pdc_top.jpg (20861 bytes)
 PROJECT DETAILS                                                                                                                                                     HOME


Iqbal

1. Year of commissioning 1956
2. Installed capacity 3 x 1.25 = 3.75MW
3. Head 15 M
5. Length of water Conductor 1.5 Km