Gate Chamber of BHEP-I as detailed in SBD scope of work | eNIT No.10 of 2018-19 | 10.09.2018 | 2018_SPDC_61359_1 | BHEP | Mechanical | Chanderkote, JK | Rs. 8.352 lac | 60 days | NIT | |
Providing and fixing of aluminium faced pipe insulation on cooling water pipes laid inside power house and adjacent areas of 3x150 MW Baglihar hydroelectric project stage-II at Chanderkote, district Ramban, Jammu and Kashmir | eNIT No.09 of 2018-19 | 10.09.2018 | 2018_SPDC_61358_1 | BHEP | Mechanical | Chanderkote, JK | Rs. 8.98128 lac | 45 days | NIT | |
Supply Installation, testing and commissioning of Fire extinguishers, hydrant hose pipes and sand buckets in power house of BHEP-I | eNIT No.08 of 2018-19 | 10.09.2018 | 2018_SPDC_61357_1 | BHEP | Electro-Mechanical | Chanderkote, JK | 5 lac | 30 days | NIT | |
Repair works of Tail Race tunnel gates in respect of 450MW BHEP-II | eNIT No.07 of 2018-19 | 10.09.2018 | 2018_SPDC_61356_1 | BHEP | Mechanical | Chanderkote, JK | 10 lac | 60 days | NIT | |
Repair to the Expansion power supply card of Main Fire Alarm Control Panel (Simplex 4100 ES) of firefighting system of BHEP-II Chanderkote | eNIT No.06 of 2018-19 | 10.09.2018 | 2018_SPDC_61355_1 | BHEP | Electrical | Chanderkote, JK | Rs. 1.8 lac | 45 days | NIT | |
Installation of Earthing wire in Dam galleries of BHEP Chanderkote | eNIT No.05 of 2018-19 | 10.09.2018 | 2018_SPDC_61354_1 | BHEP | Electro-Mechanical | Chanderkote, JK | Rs. 1.97820 lac | 30 days | NIT | |
Installation of Earthing wire in Surge Shaft Emergency Gate Chamber of BHEP-I Chanderkote | eNIT No.04 of 2018-19 | 10.09.2018 | 2018_SPDC_61352_1 | BHEP | Electrical | Chanderkote, JK | Rs. 2.6268 lac | 30 days | NIT | |
Replacement of old/ damaged lighting fittings with energy efficient LED fittings in MRG gates power pack gallery and inspection gallery EL 766M in BHEP Dam Chanderkote | eNIT No.03 of 2018-19 | 10.09.2018 | 2018_SPDC_61351_1 | BHEP | Electrical | Chanderkote, JK | Rs. 4.92105 lac | 45 days | NIT | |
Replacement of old/ damaged lighting fittings with energy efficient LED fittings in BHEP dam inspection galleries El 714m, EL 736M and staircases from dam top to bottom on left bank side of BHEP DAM Chanderkote JK State | eNIT No.02 of 2018-19 | 10.09.2018 | 2018_SPDC_61350_1 | BHEP | Electrical | Chanderkote, JK | Rs. 9.96792 lac | 45 days | NIT | |
Replacement of old/ damaged lighting fittings with energy efficient LED fittings in Surge Shaft Emergency Gate Chamber and Collection Gallery Of Bhep-1 Chanderkote | eNIT No.01 of 2018-19 | 10.09.2018 | 2018_SPDC_61349_1 | BHEP | Electrical | Chanderkote, JK | Rs. 4.91067 lac | 45 days | NIT | |
1. Improvement of open water conductor by way of jacketing by M 25 RD 7100’ – 37000’ (At spots) of CHEP-I Chenani Udhampur RD 10629 m to RD 10731 m shut down work 2. Improvement of open water conductor by way of jacketing by M 25 RD 7100’ – 37000’ (At spots) of CHEP-I Chenani Udhampur RD 10731 m to RD 10875 m shut down work 3. Improvement of open water conductor by way of jacketing by M 25 RD 7100’ – 37000’ (At spots) of CHEP-I Chenani Udhampur RD 10491 m to RD 10557 m shut down work |
E-NIT 06 of 2018-19 | 12.09.2018 |
1. 2018_SPDC_61562_1 2. 2018_SPDC_61562_2 3. 2018_SPDC_61562_3 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | NIT | |
1. Providing protection to out fall of tail race channel CHEP-IInd shut down work 2. Renovation / up gradation of approach road to Power House including construction of drain and R Wall CHEP-IIIrd 3. Construction of kacha drain and cross drainage works along the RCC Duct from BR to Surge shaft including repair restoration of service road CHEP-IIIrd 4. Improvement of open water conductor by way of jacketing by M 25 RD 7100’ – 37000’ (At spots) shut down work of CHEP-I Chenani Udhampur RD 10080m to RD 10215m 5. Improvement of open water conductor by way of jacketing by M 25 RD 7100’ – 37000’ (At spots) of CHEP-I Chenani Udhampur RD 10425 m to RD 10491 m shut down work |
E-NIT 05 of 2018-19 | 12.09.2018 |
1. 2018_SPDC_61541_1 2. 2018_SPDC_61549_1 3. 2018_SPDC_61552_1 4. 2018_SPDC_61555_1 5. 2018_SPDC_61560_1 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | NIT | |
Corrigendum to CMD/SVP/K/02 of 2018 | CMD/SVP/K/ 525-543 | 13.09.2018 | USHP-II | Civil | Kangan, JK | Corrigendum Notice | ||||
Cancellation Notice to E-NIT No. 15 of 2017-18 dated: 22-11-2017 | GD/LJHP/1445-49 | 08.09.2018 | 2017_SPDC_47887_1 | LJHP | Electrical | Gantamulla, JK | Cancellation Notice | |||
Retender of tender - eNIT 01. 02. 03 and 04 | CMD/e-NIT/124/1242-46 | 11.09.2018 | Xen CCD Udhm | Civil | Udhampur, JK | Notice | ||||
Cancellation of tender - Green building | ESSD/J/409-429 | 12.09.2018 | Estates | Civil | Jammu, JK | Cancellation Notice | ||||
Repairing/replacement of unit III generator coupling of (inner) dia 160mm by way of dismantling of coupling along with gearbox, its shaft from runner, replacement of damaged coupling, reinstallation of gearbox, runner and realignment / recommissioning, (complete job). | GTD/PDC/Tech/472-73 | 10.09.2018 | MHEP, Pahalgam | Mechanical works | Pahalgam, JK | Offer | ||||
Several Civil Works in USHP-I and Old Ganderbal | CMD/SVP/K/02 of 2018 | 11.09.2018 | USHP-I/Ganderbal | Civil | Sumbhal/Ganderbal, JK | see document | see document | Notice | ||
1. Repair of office complex and sub division of USHP-II Kangan. 2. Construction of Steel Girder Foot Bridge ove Wangath Canal at Poshkar USHP-II Kangan 3. Up-Gradation of approach road by way of soiling and metaling from RD-4730M to 5250M of WLC U/S of BR Burnbugh. 4. Restoration of Irrigation Khul from Power House Gate to Foot Bridge of TRC USHP-II Kangan 5. Protection work to JKSPDCPark at exit of TRC USHP-II Kangan. 6. Construction of Pucca Drain downstream of Wangath Canal from RD-340 to 500M to check the seepage (downstream of H/W site) 7. Construction of retaining wall/drain at Panzin Village near house of Gh.Rasool Lone and Others. 8. Protection work to JKSPDC park along nallah Sindh USHP-II Kangan. |
E-NIT 02 | 10.09.2018 | 1. 2018_SPDC_61332_1 2. 2018_SPDC_61335_1 3. 2018_SPDC_61337_1 4. 2018_SPDC_61339_1 5. 2018_SPDC_61341_1 6. 2018_SPDC_61343_1 7. 2018_SPDC_61346_1 8. 2018_SPDC_61347_1 |
USHP-II | Civil | Kangan, JK | Notice | |||
RFP for 25 MW Machil HEP | JKSPDC/PMDP-2015/P-280/MHEP/5509-20 | 10.09.2018 | Machil, JK | EPC | Kashmir, JK | Limited tender | ||||
1. Construction of brick walling on back side of the Divisional office building CID PDC Bemina Srinagar. 2. Repairs and Renovation of Inspection Hut at Sonamarg including its maintenance. |
CID/Sgr/ 02 of 2017-18 | 10.09.2018 | Xen CID Srinagar | Civil | Srinagar, JK | see document | see document | NIT | ||
Several Civil Works for XEN CID Srinagar | CID/Sgr/ 01 of 2017-18 | 10.09.2018 | Xen CID Srinagar | Civil | Srinagar, JK | see document | see document | NIT | ||
Corrigendum notice for E-NIT No. 01 of 2018-19 dated: 05-09-2018 for Renovation of Geologist Office | ESSD/Sgr/256-63 | 10.09.2018 | Estates | Civil | Bemina, JK | Corrigendum Notice | ||||
Extension notice for E-NIT No. 01 of 2018-19 dated: 21-07-2018 | GD/LJHP/1459-63 | 08.09.2018 | LJHP | Electromechanical | Gantamulla, JK | Extension Notice | ||||
1.Providing and laying of Kerb Concrete in various Adits of Power House Stage-II BHEP Chanderkote 2.Painting / emulsion in Power House Stage-ll including minor repair works BHEP Chanderkote. |
NIT No.10 of 2018-19 | 31.08.2018 | BHEP | Civil works | Chanderkote, JK | see document | see document | NIT | ||
1. Repair/Renovation of D2 type quarter set no. 8 in CHEP colony Udhampur PDC Udhampur 2. Construction of drain in CHEP colony Udhampur along Executive Engineer quarter to main drain at Udhampur 3. Path/vehicle parking in Divisional office complex in CHEP colony Udhampur |
E-NIT 04 of 2018-19 | 05.09.2018 | 1. 2018_SPDC_60958_1 2. 2018_SPDC_60960_1 3. 2018_SPDC_60962_2 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | NIT | |
1. Improvement of water conducor by way of RCC lining/ PCC lining from RD 7100’-8200’ ,8800’-9600’, 12000’- 15000’ and 33000’- 31380’ (At spots) of CHEP-I Chenani UdhampurRD4500m to RD4650m) Shut down work 2. Improvement of water conductor by way of RCC lining/ PCC lining from RD 7100’-8200’ ,8800’-9600’, 12000’- 15000’ and 33000’- 31380’ (At spots) of CHEP-I Chenani Udhampur ( RD4650m to RD4800m) Shut down work 3. Improvement of open water conductor by way of jacketing by M 25 RD 7100’ – 37000’ (At spots) of CHEP-I Chenani Udhampur RD 10215 m to RD 10293m shut down work 4. Improvement of open water conductor by way of jacketing by M 25 RD 7100’ – 37000’ (At spots) of CHEP-I Chenani Udhampur RD 10359 m to RD 10425 m shut down work |
E-NIT 03 of 2018-19 | 04.09.2018 | 1. 2018_SPDC_60847_2 2. 2018_SPDC_60850_1 3. 2018_SPDC_60851_1 4. 2018_SPDC_60853_1 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | NIT | |
1. Fencing around old Balancing Reservoir of CHEP-IIIrd 2. Protection of rest house by way of laying of crates in madha nallah 3. Repair/Renovation of Executive Engineer quarter (2 no.) for official residence of Executive Engineer CMD PDC Udhampur and Executive Engineer Gen Div. PDC Udhampur 4. Repair/Renovation of quarter no. D-5 in CHEP colony Udhampur 5. Renovation of inspection road along spill channel of CHEP-IIIrd with paver 6. Improvement of open water conductor by way of jacketing by M 25 RD 7100’ – 37000’ (At spots) of CHEP-I Chenani Udhampur RD 10293 m to RD 10359 m shut down work |
