PDC Logo

Tender Notifications for Chenani-III-2017

Pre bid notifications

SNo. Description NIT NO. Date Link

Works Tenders

-
Description NIT NO. Date Associated eNIT No Type of Work Location of Work Cost of Work Time of Completion Link
1. Improvement to Water Conductor by way of RCC lining/PCC from RD 7100’-8200’, RD 8800’-9600’ Tandhar Chenani Udhampur (shut down work)
2. Improvement to Water Conductor by way of RCC lining/PCC from RD 33000’-37000’ Suina Chenani Udhampur (shut down work)
3. Improvement to water conductor by way of RCC lining/PCC lining from RD 12000 to 15000 Tandhar Chennai Udhampur (shut down work)
4. Fencing around old BR (BR Sub Div. CHEP-III)
E-NIT 13 of 2017-18 16.11.2017 1. 2017_SPDC_47552_1
2. 2017_SPDC_47561_1
3. 2017_SPDC_47566_1
4. 2017_SPDC_47570_1
Civil Chenani, Jammu JK see document see document NIT
Date Extension of E-NIT no. 06 of 2017-18 dt. 15-09-2017 (Tender ID 2017 _SPDC_45001_1) for the work - Removal of Mulba / silt / slush / mudetc. from Balancing reservoir CHEP-III Nil Nil Civil Udhampur, JK Corrigendum
1. Repair/Renovation of E-type residential quarters (8 no.)
2. Construction of protection work for WC at H/W of CHEP-III by way of laying crates/gabions
3. Construction of drain along the HRC to dispose off storm run off water form RD 1560 M to 5018 M of CHEP-III
4. Restoration of water conductor 5 no. causeways at places from RD 53800-61500
5. Repair /Renovation of Guest house at Forebay tank with deployment of Chowkidar for watch & ward CHEP-I
6. Fencing around old BR
E-NIT 09 of 2017-18 04.10.2017 1. 2017_SPDC_45917_1
2. 2017_SPDC_45920_1
3. 2017_SPDC_45922_1
4. 2017_SPDC_45926_1
5. 2017_SPDC_45930_1
6. 2017_SPDC_45931_1
Civil Udhampur, JK see document see document Notice
Extension of eNIT 06 dated 15.09.2017 CMD/NIT/1429-34 06.10.2017 2017_SPDC_45001_1 Civil Udhampur, JK see documents see document Notice
Cancellation of eNIT No 03 and eNIT 04 dated 02-08-2017 - Xen CCD Udhampur CMD/NIT/1467-72 10.10.2017 2017_SPDC_ 43202_1,2017_SPDC_43205_1, 2017_SPDC_ 43207_1 Civil Udhampur, JK Cancellation Notice
1. Construction of rooms including kitchen and bathroom for the shift duty staff of CHEP-II
2. Construction/Restoration of R walls/B walls at RD 11000 of WC of CHEP-I
3. Desilting of old desilting tank and open channel RD (-) 340 M to 1560 M of CHEP-III (shut down work)
4. Protection of outfall of spill channel at confluence with River Tawi CHEP-III Udhampur
5. Protection work at RD 69200 to 69600 by removal of exposed boulders on uphill side of road and laying of B.A wire crates and drain along service road of CHEP-I
6. Repair to water conductor from RD 9200-9400 at damaged/sinking spot by way of RCC lining including laying of B.A wire crates on the downhill side on the water conductor (shut down work) CHEP-I
7. Strengthening of water conductor/improvement of drains along WC from RD 7100-8200,9000-17600 and RD 33000-37000 of WC at places CHEP-I
8. Strengthening/Restoration of diversion bund at Head works of CHEP-III
E-NIT 08 of 2017-18 20.09.2017 1. 2017_SPDC_45259_1
2. 2017_SPDC_45260_1
3. 2017_SPDC_45268_1
4. 2017_SPDC_45262_1
5. 2017_SPDC_45263_1
6. 2017_SPDC_45264_1
7. 2017_SPDC_45265_1
8. 2017_SPDC_45267_1
Civil Udhampur, JK see document see document Notice
Corrigendum 1 and 2 to E-NIT 07 of 2017-18 - CHEP I,III E-NIT 07 of 2017-18 20.09.2017 Civil Udhampur, JK see document see document Corregendum 1
Corregendum 2
1. Construction of damaged parapets along the WC from RD 1560-5018 M of CHEP-III
2. Construction of kacha drain along service road from RD 40000 -50000 of service road at places of CHEP-I
3. Construction of R wall along the right side of WC to protect the sliding area between RD 1560-5018 M of CHEP-III
4. Construction/Restoration of damaged canal parapet along water conductor from RD 7100- 17600 and RD 33000-37000 of WC of CHEP-I
