Chennai III

1. Year of commissioning 2001
2. Installed capacity 3 x 2.5 = 7.5 MW
3. Head 74.4 M
4. BR Capacity 16560 Cusecs
5. Length of canal 5.753 Kms
6. Location
District Udhampur
Stage-II Latitude 32 Deg 52 Mn

Longitude 75 Deg 10 ME

5 Hydrology and climate condition
River Tawi
Catchment area upto power house stage-I 625 Sq. Kms
6. Water Conductor System
Total Length 5.753 Kms
Carrying Capacity
Diversion to desailting tank 15.0 cumecs
Desilting tank onwards 13.0 cumecs
Diameter of each pipe 1900 m
7. Power House
Location On the right bank of river Tawi at Kawa.
Installed Capacity 3 Units of 2.5 MW each
Type Surface
Size 45.30 M x 12.15 M
No. of Units 3 No.
Gross Head 80.0
Net head 74.7 M
Type of turbine Francis
9 Generator
No. and type 3 X 1000 KW Synchronous.