E-NIT 02 of 2018-19 | 04.09.2018 | 1. 2018_SPDC_60845_1 2. 2018_SPDC_49908_3 3. 2018_SPDC_60809_2 4. 2018_SPDC_60821_1 5. 2018_SPDC_60825_1 6. 2018_SPDC_60827_1 |
XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | NIT | |
Renovation of 6” dia sluice valve by way of replacement of 6” dia sluice valve and repairing/relaying of 6”dia sluice valve pipe at forebay of MHEP Pahalgam | GTD/PDC/Tech/ 432-43 | 01.09.2018 | Pahalgam HEP | Electro-Mechanical works | Pahalgam, JK | 6.978 Lacs | 30 days | NIT | ||
1. Improvement of water conductor by way of RCC lining/ PCC lining from RD 7100’-8200’ ,8800’-9600’, 12000’- 15000’ and 33000’- 31380’ (At spots) of CHEP-I Chenani Udhampur ( RD4050m to RD4200m) Shut down work 2. Improvement of water conductor by way of RCC lining/ PCC lining from RD 7100’-8200’ ,8800’-9600’, 12000’- 15000’ and 33000’- 31380’ (At spots) of CHEP-I Chenani Udhampur ( RD4050m to RD4200m) Shut down work 3. Improvement of water conductor by way of RCC lining/ PCC lining from RD 7100’-8200’ ,8800’-9600’, 12000’- 15000’ and 33000’- 31380’ (At spots) of CHEP-I Chenani Udhampur RD4350m to RD4500m) Shut Down Work 4. Restoration/Black topping of road in Chennai Hydel Project colony Udhampur (with paver) 5. Removal of silt from Forebay tank of CHEP-I Udhampur Shut Down Work 6. Desilting of desilting chamber CHEP-Ist Chenani Udhampur Shut Down Work |
E-NIT 01 of 2018-19 | 31.08.2018 | 1. 2018_SPDC_60594_1 2. 2018_SPDC_60599_1 3. 2018_SPDC_60601_1 4. 2018_SPDC_60604_1 5. 2018_SPDC_60607_1 6. 2018_SPDC_60612_1 |
Xen CMD Udhampur | Civil | Udhampur, JK | see document | see document | NIT | |
Different Capital works of CHEP-I and II | GEN/PDC/U/2185-90 | 31.08.2018 | 2018_SPDC_60577_2 2018_SPDC_60581_1 2018_SPDC_60592_1 2018_SPDC_60598_1 |
XEN GEN UDHAMPUR | Electro-mechanical works | Udhampur, JK | NIT | |||
Spares, consumables and repair/restoration work. | GTD/PDC/Tech/ 376-77 | 27.08.2018 | Gas Turbine, Pampore | Electro-Mechanical works | Pampore, JK | Offer | ||||
1.Repair/restoration of 2 No 15KVA 3 phase,50Hz,415V Servo Stabilizers and its connected accessories by way of checking /inspection, rewinding of stabilizers 2 no ,replacement of its control panels 6 no, voltage meter2 no, Selector Switch 2 no, three phase Changeover Switch’s 2 no,MCB’S 3p,415v 2 no,, Indication lamps 8 no, Push buttons4 no ,toggle Switch Auto /Mannual 2 no, Servo stabiliser/transformer rotor with spindle 6 nos. 5 core 10 Sq. mm copper armored cable 150 ,MCCB’s 2 no ,Forward/Reverse MCCB;s 4 no ,Carriage from site to workshop and back to site complete job. 2. Rewiding /repair of 5 no 7.5 HP ,3 phase ,50HZ,415v,1470 rpm motors by way of checking/ dismantling, rewinding of damaged motors 5 no, replacement of damaged bearings 6 no, couplings 2 no, Reinstallation, Carriage from site to workshop and back to site complete job |
GTD/PDC/Tech/ 378-79 | 27.08.2018 | Gas Turbine, Pampore | Electro-Mechanical works | Pampore, JK | Offer | ||||
Complete Design, Engineering, Reverse Engineering, Manufacture, Supply, Installation, Testing, Commissioning and Performance testing of Main Butterfly Valve of 2000mm dia along with all accessories including complete dismantling and shifting old Butterfly valve to stores of 3 x 2.5 MWs horizontal Francis Turbine Generator units at Chenani Hydro Electric Project Stage – III on turnkey Basis. (as per detailed scope of work) | GEN/PDC/U/2149-54 | 29.08.2018 | 2018_SPDC_60398_1 | XEN GEN UDHAMPUR | Electro-mechanical works | Udhampur and Bhaderwah JK | NIT | |||
i. Operation and Maintenance Works of CHEP-I as per general scope of work in SBD. ii. Operation and Maintenance Works of CHEP-II as per general scope of work in SBD. iii. Operation and Maintenance Works of CHEP-III as per general scope of work in SBD. iv. Mechanical works of CHEP-I, II, III and Bhaderwah HEP as per general scope of work in SBD. |
GEN/PDC/U/2134-39 | 27.08.2018 | i. 2018_SPDC_60201_1 ii. 2018_SPDC_60204_1 iii. 2018_SPDC_60205_1 iv. 2018_SPDC_60206_1 |
XEN GEN UDHAMPUR | Electro-mechanical works | Udhampur and Bhaderwah JK | NIT | |||
Corrigendum - Change in venue of pre-bid meeting | ESSDJ/353-58 | 24.08.2018 | Estates, Jammu | Electrical/Civil | Jammu, JK | Corrigendum Notice | ||||
Corrigendum- I to the e NIT No 03 of 2018-19 | BHEP | Civil works | Chanderkote, JK | Corrigendum | ||||||
i. Complete Design, Engineering, Reverse Engineering, Manufacture, Supply, Installation, Testing, Commissioning and Performance testing of Digital Excitation system, Microprocessor based digital Governing System, including complete replacement and shifting to stores the Existing Excitation (AVR) system and Hydro Mechanical Governor System of 3 x 2.5 MWs horizontal Francis Turbine Generator units at Chenani Hydro Electric Project Stage – III. (as per detailed scope of work). ii. Complete design, engineering, manufacture, shop testing, supply, delivery of control, metering and monitoring system complete with control panels, controllers, and recorders, Erection, Testing and Commissioning of Control and Monitoring (SCADA) system of complete Power house of 3 x 2.5 MWs horizontal Francis Turbine Generator units at Chenani Hydro Electric Project Stage – III (as per detailed scope of work) |
GEN/PDC/U/2126-31 | 25.08.2018 | i. 2018_SPDC_60167_1 ii. 2018_SPDC_60172_1 |
XEN GEN UDHAMPUR | Electro-mechanical works | Udhampur, JK | NIT | |||
Renovation and Modernization of 2.5MW turbine of unit no: I and III so that it runs to its rated capacity at CHEP-III (as per detailed scope of work) | GEN/PDC/U/2120-25 | 25.08.2018 | 2018_SPDC_60070_1 | XEN GEN UDHAMPUR | Electro-mechanical works | Udhampur, JK | NIT | |||
Extension of NIT - Supply, Installation, Testing, Calibration and Commissioning of TSD’s for TGB, LGB, UGB and Thrust Bearings and Hot Air Coolers for all three units (Complete Job) of 3x35 MW LJHP Baramulla | 21.08.2018 | 2018_SPDC_58201_1 | LJHP | Electromechanical | Gantamulla, JK | 16.98 lacs | 60 days | Extension Notice | ||
Corrigendum for RfQ for Bonhar Lolab | JKSPDC/PMDP/BLHEP/4945 | 21.08.2018 | Bonhar Lolab | EPC | Kashmir, JK | Corrigendum | ||||
Corrigendum for RfQ for Ratan Nag | JKSPDC/PMDP/RNHEP/4946 | 21.08.2018 | Ratan Nag | EPC | Kashmir, JK | Corrigendum | ||||
Cancellation of E-RFQs for EPC execution of 19 MW Durbuk Shyok, 12 MW Tamasha , 14.1 MW Phagla HEPs | JKSPDC/Tech/PMDP-2015/4937-43 | 21.08.2018 | Durbuk Shyok, Tamasha and Phagla | EPC | Kashmir, JK | Cancellation Notice | ||||
Extension No 2 of EPC for Ratan Nag and Bonar Lolab under PMDP Scheme | JKSPDC/PMDP/RNHEP/4944 | 21.08.2018 | Bonar/Ratan Nag | EPC | Kashmir, JK | Extension Notice | ||||
Extension Notice No. 01 of E-NIT No. 01 of 2018-19 dated: 21-07-2018 | 11.08.2018 | 2018_SPDC_58202_1 | LJHP | Electromechanical | Gantamulla, JK | 100.00 lacs | 60 days | Extension Notice | ||
Supply, installation, testing and commissioning of transformer oil circulation motor for Power House USHP-II | USHP II/GD/Tech/343 | 13.08.2018 | USHP-II | Electrical | Kangan, JK | Notice | ||||
Wear and corrosion protection og spiral casing, stay vanes and stay rings for all the three units at Power House USHP-II | USHP II/GD/Tech/343 | 13.08.2018 | USHP-II | Mechanical | Kangan, JK | Notice | ||||
Replacement of shaft sleeves of unit II and unit III for Power House USHP-II | USHP II/GD/Tech/337 | 13.08.2018 | USHP-II | Mechanical | Kangan, JK | Notice | ||||
SITC of 100 hp dewatering VT pump/motor for Power House USHP-II | USHP II/GD/Tech/338 | 13.08.2018 | USHP-II | Mechanical | Kangan, JK | Notice | ||||
Overhauling of PRV of unit II of Power House USHP-II | USHP II/GD/Tech/339 | 13.08.2018 | USHP-II | Mechanical | Kangan, JK | Notice | ||||
Extension notice for E-NIT No. 02 of 2018-19 dated: 21-07-2018 | GD/LJHP/1255-59 | 11.08.2018 | 2018_SPDC_58201_1 | LJHP | Electromechanical | Gantamulla, JK | 16.98 lacs | 60 days | Extension Notice | |
Supply of Sintex tank of 10000 litres capacity of Diameter 83.6 inches and height 124.4 inches of Code No: CCWS 1000-03-TLW Make: Sintex Water Tank including of carriage up to Chanderkote and all taxes applicable. | NIT 03 | 10.08.2018 | BHEP | Civil | Chanderkote, JK | see document | see document | NIT | ||
Consultancy services for assistance in Operation and Maintenance/construction of Electro mechanical/ civil and Hydro Mechanical works of(2X450MW) BHEP stage I and II,Chanderkote | NIT 06 | 09.08.2018 | BHEP | Electric | Chanderkote, JK | see document | see document | Gist of NIT | ||
Extension Notice for NIT No 01 dated 14-07-2018 | 06.08.2018 | Kirthai | Civil | Kishtwar, JK | NIT | |||||
Several Hydromechanical works | 400-404 | 30.07.2018 | SEWA-III | Hydro Mechanical | Mashka Basohli, JK | NIT | ||||
Several Electromechanical works | 405-409 | 30.07.2018 | SEWA-III | Hydro Mechanical | Mashka Basohli, JK | NIT | ||||
Rewinding of 10 HP drinking water motors along with overhauling of pump at Margund colony of USHP-II Kangan | NIT No 8 | 30.07.2018 | USHP-II | Electromechanical | Kangan, JK | Notice | ||||
Supply. Installation, testing and commissioning of 200 hp cooling motor and 700 cum/hr pump assemblies complete of reputed make along with modification of pipe lines and foundation if needed | NIT No 9 | 30.07.2018 | USHP-II | Electromechanical | Kangan, JK | Notice | ||||
Budgetary offer | GDS/ 350-51 | 26.07.2018 | USHP-I | Electrical | Sumbhal, JK | see document | see document | Offer Notice | ||