5. Construction of pacca drain for disposal of super passage water at RD 1770 M of CHEP-III
6. Protection to slide area near residential area along the left bank of WC from RD 1560-5018 M of CHEP-III
7. Protection to sliding area between RD (-) 650 M to (-) 632 M at Head works CHEP-III
8. Renovation of existing drain downstream of Dibber store CHEP-III
E-NIT 07 of 2017-18 18.09.2017 1. 2017_SPDC_45128_1
2. 2017_SPDC_45130_1
3. 2017_SPDC_45133_1
4. 2017_SPDC_45135_1
5. 2017_SPDC_45136_1
6. 2017_SPDC_45146_1
7. 2017_SPDC_45147_1
8. 2017_SPDC_45148_1
Civil Udhampur, JK see document see document Notice
Corrigendum to eNIT 06 - Civil works CHEP-III CMD/E-NIT/1262-67 16.09.2017 2017_SPDC_45001_1 Civil Kawa Distt Udhampur, JK Rs. 25.55 lacs 45 working days Notice
Civil works CHEP-III E-NIT no. 06 of 2017-18 15.09.2017 2017_SPDC_45001_1 Civil Kawa Distt Udhampur, JK Rs. 25.55 lacs 45 working days Notice
O&M works at Diversion bund of CHEP-III NIT no. 04 of 2017-18 08.09.2017 Civil Udhampur, JK Rs. 0.995 lacs 30 days Click here
Several E/M works several Udhampur projects Chenani-I, II,III and Bhaderwah GEN/PDC/U/NIT/2017-18/175-197 21.08.2017 Several E/M Udhampur, JK Click here
Corrigendum to eNIT No 01 of 2017-18 dated 15.07.2017 CMD/NIT/009-14 14.08.2017 2017SPDC_42512_4 Civil Chenani, JK see document see document Click here
E-NIT no. 01 of 2017-18 dt. 15-07-2017 CMD/NIT/960-64 05.08.2017 2017_SPDC_42512_4 Civil Chenani, JK See documents See documents Click here
1. Strengthening of water conductor/improvement of drains along water conductor from RD 7100-8200,9000-17600 and RD 33000-37000 of WC at places CHEP-I
2. Construction / Restoration of R walls/B walls at RD 11000 of WC CHEP-I
3. Repair to water conductor from RD 9200-9400 at damaged/sinking spot by way of RCC lining including laying of BA wire crates on the downhill side of WC (shut down work) CHEP-I
4. Protection work at RD 69200 to 69600 by removal of exposed boulders on uphill side of road and laying of BA wire crates and drain along service road of CHEP-I
5. Construction of rooms including kitchen and bathroom for the shift duty staff of CHEP-II
6. Desilting of old Desilting tank and open channel RD (-) 340M to 1560 M of CHEP-III
7. Strengthening/restoration of diversion bund at Head works of CHEP-III
8. Protection of outfall of spill channel at confluence with River Tawi CHEP-III Udhampur
NIT 03 of 2017-18 27.07.2017 Civil Dist Udhampur, JK See document See document Notice
Cancellation of eNIT 02 of 2016-17 CMD/124/NIT/841-45 01.08.2017 Civil Udhampur, JK see document see document Notice
Several Works for CHEP-I and CHEP-III NIT 02 of 2017-18 20.07.2017 Civil Udhampur,JK see document see document Notice
Supply of spares and miscellaneous items for CHEP-III GEN/PDC/U/NIT/2017-18/137 19.07.2017 Electro-mechanical works Dibber Udhampur, JK see document see document Notice
Removal of Mulba/ Silt/ Slush/ Mud etc from Balancing Reservoir of CHEP-IIIrd Udhampur E -NIT 02 of 2017-18 15.07.2017 2017_SPDC_42552_1 Civil Vill Kawa Tehsil and Distt Udhampur, JK Rs. 29.02 lacs 30 days Notice
Treatment of leakages in RCC duct CHEP-III Udhampur by way of laying of mild steel linear 1100mtr E-NIT 01 of 2017-18 15.07.2017 2017_SPDC_42512_4 Civil Vill Kawa Tehsil and Distt Udhampur, JK Rs. 774.00 lacs 195 working days (120 working days for Generation related items) Notice
Several electro-mechanical works GEN/PDC/U/NIT/2017-18/82-A and 83-A 06.07.2017 Electro-Mechanical Works Dibber, Udhampur see document see document Notice
Refurbishment of intake gate to aqueduct of CHEP-III GEN/PDC/U/NIT/2017-18/135 05.07.2017 Electro-Mechanical Works Dibber Udhampur, JK see document see document Notice
1. Renovation and Modernization of 2.5MW turbine of unit no: I and III so that it runs to its rated capacity at CHEP-III (as per detailed scope of work).
