| 1. |
Year of commissioning |
2001 |
| 2. |
Installed capacity |
3 x 2.5 = 7.5 MW |
| 3. |
Head |
74.4 M |
| 4. |
BR Capacity |
16560 Cusecs |
| 5. |
Length of canal |
5.753 Kms |
| 6. |
Location |
|
|
District |
Udhampur |
|
Stage-II |
Latitude 32 Deg 52 Mn Longitude 75 Deg 10 ME |
| 5 |
Hydrology and climate
condition |
|
|
River |
Tawi |
|
Catchment area upto power
house stage-I |
625 Sq. Kms |
| 6. |
Water Conductor System |
|
|
Total Length |
5.753 Kms |
|
Carrying Capacity |
|
|
Diversion to desailting tank |
15.0 cumecs |
|
Desilting tank onwards |
13.0 cumecs |
|
Diameter of each pipe |
1900 m |
| 7. |
Power House |
|
|
Location |
On the right bank of river
Tawi at Kawa. |
|
Installed Capacity |
3 Units of 2.5 MW each |
|
Type |
Surface |
|
Size |
45.30 M x 12.15 M |
|
No. of Units |
3 No. |
|
Gross Head |
80.0 |
|
Net head |
74.7 M |
|
Type of turbine |
Francis |
| 9 |
Generator |
|
|
No. and type |
3 X 1000 KW Synchronous. |