Chenani II

1. Year of commissioning 1996
2. Installed capacity 2 X 1 =2 MW
3. Location
District Udhampur
Stage-II Latitude 32 Deg-55'N

Longitude 75 Deg-09 E

5 Hydrology and climate condition
River Tawi
Catchment area upto power house stage-I 652 Sq. Km
6. Water Conductor System
Total Length 2.315 Kms
Carrying Capacity 7.12 cumecs
7. Penstock
Feeder Penstock 50 M
Diameter 2600 mm.
Bifercation
No. of pipes 2
Length of each pipe 18 Mt.
Diameter of each pipe 1900m
8. Power House
Location Upstream of Salmey Acqueduct on left bank of river tawi
Installed Capacity 2 Units of 1 MW each
Type Surface
Size 26m x 11.4 m
No. of Units 2 No.s
Gross Head 32.50
Net head 32.50
Type of turbine Francis
Rated output 1 MW
9 Generator
No. and type 2 x 1000 Kw
Generating Volt. 415 V