PROJECT DETAILS
HOME
Karnah
1.
Year of Commissioning
1991 (I Unit)
19979II unit)
2.
Installed capacity
2 X 1=2MW
3.
Present Capacity
1 MW
4.
Net DesignHead
36 M
5
Length of the Diversion Structure
315 M
6
Maximum Discharge Capacity
8.496 Cumecs
.