2. Erection of 11 KV 3 phase line on 9 mtr. ST poles, 50 mtr C/C with squirrel conductor including ROW, land compensation and cutting of trees at CHEP-III (as per detailed scope of work)
1. GEN/PDC/U/RMU/e-NIT/133
2. GEN/PDC/U/RMU/e-NIT/134
01.07.2017 2017_SPDC_42031_1
2017_SPDC_42032_1
RMU Works of CHEP-III Dibber, JK 45 days for each Notice
1. Complete refurbishment and motorization of two no. penstock intake gates with other allied works at Forebay of Chenani Hydro Electric Project Stage – I, Udhampur (as per detailed scope of work)
2. Complete refurbishment and motorization of two no. Escape gates with other allied works at Forebay of Chenani Hydro Electric Project Stage – I, Udhampur (as per detailed scope of work)
1. GEN/PDC/U/RMU/e-NIT/131
2. GEN/PDC/U/RMU/e-NIT/132
24.06.2017 1. 2017_SPDC_41881_1
2. 2017_SPDC_41883_1
RMU Works of CHEP-III Dibber, Udhampur, JK see document see document Notice
Several Electromechanical works - CHEP-III GEN/PDC/U/NIT/2017-18/128-130 22.06.2017 Electro-Mechanical Works Dibber, Udhampur, JK see document see document Notice
1. Complete design, engineering, manufacture, erection, testing and commissioning of one no. Canal Gate of size 3120mmx3000mm (clear opening) along with its embedment’s and hoisting arrangements complete at RD-2140 near MES intake point including construction of civil works with steel bridge on downside at CHEP-III (as per detailed scope of work)
2. Supply, Erection, Testing, Commissioning including dismantling of old material for 4 nos. Vaccum circuit breakers and 2 nos. Transformer Control, Relay and metering panel & 2 nos. 33KV Line Control, Relay and metering panel at CHEP-III (as per detailed scope of work)Providing and spreading of stone blast with concreting including earthing pits in upper switch yard at CHEP-III (as per detailed scope of work in SBD)
3. Supply, Design, Engineering, manufacture, shop testing, delivery, erection, testing, commissioning including dismantling of 3 Nos. Generation metering panels and 3 Nos. Generation Relay panels in control room at CHEP-III (as per detailed scope of work)
1. GEN/PDC/U/RMU/e-NIT/125
2. GEN/PDC/U/RMU/e-NIT/126
3. GEN/PDC/U/RMU/e-NIT/127
22.06.2017 1.2017_SPDC_41774_1
2. 2017_SPDC_41778_1
3. 2017_SPDC_41785_1
Electrical and Civil Dibber, Udhampur, JK see document see document Notice
Several RMU works (Electrical and Civil) for CHEP-III 1. GEN/PDC/U/RMU/e-NIT/120
2. GEN/PDC/U/RMU/e-NIT/121
3. GEN/PDC/U/RMU/e-NIT/122
4. GEN/PDC/U/RMU/e-NIT/123
5. GEN/PDC/U/RMU/e-NIT/124
21.06.2017 1. 2017_SPDC_41732_1
2. 2017_SPDC_41734_1
3. 2017_SPDC_41736_1
4. 2017_SPDC_41748_1
5. 2017_SPDC_41754_1
Electrical and Civil Dibber, Udhampur, JK see document see document Notice
Several Electromechanical works - CHEP-I and CHEP-III GEN/PDC/U/NIT/2017-18/104-119 16.06.2017 Several works Laddan and Dibber , JK 30 days Notice
Extention notice of several tenders - XEN Udhampur GEN/PDC/U/674 16.06.2017 Several works Laddan, Dibber and Sarthingal , JK Notice
Several Electromechanical works - Chenani-III GEN/PDC/U/NIT/2017-18/71-83 13.06.2017 Electro-Mechanical Works Udhampur , JK Notice
Dasti Quotation - Chenani-III GEN/PDC/U/631 12.06.2017 Electro-Mechanical Works Chenani, JK Notice
Cancellation of NIT Tender eNIT - 19 dated 25-01-2017 CMD/NIT/61-66 18-04-2017 civil Udhampur,JK See document See document Click here
Corrigendum to eNIT 19 - Chenani-III CMD/NIT/2024-29 22.02.2017 see tender Civil Chenani, JK see tenders see tenders Click here
Corrigendum for eNIT 19 CMD/NIT/2076-80 15.02.2017 see tender Chenani, JK see document see document Click here
Corrigendum to eNIT 19 CMD/NIT/2118-22 09.02.2017 see tender see tender Chenani, Jammu and Kashmir State - - Corrigendum
Construction / Restoration of damaged R/walls, Toe walls and check walls at RD 28200,30200 and 30400 of service road of CHEP-I (RMU) E-NIT 21 of 2016-17 02.02.2017 Civil Chenani, Udhampur, Jammu and Kashmir 15.58 lacs 40 days Notice
