Pre Bid Notifications

Description
No.
Date
Link

Works Tenders

Description
NIT NO.
Date
Associated eNIT No
Project
Type of Work
Location of Work
Cost of Work
Time of Completion
Link
Extension of NIT - Construction of Tunnel to bypass damaged project near TRT-II of BHEP eNIT NO. 5 of 2018-19 14.05.2018 2018_SPDC_53361_1 BHEP Civil Chanderkote, JK 390 Lacs 180 days NIT
Corrigendum - Supply for manpower for several works - BHEP-II PHD/BHEP/57-60 03.05.2018 BHEP Civil Chanderkote, JK Corrigendum
Supply for manpower for several works - BHEP-II NIT NO. 6 of 2018-19 01.05.2018 BHEP Civil Chanderkote, JK NIT
Construction of Tunnel to bypass damaged project near TRT-II of BHEP eNIT NO. 5 of 2018-19 20.04.2018 2018_SPDC_53337_1 BHEP Civil Chanderkote, JK 390 Lacs 180 days NIT
Anti-rodent treatment of whole power house BHEP-II, Chanderkote including all panels and other sensitive areas at all locations of the power house. BHEP-II/11 of 2018 05.04.2018 BHEP Electrical Chanderkote, JK NIT
Cancellation of tender notices see documents 03.04.2018 BHEP Several works Chanderkote, JK Cancellation Notice
Several Extensions of tenders - BHEP see documents 28.03.2018 BHEP Several works Chanderkote, JK Extension 1
Extension 2
Extension of several tenders (see documents) BHEP Electromechanical Chanderkote, JK Extension Elevator NIT
Extension FF NIT
Extension HVAC NIT
Annual and Routine Maintenance of Hydro Mechanical and other allied equipments at BHEP-II E-NIT 08 12.03.2018 BHEP Electro –Mechanical Chanderkote, JK 229.96467 lac 24 months NIT
Extension of E-NIT NO. 03 0F 2018 PHD/BHEP/619 14.03.2018 2018_SPDC_51491_1 BHEP Civil Chanderkote, JK Extension Notice
Cancellation of NIT 20 03.03.2018 1. 2018_SPDC_51241
2. 2018_SPDC_51249
BHEP Electromechanical Chanderkote, JK Cancellation Notice
Extension of several tenders (see documents) BHEP Electromechanical Chanderkote, JK Extension Elevator NIT
Extension FF NIT
Extension HVAC NIT
Construction of tunnel to bypass the damaged project road near TRT Outfall-II BHEP NIT 03 of 2017-18 BHEP Civil Chanderkote, JK 390 Lacs 120 days NIT
1. Epoxy painting of steel liner of MRG Gates, Splitters and ledges of Dam Body BHEP Chanderkote.
2. Repair to Dam Surface From Down Stream Side Of Dam Body (EL 730-843.00) BHEP CHANDERKOTE By Way Of Removing Vegetation and SHRIKKOMP Treatment to Dam Surface.
NIT 20 BHEP Civil Chanderkote, JK see document see document NIT
Cancellation of eNIT 17 NIT 17 2018_SPDC_50706_1
2018_SPDC_50709_1
BHEP Civil Chanderkote, JK see document see document Cancellation Notice
Repair works at Stage I, BHEP Chanderkote eNIT 19 2018_SPDC_50822_1 BHEP Civil Chanderkote, JK 690.00 Lacs 180 days NIT
Temporary Slope Protection work at R/S wing wall of TRT out fall Stage II by way of laying of Crates at BHEP Chanderkote. NIT 18 2018_SPDC_50713_1 BHEP Civil Chanderkote, JK see document see document NIT
1. Epoxy painting of steel liner of MRG Gates, Splitters and ledges of Dam Body BHEP Chanderkote.
2. Repair to Dam Surface From Down Stream Side Of Dam Body (EL 730-843.00) BHEP CHANDERKOTE By Way Of Removing Vegetation and SHRIKKOMP Treatment to Dam Surface.
NIT 17 2018_SPDC_50706_1
2018_SPDC_50709_1
BHEP Civil Chanderkote, JK see document see document NIT
Routine Maintenance contract of all fire detection ,fire alarm, control ,protection and fire fighting system (including services and spares) of 3x150 MW Baglihar hydroelectric project stage-I at Chanderkote, district Ramban, Jammu and Kashmir for a period of 24 months. e-NIT NO 05 of 2017-18 12.01.2018 2018_SPDC_49856_1 BHEP Electromechanical Chanderkote, JK 131.08 lacs 730 days NIT
All risk protection and Maintenance contract of HVAC System (including services, consumables, T and P items and spares) installed in power house of 3x150 MW Baglihar hydroelectric project stage-I at Chanderkote, district Ramban, Jammu and Kashmir for a period of 02 years. e-NIT NO 06 of 2017-18 12.01.2018 2018_SPDC_49851_1 BHEP Electromechanical Chanderkote, JK 206.1 lacs 730 days NIT
All risk protection and Maintenance contract of OTIS elevators (02 no’s) (including services, consumables, T and P items and spares) installed in power house of 3x150 MW Baglihar hydroelectric project stage-I at Chanderkote, district Ramban, Jammu and Kashmir for a period of 24 months. e-NIT NO 07 of 2017-18 12.01.2018 2018_SPDC_49853_1 BHEP Electromechanical Chanderkote, JK 19.02 lacs 730 days NIT
Extension of e-NIT BHEP-II/07 of 2017 , 08 of 2017 and 09 of 2017 17.01.2018 See document BHEP Civil Chanderkote, JK see document see document Extension Notice
All Risk Comprehensive Mega Insurance Policy for BHEP Stage I and II for year 2018-2019 JKSPDC/FINANCE/INS/18-19/01 of 2018 15.01.2018 2018_SPDC_49966_1 Corporate Office Insurance Chanderkote, Ramban, JK see document see document NIT
1. Construction of accomodation facility outside HRT adit II for security personnel at BHEP Chanderkote.
2. Upgradation of road leading to JES residential quarters including construction of parking bay and allied works at PDC Chanderkote.
e-NIT 16 see jktender.gov.in BHEP-I Civil Chanderkote, JK see document see document NIT
Providing, Installation, Testing and Commissioning of 02 NOs 141 KW/ 200 HP Dewatering Pump for Drainage of water from sump located at the MIV floor of Power house, BHEP-II, JKSPDC, Chanderkote, Ramban, JK e-NIT BHEP-II/10 09.01.2018 see jktender.gov.in BHEP-II Electro Mechanical Chanderkote, JK 1 month from issuance of LOA NIT
1. Construction of septic tank and sokage pit inside JKSPDC Coloy Chanderkote
2. Construction of entry gates at Chief Engineer’s (civil) office complex and JKSPDC residential Colony Chanderkote
3. Up gradation of road leading to Chief Engineer (Electric) residential quarter and store facility with EMC at Seimen’s
complex Chanderkote.
eNIT 15 see jktender.gov.in BHEP Civil Chanderkote, JK NIT
Extension of various dates for e-NIT 13 (Repair works at Stage I, BHEP Chanderkote - Civil and Hydro Mechanical works) of 2017-18 05.01.2018 BHEP Civil Chanderkote, JK see document see document Extension notice