Supply of Sintex tank of 10000 litres capacity of Diameter 83.6 inches and height 124.4 inches of Code No: CCWS 1000-03-TLW Make: Sintex Water Tank including of carriage up to Chanderkote and all taxes applicable. | eNIT 02 of 2018-19. | 2018_SPDC_58524 | BHEP | Civil | Chanderkote, JK | NIT | ||||
Extension of NIT | CID/DJ/PDC/562-67 | 27.07.2018 | CI&D | Jammu, JK | see document | see document | Notice | |||
Notice Inviting offers | USHP II/GD/tech/244 | 23.07.2018 | USHP-II | Supply | Kangan, JK | Notice | ||||
Extension of EPC for Ratan Nag and Bonar Lolab under PMDP Scheme | JKSPDC/PMDP/RNHEP/3795 | 25.07.2018 | Bonar/Ratan Nag | EPC | Kashmir, JK | Extension Notice | ||||
Several O&M Works | GTD/PDC/Tech/289-91 | 24.07.2018 | Pahalgam | Electromechanical | Pahalgam,JK | see document | see document | NIT | ||
Several Capital Works | GTD/PDC/Tech/292-94 | 21.07.2018 | Pahalgam | Electromechanical | Pahalgam,JK | see document | see document | NIT | ||
Sealed Quotation for items/sports equipment for JKSPDC Football team | JKSPDC/3623 | 23.07.2018 | Corporate Office | Supply | Srinagar, JK | Quotations | ||||
Supply, Installation, Testing, Calibration and Commissioning of TSD’s for TGB, LGB, UGB and Thrust Bearings and Hot Air Coolers for all three units (Complete Job) of 3x35 MW LJHP Baramulla. | GD/LJHP/02 | 21.07.2018 | 2018_SPDC_58201_1 | LJHP | Electromechanical | Gantamulla, JK | 16.98 lacs | 60 days | NIT | |
Supply of 14MVA, 11/132KV Power Transformer for 3X35 MW LJHP and supervision during installation/testing /commissioning of Power transformer | GD/LJHP/01 of 2018-19 | 21.07.2018 | 2018_SPDC_58202_1 | LJHP | Electromechanical | Gantamulla, JK | 100.00 lacs | 120 days | NIT | |
Engineering Procurement and Construction EPC pakage for work “ Restoration of Damaged slope protection works D/S out fall-II at BHEP, Chanderkote District Ramban. | NIT 01 of 2018-19 | 20.07.2018 | see jktenders.gov.in | BHEP | Civil | Chanderkote, JK | Rs 1363.00 lacs | 325 days | NIT | |
Expression of interest for Electronic Total Station (ETS) and Radar based Hydropower Plant Safety & Disaster Management System | NIT 01 of 2018-19 | 20.07.2018 | see jktenders.gov.in | BHEP | Civil | Chanderkote, JK | EOI Notice | |||
INVITING OFFERS FOR HIRING OFFICIAL ACCOMMODATION OF THE DIVISIONAL OFFICE OF THE EXECUTIVE ENGINEER CI&D DIVISION JKSPDC JAMMU | CID/DJ/PDC/514-18 | 20.07.2018 | CI&D | Jammu, JK | see document | see document | Notice | |||
Extension - Supply, Laying, Testing and Commissioning of fresh 11KV AB cable for replacement of damaged 11 KV cable at Rayil along with improvement of existing overhead 11 KV canal feeder by way of insertion of poles and re-stringing of conductor and other allied works | GDS/ 01 of 2018-19 | 26.06.2018 | USHP-I | Electrical | Sumbhal, JK | see document | see document | Extension Notice | ||
Repairs of reduction Gear Box of under sluice gate of Head works of 3x35MW LJHP | GD/LJHP/910-13 | 17.07.2018 | LJHP | Mechanical | Gantamulla, JK | 2.10 Lacs | 07 days | NIT | ||
Supply of spares | EPDK/JKSPDC/338-42 | 14.07.2018 | Sanjak | Supply of Spares | Kargil, JK | Request for Offer | ||||
Several Electromechanical works for Sanjak | EPDK/JKSPDC/333-37 | 14.07.2018 | Sanjak | Electrical/Electromechanical | kargil, JK | Request for Offer | ||||
Extension of NIT - Construction/laying of 17kms of 11KVsingle circuit line on 9mtr long steel tubular poles including 4.8Kms of11kv single line in composite with 33kv single circuit line on 11mtr steel tubular poles and creation of 11/0.433kv distribution sub stations including erection/laying 6kms of 3P4W LT network at Buderkund Ganderbal. | GDG/363-69 | 16.07.2018 | Ganderbal | Electromechanical | Ganderbal, JK | Extension Notice | ||||
Construction of two numbers of Chowkidar Huts | Quotation No. 7 | 16.07.2018 | Estates, Jammu | Electrical/Civil | Jammu, JK | Quotation | ||||
Construction of two numbers of Chowkidar Huts | Quotation No. 6 | 16.07.2018 | Estates, Jammu | Electrical/Civil | Jammu, JK | Quotation | ||||
Several offers for Marpachoo | see document | 14.07.2018 | Marpachoo | Electrical/Electromechanical | kargil, JK | Request for Offer | ||||
Several offers for Iqbal | see document | 14.07.2018 | Iqbal | Electrical/Electromechanical | kargil, JK | Request for Offer | ||||
Several offers for Haftal | see document | 14.07.2018 | Haftal | Electrical/Electromechanical | kargil, JK | Request for Offer | ||||
Several offers for Kargil Projects | see document | 14.07.2018 | Kargil Projects | Electrical/Electromechanical | kargil, JK | Request for Offer | ||||
Quotation for Office Supplies | NIT 09 of 2018-19 | 12.07.2018 | BHEP | Civil | Chanderkote, JK | Quotation | ||||
Quotation for Office Supplies | NIT 08 of 2018-19 | 12.07.2018 | BHEP | Civil | Chanderkote, JK | Quotation | ||||
Comprehensive Annual maintenance of hardware and software components of Data Center at Jammu | eNIT 05 | 10.07.2018 | Corporate Office | IT | Jammu, JK | GIST of NIT | ||||
Offer needed for several works at Karnah HEP (Electromechanical works) | ECDK/55-56 | 29.06.2018 | Karnah | Electromechanical | Karnah, JK | Offer Notice | ||||
1. Restoration of damaged/washed off crates(River Protection Works) beyond D/s side of weir Axis of Diversion Structure at RD 87.5 Metres by way of stone filling and repair/construction of cut off R /wall 2. Restoration of Glacis and RCC Floor on D/s and U/s including sill beams at Head Works Site of SHEP-III |
e-nit No: 06 of 2018 | 02.07.2018 | SEWA-III | Civil | Mashka Basohli, JK | Rs. 471.04 Lakh | 120 Days | NIT | ||
1. Restoration of Nallini Nallah at RD 1590 to RD 1664 on the upstream side and downstream side of cause way/water conductor by way of laying of crates for Sewa HEP Stage-III Mashka Basholi 2. Construction of Breast Wall at RD 2460 to RD 2485, RD 2580 to RD 2597 and RD 2615 to RD 2633 along the water Conductor of Sewa HEP Stage-III Mashka Basholi.) |
e-nit No: 05 of 2018 | 02.07.2018 | SEWA-III | Civil | Mashka Basohli, JK | Rs. 55.06 Lakh | 60 Days | NIT | ||
1. Restoration of damaged/cracked R.C.C lining at places of water conductor between RD 33 to RD 383, RD 453 to RD 1593 and RD 1700 to RD 1800 of Sewa HEP stage-III Mashka (Basholi). 2. Restoration of damaged/cracked Rubble stone masonry parapets at places of water conductor RD 33 to RD 383, RD 453 to RD 1593 of Sewa HEP stage-III Mashka (Basholi). |
e-nit No: 04 of 2018 | 02.07.2018 | SEWA-III | Civil | Mashka Basohli, JK | Rs. 102.64 Lakh | 60 Days | NIT | ||
Extension - Construction of Tunnel to bypass damaged project road near TRT-II of BHEP at Chanderkote Tehsil and Distt. Ramban. | PHD/BHEP/181-90 | 29.06.2018 | BHEP | Civil | Chanderkote, JK | 390 Lacs | 120 days | Extension Notice | ||
Extension of NIT - Construction/laying of 17kms of 11KVsingle circuit line on 9mtr long steel tubular poles including 4.8Kms of11kv single line in composite with 33kv single circuit line on 11mtr steel tubular poles and creation of 11/0.433kv distribution sub stations including erection/laying 6kms of 3P4W LT network at Buderkund Ganderbal.. | GDG/260-67 | 28.06.2018 | Ganderbal | Electromechanical | Ganderbal, JK | Extension Notice | ||||
Supply, Laying, Testing and Commissioning of fresh 11KV AB cable for replacement of damaged 11 KV cable at Rayil along with improvement of existing overhead 11 KV canal feeder by way of insertion of poles and re-stringing of conductor and other allied works | GDS/ 01 of 2018-19 | 26.06.2018 | USHP-I | Electrical | Sumbhal, JK | see document | see document | NIT | ||
1. Removal of Silt/Mulba from Canal from RD 0 to RD 383 ,of Sewa HEP Stage-III Mashka (Basholi) 2. Removal of slip/Mulba from catch water drain Berm on right side of water conductor from RD 33 to R 750 m and RD 1640 To RD 2400m at place. 3. Removal of silt from Patta Nallah in between Rd 0 to RD 129 Mtrs and syphon(under passage) of water conductor of Sewa HEP Stage-III Mashka(Basholi). |
e-nit No: 03 of 2018 | 26.06.2018 | SEWA-III | Civil | Mashka Basohli, JK | Rs. 22.251 Lakh | 45 Days | NIT | ||
1. Restoration of damaged/washed off crates(River Protection Works) beyond D/s side of weir Axis of Diversion Structure at RD 87.5 Metres by way of stone filling and repair/construction of cut off R /wall 2. Restoration of Glacis and RCC Floor on D/s and U/s including sill beams at Head Works Site of SHEP-III |
e-nit No: 02 of 2018 | 26.06.2018 | SEWA-III | Civil | Mashka Basohli, JK | 471.04 Lakh | 120 Days | NIT | ||
Several Quotations for Estates - Jammu | see document | 26.06.2018 | Xen Estates | Supplies | Jammu/Srinagar, JK | Quotation | ||||