1. Raising walls of spill channel near start of fall no 3 of CHEP-III Udhampur
2. Providing of chain link fencing at the start of fall no 1 of spill channel of CHEP-III Udhampur
NIT 20 of 2016-17 30.01.2017 Civil Chenani, Udhampur, Jammu and Kashmir see document see document Notice
Treatment of leakages in RCC duct CHEP-III Udhampur by way of laying of mild steel linear 1100mtr E -NIT 19 of 2016-17 25.01.2017 2017_SPDC_36702_3 Civil Udhampur, Jammu and Kashmir 752.00 lacs 210 working days (120 working days for Generation related items) Notice
Repair/Renovation of power house CHEP-III NIT 18 of 2016-17 09.01.2017 2017_SPDC_36111_2 Civil Chenani, Jammu 14.85 Lacs 60 days NIT
Repair/Renovation of Power house of CHEP-III NIT 16 of 2016-17 10/12/2016 2016_SPDC_35371_2 Civil Udhampur, JK see document 60 days NIT
1 Construction / Restoration of damaged R/walls, Toe walls and check walls at RD 28200,30200 and 30400 of service road of CHEP-I (RMU)) 2 Construction / Restoration of damaged R/walls, Toe walls and check walls at RD 37050 and 37150 of service road of CHEP-I (RMU) 3 Construction/ Restoration of damaged R/walls, Toe walls and check walls at RD 37350 and 39000 of service road of CHEP-I (RMU) 4 Construction/Restoration of R/walls (from RD 39500 to RD 45000) at RD41100, 41200, 43450,43750,43900,44100,44300,44400 and RD 44600 of service road of CHEP-I (RMU) 5 Protection of slide area along water conductor of CHP-IIIrd at spots RD 2400 to 5018m E-NIT 14 of 2016-17 16.11.2016 Civil Udhampur, JK see document see document Click here
1. Construction / Restoration of damaged R/walls, Toe walls and check walls at RD 33050,33100 and 33350 of service road of CHEP-I (RMU) 2. Construction / Restoration of damaged R/walls, Toe walls and check walls at RD 37450 - 37500 of service road of CHEP-I (RMU 3. Construction/Restoration of R/walls (from RD 45000 to RD 48000) at RD 45050, 45250, 45450,45650,45700,45800,46100 and RD 46500 of service road of CHEP-I (RMU) 4. Construction/Restoration of R/walls (from RD 49000 to RD 50500) at RD 49000, 49300, 49500,49800,50050 and 50100 of service road of CHEP-I (RMU) NIT 13 of 2016-17 02.11.2016 Civil Udhampur, JK see document see document Click here
1. Construction / Restoration of damaged R/walls, Toe walls and check walls at RD 27150 of service road of CHEP-I (RMU) 2. Construction / Restoration of damaged R/walls, Toe walls and check walls at RD 38170 and 38410 of service road of CHEP-I (RMU) 3. Repair /renovation of shift duty quarter at Balancing reservoir of CHEP-III NIT 12 of 2016-17 02.11.2016 Civil Udhampur, JK see document see document Click here
Providing, fabrication & erection of Stairs along with platforms and other allied works along the Penstock of CHEP Stage-III GEN/PDC/U/RMU/e-NIT/105 28.10.2016 2016_SPDC_34320_1 Capital Works Dibber, Udhampur see document see document Click here
1. Construction of boundary wall at Dibber Store including providing and fixing of gate of CHEP-III. 2. Improvement to approach road to Power House CHEP-III, Udhampur NIT 10 of 2016-17 19.10.2016 Civil Udhampur, JK see document see document Click here
Several works of Water conductor system for Chenani-III eNIT No 08 of 2015 04.12.2015 see jktenders.gov.in Civil Chenani Jammu see document see document Click Here
Several Civil works for Chenani HEP Stage - III eNIT NO:- 8 of 2015 02.03.2015 see jktenders.gov.in Civil Chenani , JK See document See document Click Here
Several Civil Works - Chenani-I,III eNIT 07 of 2015 14.02.2015 See jktenders.gov.in Civil Chenani, JK See NIT doc See NIT doc Click Here
Cancellation of tender - Several Civil works in CMD Division for Chenani I and III CMD/NIT/1194-97 14.02.2015 See jktenders.gov.in Civil Chenani, JK See NIT doc See NIT doc Click Here
Several Civil works in CMD Division for Chenani I and III eNIT 05 of 2015 31.01.2015 See jktenders.gov.in Civil Chenani, JK See NIT doc See NIT doc Click Here