Sewa III
| 1. |
Year of commissioning |
2002 |
| 2. |
Installed capacity |
3 X 3 =9 MW |
| 3. |
Head |
38 M |
| 4. |
Length of Canal |
2.89 kms |
| 5. |
Location |
365.83 M |
|
State |
Jammu & KAshmir |
|
District |
Kathua |
| 6 |
Hydrology |
|
|
Catchment area at diversion
area |
494 Sq. Km |
|
50% dependable discharge |
24.13 cumecs |
|
75% dependable discharge |
6.94 cumecs |
| 7. |
Diversion Structures |
|
|
Type |
Barrage 113.50 met between
flanks |
| 8 |
Intake Staructure |
|
|
No. & wideth of bays |
One bay of 5 M |
|
Crest level |
590 M |
|
Design discharge |
36.62 cumecs |
| 9. |
Penstock |
|
|
Number |
3 |
|
Size |
1.9M dia. each |
|
Length |
62 M |
| 10. |
Power House |
|
|
Location |
Near Sudha NAllah on right
bank of river tawi. |
|
Type |
Pit type |
|
Gross Head |
42.80 M |
|
Net Head |
38.00 M |
|