1. Design, engineering / reverse engineering , manufacture , supply , erection , testing ,commissioning and performance testing of Micro processor based digital , hydraulic , Governing System with new OPU and pipe lines for Complete Replacement of Existing Hydro Mechanical Governor System of 3 x 2.5 MWs horizontal Francis Turbine Generator units of Chenani Hydro Electric Project stage – III , JK (as per detailed scope of work in SBD) 2. Design, engineering / reverse engineering , manufacture , supply , erection , testing , commissioning and performance testing of Digital Brushless Excitation control system for Complete Replacement of Existing Excitation (AVR ) system and overhauling of generators of 3 x 2.5 MWs horizontal Francis Turbine Generator units of Chenani Hydro Electric Project stage – III , JK (as per detailed scope of work in SBD) 3. Design, Engineering, Manufacture, Supply, dismantling Erection, testing and commissioning of 8 Nos. 6.6 KV, 1250 Amp, 25 KA Indoor type VCB panel and LAVT and NGR panels (3 Nos. each) for installed machines at CHEP-III (as per detailed scope of work). 4. Supply, Erection, Testing, Commissioning including dismantling of old material for 4 nos. Vaccum circuit breakers and 2 nos. Transformer Control, Relay and metering panel and 2 nos. 33KV Line Control, Relay and metering panel at CHEP-III (as per detailed scope of work) 5. Supply, Design, Engineering, manufacture, shop testing, delivery, erection, testing, commissioning including dismantling of 3 Nos. Generation metering panels and 3 Nos. Generation Relay panels in control room at CHEP-III (as per detailed scope of work) 6. Renovation and Modernization of 2.5MW turbine of unit no: I and III so that it runs to its rated capacity at CHEP-III (as per detailed scope of work) 7. Complete Design, engineering, Reverse Engineering, manufacture, Supply, Installation, testing and commissioning Butterfly Valve of 2000mm dia along with SCADA controlled operation system and other allied works at Chenani Hydro Electric Project Sage – III (as per detailed scope of work) |
GEN/PDC/U/673 | 23.06.2018 | 1. 2018_SPDC_53714_1 2. 2018_SPDC_53720_1 3. 2018_SPDC_54401_1 4. 2018_SPDC_54410_1 5. 2018_SPDC_54414_1 6. 2018_SPDC_54422_1 7. 2018_SPDC_54436_1 |
CHEP- III | Electro-Mechanical Works | Udhampur , JK | Quotation | |||
Corrigendum to Short Term Quotation for Purchase of RAM for servers | JKSPDC/DE/194 | 22.06.2018 | Corporate Office | Purchase | Jammu, JK | Quotation | ||||
Short Term Quotation for Purchase of RAM for servers | JKSPDC/DE/194 | 21.06.2018 | Corporate Office | Purchase | Jammu, JK | Quotation | ||||
Extension - Construction of Tunnel to bypass damaged project road near TRT-II of BHEP at Chanderkote Tehsil and Distt. Ramban. | PHD/BHEP/140-49 | 14.06.2018 | BHEP | Civil | Chanderkote, JK | 390 Lacs | 120 days | Extension Notice | ||
Extension of NIT - BHEP Insurance . | JKSPDC/F/674-82 | 11.06.2018 | Corporate Office | Insurance | Chanderkote, JK | Extension Notice | ||||
Extension of NIT - Construction/laying of 17kms of 11KVsingle circuit line on 9mtr long steel tubular poles including 4.8Kms of11kv single line in composite with 33kv single circuit line on 11mtr steel tubular poles and creation of 11/0.433kv distribution sub stations including erection/laying 6kms of 3P4W LT network at Buderkund Ganderbal. | GDG/188-95 | 04.06.2018 | Ganderbal | Electromechanical | Ganderbal, JK | Extension Notice | ||||
eNIT: All Risk Comprehensive Mega Insurance for BHEP | JKSPDC/F/628-44 of 2018 | 01.06.2018 | BHEP | Insurance | Chanderkote, JK | NIT | ||||
Cancellation Notice of E-NIT No. 24 of 2017-18 dated: 12-03-2018 | GD/LJHP/298-305 | 23.05.2018 | 2018_SPDC_52128_1 | LJHP | Electromechanical | Gantanmulla, JK | Cancellation Notice | |||
Construction of Tunnel to bypass damaged project road near TRT-II of BHEP at Chanderkote Tehsil and Distt. Ramban. | NIT NO. 7 of 2018-19 | 23.05.2018 | BHEP | Civil | Chanderkote, JK | 390 Lacs | 120 days | NIT | ||
Extension of NIT - Construction/laying of 17kms of 11KVsingle circuit line on 9mtr long steel tubular poles including 4.8Kms of11kv single line in composite with 33kv single circuit line on 11mtr steel tubular poles and creation of 11/0.433kv distribution sub stations including erection/laying 6kms of 3P4W LT network at Buderkund Ganderbal. | GDG/121-28 | 22.05.2018 | Ganderbal | Electromechanical | Ganderbal, JK | Extension Notice | ||||
Solar Projects/parks project consultancy | JKSPDC/Tech/Solar/95/S/735-37 | 23.05.2018 | Corporate Office | Consultancy | Srinagar, JK | EOI | ||||
Repair/replacement of plummer blocks, motor coupling and gear box to BR Burnbugh gate sites | USHP-II/MSD/16-18 | 12.05.2018 | USHP-II | Mechanical | HARIGANIWON KANGAN, JK | 1.10 Lacs | 7 days | NIT | ||
PROVIDING OF BARBED WIRE FENCING TO WATER CONDUCTOR AT RD 3060-3700M AT HARIGANIWON SLC | 01/CMD-WORKS OF 2018-19 | 14.05.2018 | 2018_SPDC_54333_1 | USHP-II | Civil | HARIGANIWON KANGAN, JK | 1600000 | 45 days | NIT | |
Extension of NIT - Construction of Tunnel to bypass damaged project near TRT-II of BHEP | eNIT NO. 5 of 2018-19 | 14.05.2018 | 2018_SPDC_53361_1 | BHEP | Civil | Chanderkote, JK | 390 Lacs | 180 days | NIT | |
Extension of NIT - Construction/laying of 17kms of 11KVsingle circuit line on 9mtr long steel tubular poles including 4.8Kms of11kv single line in composite with 33kv single circuit line on 11mtr steel tubular poles and creation of 11/0.433kv distribution sub stations including erection/laying 6kms of 3P4W LT network at Buderkund Ganderbal. | GDG/73-80 | 09.05.2018 | Ganderbal | Electromechanical | Ganderbal, JK | 287.00 Lacs | 06 months | Extension Notice | ||
Extension of Bid opening for 390 MW Kirthai-I | JKSPDC/P-214/380-89 | 14.05.2018 | Corporate Office/Kirthai-I | EOI | Corporate Office Srinagar, JK | Corrigendum | ||||
Extension of Bid opening for 390 MW Kirthai-I | JKSPDC/P-214/380-89 | 14.05.2018 | Corporate Office/Kirthai-I | EOI | Corporate Office Srinagar, JK | Corrigendum | ||||
1. Arresting leakages from turbine-1st by way of changing the seals of servo motor after dismantling and re-erection of parts with allied works. 2. Replacement of damaged brass seats and repairing of nozzle of 2 No. machines by way of dismantling of machines and re-erection with allied works at CHEP-I. 3. Replacement of seals of MIV to arrest leakages for M/c-V with dismantling of parts and re-erection and allied works at CHEP-I. 4. Dismantling to and fro carriage, rebabting of DE and NDE bearings and re-erection for M/c-I at CHEP-II. 5. Dismantling to and fro carriage, rebabting of thurst and journal bearing pads of M/c-I at CHEP-III. |
GEN/PDC/U/325-35 | 10.05.2018 | XEN GEN UDHM | Electromechanical | Udhampur, JK | NIT | ||||
Cancellation Notice No. 04 of E-NIT No. 23 of 2017-18 dated: 10-03-2018 - Renovation of 02 No Bathrooms at LJHP. | GD/LJHP/133-38 | 07.05.2018 | 2018_SPDC_52103_1 | LJHP | Civil | Gantamulla, JK | Cancellation Notice | |||
Manpower services for watch and ward - Corporate office Jammu | ESSDJ/96-99 | 05.05.2018 | XEN ESTATES | Manpower and staffing | Corporate Office Jammu, JK | Quotation | ||||
Corrigendum to Several works - CHEP-III | GEN/PDC/U/251 | 04.05.2018 | 1. 2018_SPDC_53714_1 2. 2018_SPDC_53720_1 |
XEN GEN UDHAMPUR | Electro-mechanical works | Udhampur, JK | Corrigendum | |||
Corrigendum - Supply for manpower for several works - BHEP-II | PHD/BHEP/57-60 | 03.05.2018 | BHEP | Civil | Chanderkote, JK | Corrigendum | ||||
Emergent repairs of cavity portion of water conductor of Sewa HEP-III Basohli by way of temporary restoration by way of laying of crates and earth filled empty cement bags. | e-nit No: 01 | 03.05.2018 | Ujh | Civil | Mashka Basohli, JK | Rs. 8.00 Lakh | 30 Days | NIT | ||
Supply for manpower for several works - BHEP-II | NIT NO. 6 of 2018-19 | 01.05.2018 | BHEP | Civil | Chanderkote, JK | NIT | ||||
1. Design, engineering / reverse engineering , manufacture , supply , erection , testing ,commissioning and performance testing of Micro processor based digital , hydraulic , Governing System with new OPU & pipe lines for Complete Replacement of Existing Hydro Mechanical Governor System of 3 x 2.5 MWs horizontal Francis Turbine Generator units of Chenani Hydro Electric Project stage – III , JK (as per detailed scope of work in SBD). 2. Design, engineering / reverse engineering , manufacture , supply , erection , testing , commissioning and performance testing of Digital Brushless Excitation control system for Complete Replacement of Existing Excitation (AVR ) system and overhauling of generators of 3 x 2.5 MWs horizontal Francis Turbine Generator units of Chenani Hydro Electric Project stage – III , JK (as per detailed scope of work in SBD) |
GEN/PDC/U/210-19 | 01.05.2018 | 1. 2018_SPDC_53714_1 2. 2018_SPDC_53720_1 | XEN GEN UDHAMPUR | Electro-mechanical works | Udhampur, JK | NIT | |||
Corrigendum - Markoot HEP (Request for expression of interest (EOI) NIT No: 1 OF 2018 Date:29-03-2018) | EE/CID/PDC/SPR/74-89 | 26.04.2018 | 2018_SPDC_53548 | XEN CID Sopore | Civil | Gurez, JK | Corrigendum | |||
Request for Qualification for Kalaroos - II (10.5 MW) | JKSPDC/PMDP/K2HEP | 25.04.2018 | 2018_SPDC_53548 | Kalaroos-II | Consultancy | Kalaroos, Kupwara, JK | RFQ | |||
Extension Notice No. 04 of E-NIT No. 23 of 2017-18 dated: 10-03-2018 - Renovation of 02 No Bathrooms at LJHP. | GD/LJHP/110-14 | 25.04.2018 | 2018_SPDC_52103_1 | LJHP | Civil | Gantamulla, JK | Extension Notice | |||
Construction/laying of 17kms of 11KVsingle circuit line on 9mtr long steel tubular poles including 4.8Kms of11kv single line in composite with 33kv single circuit line on 11mtr steel tubular poles and creation of 11/0.433kv distribution sub stations including erection/laying 6kms of 3P4W LT network at Buderkund Ganderbal. | GDG/01of 2018-19 | 18.04.2018 | Ganderbal | Electromechanical | Ganderbal, JK | 287.00 Lacs | 06 months |
NIT Vol-I Vol-II |
||
Construction of Tunnel to bypass damaged project near TRT-II of BHEP | eNIT NO. 5 of 2018-19 | 20.04.2018 | 2018_SPDC_53337_1 | BHEP | Civil | Chanderkote, JK | 390 Lacs | 180 days | NIT | |
Selection of Consultant for DPR - BIDDING PROCESS for 17 MW Markoot Gurez | EE/CID/PDC/SPR/45-59 | 19.04.2018 | XEN CID Sopore | Civil | Gurez, JK | Corrigendum | ||||
Extension notice - Renovation of 02 No Bathrooms at LJHP. | GD/LJHP/85-89 | 18.04.2018 | LJHP | Civil | Gantanmulla, JK | Extension Notice | ||||
Engagement of Consultant for the Construction of 1856 MW Sawalkote Hydro Electric Project HEP in Jammu and Kashmir State- Letter of intimation for issue of RFP | JKSPDC/P-76(IV)/929-43 | 20.04.2018 | Corporate Office | Consultancy | Sawalkote, JK | see document | see document | Letter | ||
Offers / Quotations different electromechanical works | GEN/PDC/U/129-32 | 16.04.2018 | XEN GEN UDHM | Electromechanical | Udhampur, JK | Quation | ||||
Annual Maintenance of Data Center Jammu | eTender Notice 388 | 07.04.2018 | Corporate Office | IT | Jammu, JK | see document | see document | NIT | ||
Corrigendum to Annual Maintenance of Data Center Jammu | eTender Notice 388 | 07.04.2018 | Corporate Office | IT | Jammu, JK | see document | see document | Corrigendum | ||
Cancellation of GDG/05 of 2017-18 | GDG/04-10 | 11.04.2018 | Ganderbal HEP | Electrical | Ganderbal, JK | see document | see document | Cancellation Notice | ||
Cancellation of eNIT no 13 | CMD/124/59-64 | 09.04.2018 | XEN CCD UDHM | Civil | Udhampur, JK | see document | see document | Cancellation Notice | ||
EOI for 390 MW Kirthai-I | JKSPDC/P-214/619 | 12.04.2018 | Corporate Office | Consultancy | Jammu, JK | see document | see document | NIT | ||
Annual Maintenance of Data Center Jammu | eTender Notice 388 | 07.04.2018 | Corporate Office | IT | Jammu, JK | see document | see document | NIT | ||
Extension notice - Construction of 02 No Bathrooms at LJHP. | GD/LJHP/41-45 | 07.04.2018 | LJHP | Civil | Gantanmulla, JK | Extension Notice | ||||
1. Temporary restoration at escape channel RD 40000ft of SP Canal Old Ganderbal by way of toe wall at Reshipora Village Ganderbal Sec-I
2. Temporary restoration at escape channel RD 40000ft of SP Canal Old Ganderbal by way of toe wall at Reshipora Village Ganderbal Sec-II 3. Temporary restoration at escape channel RD 40000ft of SP Canal Old Ganderbal by way of crate protection work at Reshipora Village Ganderbal Sec-III |
CMD/SVP/K/ 01 of 2018 | 07.04.2018 | 2018_SPDC-52937_1 2018_SPDC-52937_2 2018_SPDC-52937_3 |
Ganderbal | Civil | Ganderbal, JK | see document | see document | NIT | |
Anti-rodent treatment of whole power house BHEP-II, Chanderkote including all panels and other sensitive areas at all locations of the power house. | BHEP-II/11 of 2018 | 05.04.2018 | BHEP | Electrical | Chanderkote, JK | NIT | ||||
Change of Transformer oil, de-sludging, plugging of leakages in radiators, painting, testing and commissioning of 1 Bank (3 Nos. transformers) of 6.6/132 KV single phase, 5 MVA Transformers for 5 x 4.66 MWs Chenani Hydro Electric Project stage – Ist , JK (as per detailed scope of work in SBD) | GEN/PDC/U/41-50 | 05.02.2018 | 2018_SPDC_52767_1 | Xen Gen Udhampur | Electromechanical | Udhampur, JK | NIT | |||
Cancellation of tender notices | see documents | 03.04.2018 | BHEP | Several works | Chanderkote, JK | Cancellation Notice | ||||
Extension Notice No. 01 of E-NIT No. 26 | 29.03.2018 | 2018_SPDC_52206_1 | LJHP | Electrical | Gantanmulla, JK | NIT | ||||
Preparation of DPR OF Markoot Gurez HEP and assisting JKSPDC in procurement of EPC Contract for 17 MW Markoot Gurez HEP. | 01 OF 2018 | 30.03.2018 | 2018_SPDC_52653_1 | Xen CID Sopore | Civil | Gurez, JK | NIT | |||
Extension Notice No. 01 of E-NIT No. 25 | 29.03.2018 | 2018_SPDC_52140_1 | LJHP | Electromechanical | Gantanmulla, JK | NIT | ||||
Extension Notice No. 01 of E-NIT No. 24 | 29.03.2018 | 2018_SPDC_52128_1 | LJHP | Electromechanical | Gantanmulla, JK | NIT | ||||
Several Extensions of tenders - BHEP | see documents | 28.03.2018 | BHEP | Several works | Chanderkote, JK | Extension 1 Extension 2 |
||||
Extension Notice No. 01 of E-NIT No. 22 and 23 of 2017-18 dated: 10-03-2018 | GD/LJHP/4200-04 | 27.03.2018 | 2018_SPDC_52101_1 2018_SPDC_52103_1 |
LJHP | Civil | Gantanmulla, JK | NIT | |||
Different Electro-mechanical works from NIT No. 262 to 264 | GEN/PDC/U/3137-47 | 24.03.2018 | Xen Gen Udhampur | Electromechanical | Udhampur, JK | NIT | ||||
Creation of extra space in order to accommodation DGMs and making meeting hall functional. | CID/Sgr/ 07 of 2017-18 | 24.03.2018 | Xen CID Srinagar | Civil | Srinagar, JK | 1.15 Lac | 15 days | NIT | ||
Extension Notice for GDG/04of 2017-18 - Ganderbal | GDG/1978-85 | 23.03.2018 | 2017_SPDC_48182_1 | Ganderbal | Electromechanical | Ganderbal, JK | see document | see document | Extension Notice | |
Replacement of closing valves non return valves of compressor units including modification of pipe lines for checking of air leakage | USHP-II/GD/43 | 15.03.2018 | 2018_SPDC_52400_1 | USHP-II | Mechanical | Kangan , JK | 1.98 lacs | 30 days | NIT | |
Providing ,laying on HDPE cable trays, testing and commissioning of copper cable 95mm2 single core armored from control panels to various motors viz dewatering, EOC, cooling , drainage, leakage motors etc. in place of Aluminum cable at Power house | USHP-II/GD/42 | 15.03.2018 | 2018_SPDC_52399_1 | USHP-II | Electrical | Kangan , JK | 12.63 lacs | 30 days | NIT | |
Automation of starter panels of dewatering system of Power house | USHP-II/GD/41 | 15.03.2018 | 2018_SPDC_52397_1 | USHP-II | Electrical | Kangan , JK | 5.40 lacs | 30 days | NIT | |
Supply, Installation Testing and commissioning of 7.5 kVA DG sets for various gate sites of USHP-II Kangan | USHP-II/GD/40 | 14.03.2018 | 2018_SPDC_52396_1 | USHP-II | Electrical | Kangan , JK | 17.00 lacs | 30 days | NIT | |
Extension of several tenders (see documents) | BHEP | Electromechanical | Chanderkote, JK | Extension Elevator NIT Extension FF NIT Extension HVAC NIT |
||||||
Annual and Routine Maintenance of Hydro Mechanical and other allied equipments at BHEP-II | E-NIT 08 | 12.03.2018 | BHEP | Electro –Mechanical | Chanderkote, JK | 229.96467 lac | 24 months | NIT | ||
Extension of E-NIT 25 MW Machil Hydro Electric Project | JKSPDC/PMDP/MHEP/10352-57 | 16.03.2018 | 2018_SPDC_51118_1 | Corporate Office | Civil | Chanderkote, JK | Extension Notice | |||
Extension of E-NIT NO. 03 0F 2018 | PHD/BHEP/619 | 14.03.2018 | 2018_SPDC_51491_1 | BHEP | Civil | Chanderkote, JK | Extension Notice | |||
Renovation/Reconditioning of 16MVA 33KV 400V main auxiliary station by way of supply installation and commissioning of 33KV CTs PTs VCB Las 33KV main control and relay panel control cables and reconditioning of transformer etc. of 3x35MW LJHP | E-NIT No. 28 of 2017-18 | 15.03.2018 | 2018_SPDC_52267_1 | LJHP | Electrical | Gantamulla, JK | 25.52 Lacs | 60 days | NIT | |
Face lifting and interior office work at Corporate office, Srinagar | Tender Notice No: CID/Sgr/ 06 of 2017-18 | 14.03.2018 | Xen CID Kashmir | Civil | Srinagar, JK | 5.62 lacs | 35 days | NIT | ||
Renovation/Reconditioning of 132/33KV switch yard by replacement of damaged control cables post insulators and replacement of 33KV bus and allied works of 3x35MW LJHP | E-NIT No. 27 of 2017-18 | 14.03.2018 | 2018_SPDC_52207_1 | LJHP | Electrical | Gantamulla, JK | 30 Lacs | 60 days | NIT | |
Protection of Receiving Station at Peernia of 3x35MW LJHP | E-NIT No. 26 of 2017-18 | 14.03.2018 | 2018_SPDC_52206_1 | LJHP | Electrical | Gantamulla, JK | 20 Lacs | 60 days | NIT | |
Reconditioning and Restoration of fire Extinguishing System (Co2) of all three units including rifling of Co2 bank and portable fire extinguishers at 3X35MW LJHP | E-NIT No. 25 of 2017-18 | 13.03.2018 | 2018_SPDC_52140_1 | LJHP | Electromechanical | Gantamulla, JK | 10 Lacs | 60 days | NIT | |
Extension of - Overhauling of Pen Stock alongwith arresting of water leakages in penstock pipes by replacement of flux packing seals of 06 No expansion joints. (along with X-ray testing of penstocks of all units of 3x35MW LJHP. | GD/LJHP/3911-31 | 12.03.2018 | 2018_SPDC_51620_1 | LJHP | Electromechanical | Gantamulla, JK | see document | see document | NIT | |
Quotation for Supplies at Bathindi residential quarters - Jammu | Quotation No 11 | 13.03.2018 | Xen Estates | Supplies | Jammu/Srinagar, JK | Quotation | ||||
E - Request for Qualification from the eligible Applicants (single entity or a JV or a consortium) from any country or area in the world subject to Govt of India regulations, for Engineering, Procurement and Construction (EPC) of Durbuk Shyok Hydroelectric Power Project (19 MW) located on river Tangtse/ Durbuk Gong in District Leh, Jammu Kashmir, India. | JKSPDC/PMDP/DSHEP/10101-08 | 13.03.2018 | Corporate Office | Consultancy | Jammu/Srinagar, JK | RFQ | ||||
Supply, Installation, Testing, Calibration and Commissioning of TSD’s for TGB, LGB, UGB and Thrust Bearings and Hot Air Coolers for all three units (Complete Job) of 3x35 MW LJHP Baramulla. | E-NIT No. 24 of 2017-18 | 12.03.2018 | 2018_SPDC_52128_1 | LJHP | Electromechanical | Gantamulla, JK | 20 Lacs | 60 days | NIT | |
Construction of 02 No Bathroom at LJHP. | E-NIT No. 23 of 2017-18 | 10.03.2018 | 2018_SPDC_52103_1 | LJHP | Civil | Gantamulla, JK | 2 Lacs | 30 days | NIT | |
Renovation of 02 No. AEE’s Quarter at LJHP | E-NIT No. 22 of 2017-18 | 10.03.2018 | 2018_SPDC_52101_1 | LJHP | Civil | Gantamulla, JK | 6 Lacs | 60 days | NIT | |
Cancellation of NIT 20 | 03.03.2018 |
1. 2018_SPDC_51241 2. 2018_SPDC_51249 |
BHEP | Electromechanical | Chanderkote, JK | Cancellation Notice | ||||
Corrigendum to NIT 16 | 1908-20 | 01.03.2018 | LJHP | Civil | Gantamulla, JK | see document | see document | Corrigendum | ||
Cancellation of NIT No 23 dated 30.08.2017 | USHP-II/GD/3565-66 | 26.02.2018 | USHP-II | Civil | Kangan , JK | see document | see document | Cancellation Notice | ||
(i) Repairs to SE-1st Quarter of pdc colony at Ushkara Baramulla (ii) physical verification of civil stores of CMD LJHP Gantamulla Baramulla |
E-Tender NIT No:- CMD/LJHP/ 16 of 2017-18 | 01.03.2018 | LJHP | Civil | Gantamulla, JK | see document | see document | NIT | ||
Extension of several tenders (see documents) | BHEP | Electromechanical | Chanderkote, JK | Extension Elevator NIT Extension FF NIT Extension HVAC NIT |
||||||
Collection of dislodged wooden material along 11Km dilapidated wooden flume, its stacking, loading, transportation to Chandanwari stores from different locations including unloading and proper stacking in store yard | GD/LJHP/20 of 2017-18 | 15.02.2018 | 2018_SPDC_51251_1 | Mohra | Civil | Mohra, JK | 2.00 lacs | 30 days | NIT | |
Extension notice - Repair / Refurbishment of EOT crane 20 Ton Capacity for SEWA-III HEP (3x3 MW) | EPDJ/PDC/843 | 24.02.2018 | 2018_SPDC_50670_1 | SEWA-III | RMU | Kathua, JK | 30 days | Extension Notice | ||
Overhauling of Pen Stock alongwith arresting of water leakages in penstock pipes by replacement of flux packing seals of 06 No expansion joints. (along with X-ray testing of penstocks of all units of 3x35MW LJHP. | GD/LJHP/21 of 2017-18 | 26.02.2018 | 2018_SPDC_51620_1 | LJHP | Electromechanical | Gantamulla, JK | see document | see document | NIT | |
Cancellation of eNIT 19 of 2017-18 dated 06.01.2018 | GD/LJHP/3681-87 | 24.02.2018 | 2018_SPDC_49591_1 | LJHP | Electromechanical | Gantamulla, JK | see document | see document | Cancellation notice | |
Construction of tunnel to bypass the damaged project road near TRT Outfall-II BHEP | NIT 03 of 2017-18 | BHEP | Civil | Chanderkote, JK | 390 Lacs | 120 days | NIT | |||
Shifting , dragging , loading , unloading and dumping of Heavy Duty Lockers ( Fire Proof Lockers) Steel lockers and allied accessories from Corporate office basement store to Pampore store and also shifting of unserviceable material from Pampore store to Bemina store of JKSPDC Corporate office Srinagar including its carriage | Tender Notice No: CID/Sgr/ 05 of 2017-18 | 22.02.2018 | Xen CID Kashmir | Civil | Srinagar, JK | NIT | ||||
Corrigendum - Appointment of Cost Accounting firm for preparation of Cost Records of FY 2016-17 to 2018-19 | eNIT 02 | 22.02.2018 | Corporate Office | Consultancy | Jammu/Srinagar, JK | Corrigendum | ||||
Corrigendum for NIT 14 and NIT 15 | 21.02.2018 | LJHP | Civil | Gantamulla, JK | Extension Notice | Extension Notice | ||||
Corriendum to NIT 04 - Ganderbal | GDG/1699-1706 | 20.02.2018 | 2017_SPDC_48182_1 | Ganderbal | Electrical | Ganderbal, JK | see document | see document | Corrigendum Notice | |
Different Electromechanical Works from NIT No. 255 to 258 | GEN/PDC/U/2867-72 | 17.02.2018 | CHEP-III | Civil | Udhampur, JK | NIT | ||||
1. Epoxy painting of steel liner of MRG Gates, Splitters and ledges of Dam Body BHEP Chanderkote. 2. Repair to Dam Surface From Down Stream Side Of Dam Body (EL 730-843.00) BHEP CHANDERKOTE By Way Of Removing Vegetation and SHRIKKOMP Treatment to Dam Surface. |
NIT 20 | BHEP | Civil | Chanderkote, JK | see document | see document | NIT | |||
Collection of dislodged wooden material along 11Km dilapidated wooden flume, its stacking, loading, transportation to Chandanwari stores from different locations including unloading and proper stacking in store yard. | GD/LJHP/20 of 2017-18 | 15.02.2018 | 2018_SPDC_51251_1 | Mohra Power house | Civil | Mohra, JK | 2 Lacs | 30 days | NIT | |
Cancellation of eNIT 17 | NIT 17 |
2018_SPDC_50706_1 2018_SPDC_50709_1 |
BHEP | Civil | Chanderkote, JK | see document | see document | Cancellation Notice | ||
Extension notice - Repair / Refurbishment of EOT crane 20 Ton Capacity for SEWA-III HEP (3x3 MW) | EPDJ/PD/824 | 16.02.2018 | 2018_SPDC_50670_1 | SEWA-III | RMU | Kathua, JK | 30 days | Extension Notice | ||
NIT different electromechanical Works from NIT No. 249 to 254 | GEN/PDC/U/2850-54 | 16.02.2018 | CHEP-II | Civil | Udhampur, JK | NIT | ||||
Cancellation of different electromechanical Works from NIT No. 233 to 247 | GEN/PDC/U/2830-33 | 15.02.2018 | CHEP-III | Civil | Udhampur, JK | Cancellation notice | ||||
Corrigendum - Supply, Erection/laying, Testing and Commissioning of 33 KV/430 V, 100KVA substations with tapping line and tapping points for providing of standby power supply for operation of Canal Gates at Kulan Head Works, BR1 and Forebay at USHP-1 Sumbal, Kangan | GDS/2475-80 | 14.02.2018 | USHP-I | Electrical | Sumbhal, JK | see document | see document | Corrigendum | ||
Repairs to black Topped Canal Inspection Road in Patches of LJHP Gantamulla | CMD/LJHP/15 of 2017-18 | 14.02.2018 | LJHP | Civil | Gantamulla, JK | see document | see document | NIT | ||
(i)Repairs to SE-1st Quarter of pdc colony at Ushkara Baramulla (ii) Restoration of damages by way of Clearance of mulba from Super Passage at Brimjinar nallah at RD 1190’ of water conductor of LJHP |
CMD/LJHP/ 14 of 2017-18 | 14.02.2018 | LJHP | Civil | Gantamulla, JK | see document | see document | NIT | ||
Extension to NIT 04 - Ganderbal | GDG/1667-74 | 14.02.2018 | 2017_SPDC_48182_1 | Ganderbal | Electrical | Ganderbal, JK | see document | see document | Corrigendum Notice | |
Date extension and quantity change Corrigendum for PMC Karnah | JKSPDC/Karnah HEP/PMDP-2015/8516 | 14.02.2018 | 2018_SPDC_49373_1 | Karnah | PMC | Jammmu/Srinagar/Karnah, JK | see document | see document | Corrigendum | |
RFQ for 25 MW Machil Hydroelectric Power Project | JKSPDC/PMDP/MHEP/8375-84 | 13.02.2018 | 2018_SPDC_51118_1 | Corporate Office | Civil | Kupwara, JK | see document | see document | RFQ | |
Appointment of Law firm with experience in Energy Sector | JKSPDC/Legal/6383-89 | 12.02.2018 | Corporate Office | Legal Services | Jammu/Srinagar, JK | NIT | ||||
Appointment of Cost Accounting firm for preparation of Cost Records of FY 2016-17 to 2018-19 | eNIT 02 | 10.02.2018 | Corporate Office | Consultancy | Jammu/Srinagar, JK | NIT | ||||
Cancellation of NITs - Different Electromechanical Works from NIT No. 201 to 232 | GEN/PDC/U/2819-23 | 09.02.2018 | CHEP-I, II and III | Electro-Mechanical Works | Udhampur, JK | see document | see document | Cancellation Corrigendum | ||
Corrigendum CMD/SVP/K/02 and 03 of 2018 | CMD/SVP/K/02 of 2018 CMD/SVP/K/03 of 2018 |
08.02.2018 | USHP-I | Civil | Kangan, JK | see document | see document | Corrigendum Corrigendum |
||
1. Protection work around escape channel near RD 40000 ft of SP Canal Old Ganderbal Spot-5th (A and B). 2. Clearance/ Removal of Silt from forebay etc. of Power House USHP-I Sumbal | CMD/SVP/K/ 11 of 2017 -18 | 08.02.2018 | 2018_SPDC_50945_1 2018_SPDC_50945_2 |
USHP-I and Ganderbal | Civil | Kangan/Ganderbal, JK | 526000.00 | see document | NIT | |
Renovation of Sanitary system and face lifting of room | CID/Sgr/04 of 2017-18 | 07.02.2018 | see document | XEN CID Kashmir | Civil | Srinagar, JK | see document | see document | NIT | |
Construction of wall and movement of heavy duty lockers. | CID/Sgr/03 of 2017-18 | 07.02.2018 | see document | XEN CID Kashmir | Civil | Srinagar, JK | see document | see document | NIT | |
Construction of wall and movement of heavy duty lockers. | CID/Sgr/03 of 2017-18 | 07.02.2018 | see document | XEN CID Kashmir | Civil | Srinagar, JK | see document | see document | NIT | |
1. Renovation of existing drain downstream of Dibber store CHEP-III 2. Repair of telephone quarter at Forebay CHEP-I |
E-NIT 18 of 2017-18 | 07.02.2018 | 1. 2018_SPDC_50892_1 2. 2018_SPDC_50895_1 |
CHEP | Civil | Udhampur, JK | see document | see document | NIT | |
Design, providing, installation, testing and commissioning of SCADA controlled operation system for Butterfly Valve and complete refurbishment of Butterfly Valve of 2000mm dia of CHENANI HYDRO ELECTRIC PROJECT STAGE - III | GEN/PDC/U/RMU/e-NIT-248 | 05.02.2018 | 2018_SPDC_50838_1 | CHEP-III | RMU Works | Udhampur, JK | 30 days | NIT | ||
Corrigendum to eNIT 17 | CMD/eNIT/2894-98 | 05.02.2018 | 2018_SPDC_50719_1 |
CHEP | Civil | Chenani, JK | 7.00 Lacs | 45 days | Corrigendum | |
Different Electromechanical Works from NIT No. 233 to 247 | GEN/PDC/U/2771-76 | 05.02.2018 | 2018_SPDC_50822_1 | CHEP-III | Civil | Udhampur, JK | NIT | |||
Repair works at Stage I, BHEP Chanderkote | eNIT 19 | 2018_SPDC_50822_1 | BHEP | Civil | Chanderkote, JK | 690.00 Lacs | 180 days | NIT | ||
Clearance of silt etc from balancing reservoir BR 1 of USHP-I at Kullan. (Sec-II) | CMD/SVP/K/ 10 of 2017 -18 | 05.02.2018 | 2018_SPDC_50790_1 | USHP-I | Civil | Sumbal, JK | 1331000.00 | 45 days | NIT | |
Extension - All Risk Comprehensive Mega Insurance Policy for BHEP Stage I and II for year 2018-2019 | JKSPDC/FINANCE/4834-46 | 05.02.2018 | 2018_SPDC_49966_1 | Corporate Office | Insurance | Chanderkote, Ramban, JK | see document | see document | Extension | |
Repairs/Refurbishment of EOT crane 20 Ton capacity for SEWA-III HEP | e-NIT 03 OF 2017-18 | 01.02.2018 | SEWA-III | Electro mechanical work | Mashka Basoli, JK | 10.00 Lacs | 1month | NIT | ||
Repair/Renovation of Sub Divisional office at Chenani | E-NIT 17 of 2017-18 | 02.02.2018 | 2018_SPDC_50719_1 |
CHEP | Civil | Chenani, JK | 7.00 Lacs | 45 days | NIT | |
Services of Gym instructor | ESSDJ/1122 | 03.02.2018 | XEN Estates | Services | Jammu, JK | Notice for interview | ||||
Temporary Slope Protection work at R/S wing wall of TRT out fall Stage II by way of laying of Crates at BHEP Chanderkote. | NIT 18 | 2018_SPDC_50713_1 | BHEP | Civil | Chanderkote, JK | see document | see document | NIT | ||
1. Epoxy painting of steel liner of MRG Gates, Splitters and ledges of Dam Body BHEP Chanderkote. 2. Repair to Dam Surface From Down Stream Side Of Dam Body (EL 730-843.00) BHEP CHANDERKOTE By Way Of Removing Vegetation and SHRIKKOMP Treatment to Dam Surface. |
NIT 17 |
2018_SPDC_50706_1 2018_SPDC_50709_1 |
BHEP | Civil | Chanderkote, JK | see document | see document | NIT | ||
Repair of black topped Canal inspection road in patches of LJHP | CMD/LJHP/1333-45 | 01.02.2018 | see document | LJHP | Civil | Gantamulla, JK | 0.96 Lacs | 5 days | NIT | |
(i)Stabilization of subsidence zone near RD 12500' of water conductor LJHP (ii) Reconstruction /Restoration of damaged spillway Raft including sidewall on left side of spillway channel of LJHP Gantamulla |
CMD/LJHP/ 12 of 2017-18 | 30.01.2018 | see document | LJHP | Civil | Gantamulla, JK | see document | see document | NIT | |
Corigendum to NIT 04 - Ganderbal | GDG/1574-82 | 30.01.2018 | 2017_SPDC_48182_1 | Ganderbal | Electrical | Ganderbal, JK | see document | see document | Corrigendum Notice | |
Extension notice 3 for NIT No. 13 - Ganderbal | GDG/1583-90 | 30.01.2018 | 2017_SPDC_48609_1 | Ganderbal | Electrical | Ganderbal, JK | see document | see document | Extension Notice | |
Corrigendum 2 to NIT 15 - Design, Engineering, Supply, Installation, Testing and Commissioning of Dual Channel Digital Excitation System, Numerical Protective Relay and Control, Micro Processor based Digital Governor System along with HMC Cabinet and SCADA System for Unit-I of LJHP including dismantling of existing equipment. | GD/LJHP/3452-61 | 29.01.2018 | 2017_SPDC_47887_1 | LJHP | Electrical | Gantamulla, JK | 200.00 lacs | 150 days | Corrigendum Notice | |
Cancellation Notice of E-NIT No. 09 of 2017 dated: 07-11-2017 - Mohra | GD/LJHP/2412-16 | 27.01.2018 | 2017_SPDC_47269_1 | Mohra | Civil | Mohra,JK | see document | see document | Cancellation Notice | |
1. Renovation, Up graduation, and face lifting of residential huts at Powerhouse and Headwork’s of MHEP Pahalgam. 2. Constructionof Path ( staircase) from Powerhouse residential hut to Forebay of MHEP Pahalgam. 3. Fabrication/Providing and fixing of Stair case from bottom to top of forebay gates of MHEP Pahalgam. 4. Renovation of Control room by way of constructing and providing prefabricated structure in control room and machine hall for convenience of operational staff especially during winter season. |
GTD/PDC/Tech/05 of 2017-18 | 22.01.2018 | 1. 2018_SPDC_ 50474_1 Tender reference No: GTD/PDC/Tech/ 05 0f 2017-18 Dated: 22-01-2018 Organization chain: JKSPDC ǁ CE ( Generation ,Kashmir) 2. 2018_SPDC_ 50476_1 Tender reference No: GTD/PDC/Tech/ 05 0f 2017-18 Dated: 22-01-2018 Organization chain: JKSPDC ǁ CE ( Generation ,Kashmir) 3. 2018_SPDC_ 50477_1 Tender reference No: GTD/PDC/Tech/ 05 0f 2017-18 Dated: 22-01-2018 Organization chain: JKSPDC ǁ CE ( Generation ,Kashmir) 4. 2018_SPDC_ 50478_1 Tender reference No: GTD/PDC/Tech/ 05 0f 2017-18 Dated: 22-01-2018 Organization chain: JKSPDC ǁ CE ( Generation ,Kashmir) |
Pahalgam | Civil/Mechanical | Pahalgam,JK | see document | see document | NIT | |
Providing bath room facilities by way of construction of soak pits, providing electric and water supply fitting all complete for its huts in Powerhouse complex premises and at Headworks of MHEP Pahalgam | GTD/PDC/Tech/06 of 2017-18 | 23.01.2018 | 2017_SPDC_ 50423_1(Tender refrence No: enit 06 0f 2017-18 Dated: 23-01-2018 item no 1 ) | Pahalgam | Civil | Pahalgam,JK | see document | see document | NIT | |
Corrigendum - All Risk Comprehensive Mega Insurance Policy for BHEP Stage I and II for year 2018-2019 | JKSPDC/FINANCE/INS/18-19/01 of 2018 | 15.01.2018 | 2018_SPDC_49966_1 | Corporate Office | Insurance | Chanderkote, Ramban, JK | see document | see document | Corrigendum | |
Renovation of Sanitary System of store office building at Pampore. | CID/Sgr/1355-84 | 23.01.2018 | XEN CID Kashmir | Civil | Pampore, JK | NIT | ||||
Several civil works at Srinagar offices | CID/Sgr/ 01 of 2017-18 | 23.01.2018 | XEN CID Kashmir | Civil | Srinagar, JK | NIT | ||||
Short NIT for Electromechanical works |
GEN/PDC/U/NIT/2017-18/228-232 GEN/PDC/U/NIT/2017-18/201-227 |
20.01.2018 | XEN GEN UDHM | Electro-Mechanical Works | Chenani, JK | Dasti Quotation | ||||
Cancellation of NIT 10 | CMD/LJHP/1661-70 | 23.01.2018 | LJHP | Civil | Gantamulla, JK | Cancellation Notice | ||||
Cancellation of NIT 02 | CMD/LJHP/1673-84 | 23.01.2018 | LJHP | Civil | Gantamulla, JK | Cancellation Notice | ||||
Construction/Restoration of R/Wall at RD62100’ of Service Road including laying of BA Wire crates of CHEP-I | E-NIT 16 of 2017-18 | 22.01.2018 | 2018_SPDC_50304_1 |
CHEP | Civil | Chenani, JK | see documents | see documents | NIT | |
1. Construction/Restoration of damaged canal parapet along water conductor from RD 7100-17600 and RD 33000-37000 of WC of CHEP-I 2. Renovation of existing drain downstream of Dibber store CHEP-III 3. Repair of telephone quarter at forebay CHEP-I 4. Repair/Furnishing of rest house at Chenani including clearance of drains and bush cutting of CHEP colony Chenani 5. Repair/Restoration of drain in CHEP colony Udhampur office complex for proper drainage 6. Strengthening of water conductor by providing B.A wire crates, downhill side of WC at RD 53300,59100,59600 and 60800 of CHEP-I 7. Surface dressing/filling of ruts and jumps of service road from RD 0 to 11000’ of WC and RD 39500’ to RD 75000’ of S/R at places of CHEP-I 8. Whitewashing and painting office complex and repair to wood work |
E-NIT 15 of 2017-18 | 22.01.2018 | 1. 2018_SPDC_50289_1 2. 2018_SPDC_50293_1 3. 2018_SPDC_50295_1 4. 2018_SPDC_50296_1 5. 2018_SPDC_50297_1 6. 2018_SPDC_50300_1 7. 2018_SPDC_50302_1 8. 2018_SPDC_50303_1 |
CHEP | Civil | Chenani, JK | see documents | see documents | NIT | |
Extension of Dates - Engagement of PMC for providing Comprehensive Contract Management Services for Implementation of 12 MW Karnah HEP | JKSPDC/PMDP-2015/PMC/6876 | 22.01.2018 | See jktenders.gov.in | Karnah | Consultancy | Karnah, JK | see documents | see documents | Extension | |
Corrigendum to NIT 15 - Design, Engineering, Supply, Installation, Testing and Commissioning of Dual Channel Digital Excitation System, Numerical Protective Relay and Control, Micro Processor based Digital Governor System along with HMC Cabinet and SCADA System for Unit-I of LJHP including dismantling of existing equipment. | GD/LJHP/3372-81 | 20.01.2018 | 2017_SPDC_47887_1 | LJHP | Electrical | Gantamulla, JK | 200.00 lacs | 150 days | Corrigendum Notice | |
Notice inviting quotations for supply of construction of two number of chowkidar quarters at Residential Quarter Complex Bhathindi Jammu | Quotation No. 10 of 2018 | 20.01.2018 | XEN Estates | Civil | Jammu, JK | Notice Inviting Quotations | ||||
Reconditioning of expansion joints by cleaning of old oil, grease, rust and dirt from the expansion joints by applying kerosene oil / mineral spirit and with dhoti cloth and then tightening of nuts and bolts including replacements of damaged / old nuts and bolts, plugging of leakages etc. of Chenani Hydro Electric Project stage – I , Udhampur JK | GEN/PDC/U/2640 | 19.01.2018 | XEN GEN UDHM | Electro-Mechanical Works | Chenani, JK | Dasti Quotation | ||||
Routine Maintenance contract of all fire detection ,fire alarm, control ,protection and fire fighting system (including services and spares) of 3x150 MW Baglihar hydroelectric project stage-I at Chanderkote, district Ramban, Jammu and Kashmir for a period of 24 months. | e-NIT NO 05 of 2017-18 | 12.01.2018 | 2018_SPDC_49856_1 | BHEP | Electromechanical | Chanderkote, JK | 131.08 lacs | 730 days | NIT | |
All risk protection and Maintenance contract of HVAC System (including services, consumables, T and P items and spares) installed in power house of 3x150 MW Baglihar hydroelectric project stage-I at Chanderkote, district Ramban, Jammu and Kashmir for a period of 02 years. | e-NIT NO 06 of 2017-18 | 12.01.2018 | 2018_SPDC_49851_1 | BHEP | Electromechanical | Chanderkote, JK | 206.1 lacs | 730 days | NIT | |
All risk protection and Maintenance contract of OTIS elevators (02 no’s) (including services, consumables, T and P items and spares) installed in power house of 3x150 MW Baglihar hydroelectric project stage-I at Chanderkote, district Ramban, Jammu and Kashmir for a period of 24 months. | e-NIT NO 07 of 2017-18 | 12.01.2018 | 2018_SPDC_49853_1 | BHEP | Electromechanical | Chanderkote, JK | 19.02 lacs | 730 days | NIT | |
1. UPGRADATION OF FOREBAY ROAD OF USHP-II KANGAN 2. IMPROVEMENT OF APPROACH ROAD TO POWER CANAL AT RD-1800 M OF WLC INCLUDING CONSTRUCTION OF CULVERT 3. CIVILBALANCE PORTION OF FENCING FOR PARK AT EXIT OF TAILRACE CHANNEL OF USHP-II KANGAN | 07/CMD-WORKS OF 2017-18 | 18.01.2018 |
2018_SPDC_50094_1 2018_SPDC_50097_1 2018_SPDC_50099_1 |
USHP-II | Civil | Kangan , JK | 55.85 lacs | see document | NIT | |
1. UPGRADATION OF WANGATH CANAL SERVICE ROAD RD-0 TO 3700 M 2. UPGRADATION OF APPROACH ROAD AND BREAST WALL NEAR HEAD WORKS WANGATH 3. RENOVATION OF CHOWKIDAR QUARTER AT RD 3700M WLC 4. RCC TREATMENT TO DAMAGED GLACIES/FLOOR OF WANGATH H/W UNDER SLUICE 5. RESTORATION OF DRAIN FROM GRID STATION TO PARK NEAR POWER HOUSE SEC-II | 06/CMD-WORKS OF 2017-18 | 15.01.2018 |
2018_SPDC_50042_1 2018_SPDC_50044_1 2018_SPDC_50052_1 2018_SPDC_50068_1 2018_SPDC_50070_1 |
USHP-II | Civil | Kangan , JK | 14.23 Lacs | see document | NIT | |
Dismantling of main BFV, assessment of damages, cost of dismantling, cost of repair and cost of re-erection for smooth running of BFV of Chenani Hydro Electric Project stage – III , Udhampur JK | GEN/PDC/U/2625 | 17.01.2018 | 2017_SPDC_48182_1 | CHEP-III | Electro-Mechanical Works | Dibber, Udhampur , JK | see document | see document | Extension Notice | |
Extension notice for NIT No. 4 - Ganderbal | GDG/1443-51 | 16.01.2018 | 2017_SPDC_48182_1 | Ganderbal | Electrical | Ganderbal, JK | see document | see document | Extension Notice | |
Extension notice for NIT No. 13 - Ganderbal | GDG/1452-60 | 17.01.2018 | 2017_SPDC_48609_1 | Ganderbal | Electrical | Ganderbal, JK | see document | see document | Extension Notice | |
Extension of e-NIT BHEP-II/07 of 2017 , 08 of 2017 and 09 of 2017 | 17.01.2018 | See document | BHEP | Civil | Chanderkote, JK | see document | see document | Extension Notice | ||
Cancellation of Tenders - CMD Udhampur | CMD/eNIT/2548-53 and CMD/eNIT/2554-59 | 16.01.2018 | See document | Xen CMD Udhampur | Civil | Udhampur, JK | see document | see document | NIT | |
1. Repair/Renovation of Sub Divisional office at Chenani 2. Removal of Mulba/ Silt/ Slush/ Mud etc from Balancing Reservoir of CHEP-IIIrd Udhampur 3. Plugging of leakages in Balancing Reservoir CHEP-III Udhampur |
E-NIT 14 of 2017-18 | 12.01.2018 | 2018_SPDC_49908_2 2018_SPDC_49910_1 2018_SPDC_49911_1 |
Xen CCD Udhampur | Civil | Udhampur, JK | see document | see document | NIT | |
Extension of tender NIT 12 - Ganderbal | GDG/1435-42 | 15.01.2018 | Ganderbal | Electrical | Ganderbal, JK | see document | see document | Extension notice | ||
All Risk Comprehensive Mega Insurance Policy for BHEP Stage I and II for year 2018-2019 | JKSPDC/FINANCE/INS/18-19/01 of 2018 | 15.01.2018 | 2018_SPDC_49966_1 | Corporate Office | Insurance | Chanderkote, Ramban, JK | see document | see document | NIT | |
Corrigendum - CONSTRUCTION OF SUB-DIVISIONAL OFFICE CUM RESIDENTIAL BUILDING AT SAIKLOO MANDI, POONCH | CI&D/PDC/DJ/1280-1287 | 12.01.2018 | Xen CID Jammu | Civil | Poonch, JK | see document | see document | Corrigendum | ||
Supply. Installation, testing and commissioning of TUSHACO made screw type 210 LPM oil pumps at USHP II Kangan | USHP II/GDK/3000 | 13.01.2018 | USHP-II | Mechanical | Kangan | see document | see document | NIT | ||
Extension of NIT 08 and 10 of 2018 - Ganderbal | GDG/1424-31 | 12.01.2018 | Ganderbal | Electrical | Ganderbal | see document | see document | Extension Notice | ||
Expression of Interest for electrification of un-electrified remote villages of various districts under DDUGJY Scheme through Solar Power | JKSPDC/Tech/UnE/6332-34 | 12.01.2018 | Corporate Office | Electrical | JK | see document | see document | EOI
List Of Villages (Excel) |
||
1. Construction of accomodation facility outside HRT adit II for security personnel at BHEP Chanderkote. 2. Upgradation of road leading to JES residential quarters including construction of parking bay and allied works at PDC Chanderkote. |
e-NIT 16 | see jktender.gov.in | BHEP-I | Civil | Chanderkote, JK | see document | see document | NIT | ||
Corrigendum to NIT 15 - LJHP | GD/LJHP/3222-28 | 09.01.2018 | 2017_SPDC_47887_1 | LJHP | Electrical and Electronics | Gantamulla, JK | Corrigendum Notice | |||
Providing, Installation, Testing and Commissioning of 02 NOs 141 KW/ 200 HP Dewatering Pump for Drainage of water from sump located at the MIV floor of Power house, BHEP-II, JKSPDC, Chanderkote, Ramban, JK | e-NIT BHEP-II/10 | 09.01.2018 | see jktender.gov.in | BHEP-II | Electro Mechanical | Chanderkote, JK | 1 month from issuance of LOA | NIT | ||
1. Construction of septic tank and sokage pit inside JKSPDC Coloy Chanderkote 2. Construction of entry gates at Chief Engineer’s (civil) office complex and JKSPDC residential Colony Chanderkote 3. Up gradation of road leading to Chief Engineer (Electric) residential quarter and store facility with EMC at Seimen’s complex Chanderkote. |
eNIT 15 | see jktender.gov.in | BHEP | Civil | Chanderkote, JK | NIT | ||||
Appointment of Cost Accounting firm for preparation of Cost Records of FY 2016-17 to 2018-19 | NIT 01 | 09.01.2018 | Corporate Office | Consultancy | Jammu/Srinagar, JK | NIT | ||||
QUOTATIONS FOR MEASURING THE SAFE BEARING CAPACITY OF SOIL BY PLATE LOAD TEST | CID/DJ/PDC/1234-42 | 09.01.2018 | XEN CID Jammu | Civil | Reasi, JK | Rs. 0.49 LAC | 7 days | Extension Notice | ||
Extension notice for NIT No. 7 - Ganderbal | GDG/1387-94 | 09.01.2018 | 2017_SPDC_48295_1 | Ganderbal | Electrical | Ganderbal, JK | Extension Notice | |||
Extension notice for NIT No. 6 - Ganderbal | GDG/1379-86 | 09.01.2018 | 2017_SPDC_48294_1 | Ganderbal | Electrical | Ganderbal, JK | Extension Notice | |||
Extension of various dates for e-NIT 13 (Repair works at Stage I, BHEP Chanderkote - Civil and Hydro Mechanical works) of 2017-18 | 05.01.2018 | BHEP | Civil | Chanderkote, JK | see document | see document | Extension notice | |||
CANCELLATION NOTICE OF E-NIT 03 - XEN CID Jammu | CI&D/PDC/1210-17 | 06.01.2018 | XEN CID Jammu | Civil | Jammu, JK | Cancellation notice | ||||
Rewinding/overhauling of 200 HP 3 phase Induction cooling motor including its dismantling, carriage, reinstallation testing and commissioning at power house USHP II Kangan | USHP II/GDK/2839 | 02.01.2018 | USHP-II | Electrical | Kangan, JK | NIT | ||||
Restoration of water supply to control room/kitchen of 3.15 MVA 33/11kV receiving station at USHP II Kangan | USHP II/GDK/2838 | 02.01.2018 | USHP-II | Civil | Kangan, JK | NIT | ||||
Rewinding /overhauling of 60 HP 415 V induction motor of EOC unit II including dismantling carriage, reinstallation, testing and commissioning at USHP II | USHP II/GDK/2837 | 02.01.2018 | USHP-II | Civil | Kangan, JK | NIT | ||||
Construction Of foundation for 60 HP motor pump assembly of unit I including dismantling and reinstallation of existing motor pump set of unit I base no. 2 at power house USHP II kangan | USHP II/GDK/2836 | 02.01.2018 | USHP-II | Civil | Kangan, JK | NIT | ||||
Extension notice for NIT No. 5 - Ganderbal | GDG/1354-61 | 06.01.2018 | 2017_SPDC_48183_1 | Ganderbal | Electrical | Ganderbal, JK | 287.00 Lacs | 06 months | Extension Notice | |
Several Extensions for Ganderbal tenders | see documents | 06.01.2018 | Ganderbal | Electrical | Ganderbal, JK | see document | see document | Extension
Extension Extension Extension |
||
Overhauling of Pen Stock alongwith arresting of water leakages in penstock pipes by replacement of flux packing seals of 06 No expansion joints. (along with X-ray testing of penstocks of all units of 3x35MW LJHP. | E-Tender NIT No:- CMD/LJHP/19 of 2017-18 | 06.01.2018 | 2018_SPDC_49591_1 | LJHP | Electro-Mechanical | Gantamulla, JK | 42.00 lacs | 90 days | NIT | |
Cancellation of NIT 07 - LJHP | GD/LJHP/3131-37 | 03.01.2018 | 2017_SPDC_47267_1 | LJHP | Electro-Mechanical | Gantamulla, JK | see document | see document | Cancellation Notice | |
Cancellation Notice of e-NIT 10 of 2017 for work No 1. 2 and 5 | CMD/2437-42 | 04.01.2018 | Xen CMD Udhampur | Civil | Udhampur, JK | see document | see document | NIT | ||
Cancellation of NIT - CONSTRUCTION OF SUB-DIVISIONAL OFFICE CUM RESIDENTIAL BUILDING (COMPOSITE WORK i.e. CIVIL, ELECTRIC and PLUMBING COMPLETE) AT SAIKLOO MANDI POONCH. | CI&D/PDC/DJ/1193-1201 | 04.01.2018 | Xen CID Jammu | Civil | Poonch, JK | see document | see document | NIT | ||
(i)Renovation of division office building of civil maintenance division LJHP Gantamulla and including flooring of Generation division. | E-Tender NIT No:- CMD/LJHP/ 11 of 2017-18 | 04.01.2018 | LJHP | Civil | Gantamulla, JK | 120 days | NIT | |||
Desludging/Replacement of Turbine oil for all three units of 3x35MW LJHP. (Fresh Turbine oil servo57 to be replaced shall be provided by the JKSPDC). | GD/LJHP/18 of 2017-18 | 02.01.2018 | 2018_SPDC_49532_1 | LJHP | Electromechanical | Gantamulla, JK | 4.00 lacs | 30 days | NIT | |
Replacement of Oil and water Seals to avoid leakage in all the three units of 3X35 MW LJHP | GD/LJHP/17 of 2017-18 | 02.01.2018 | 2018_SPDC_49511_1 | LJHP | Electromechanical | Gantamulla, JK | 3.00 lacs | 30 days | NIT | |
Procurement of safety equipments and materials for operational staff of 3x35MW LJHP | GD/LJHP/16 of 2017-18 | 02.01.2018 | 2018_SPDC_49524_2 | LJHP | Electromechanical | Gantamulla, JK | 3.00 lacs | 30 days | NIT | |
Corrigendum - eNIT 02 - Xen CID Div PDC | CI&D/PDC/1180-88 | 03.01.2018 | See jktenders.gov.in | Xen CID Jammu | Civil | Jammu, JK | see documents | see documents | Corrigendum Notice | |
Corrigendum - Renovation and Modernization of canal gates at Headworks, Rayil Escape and Forebay of USHP-I, Sumbal | GDS/2271-76 | 03.01.2018 | See jktenders.gov.in | USHP-I | Electrical | Sumbhal, JK | see documents | see documents | Corrigendum Notice | |
Several extensions for Ganderbal tenders | see document | 02.01.2018 | See jktenders.gov.in | Ganderbal | Electrical | Ganderbal, JK | see documents | see documents | Notice 1
Notice 2 |
|
Engagement of PMC for providing Comprehensive Contract Management Services for Implementation of 12 MW Karnah HEP | JKSPDC/PMDP-2015/PMC/5624-32 | 01.01.2018 | See jktenders.gov.in | Karnah | Consultancy | Karnah, JK | see documents | see documents | Gist and NIT |